Articles | Volume 26, issue 11
https://doi.org/10.5194/nhess-26-5957-2026
https://doi.org/10.5194/nhess-26-5957-2026
Research article
 | 
20 Nov 2026
Research article |  | 20 Nov 2026

Numerical analysis of dynamics between debris flows and wave propagation using multi-layer shallow water equations

Seungjun Lee, Hyunuk An, Minseok Kim, and Taeun Kang

Download

Interactive discussion

Status: closed

Comment types: AC – author | RC – referee | CC – community | EC – editor | CEC – chief editor | : Report abuse
  • RC1: 'Comment on egusphere-2025-1383', Anonymous Referee #1, 12 Sep 2025
    • AC1: 'Reply on RC1', Seungjun Lee, 24 Sep 2025
  • RC2: 'Comment on egusphere-2025-1383', Matteo Barbini, 16 Mar 2026
    • AC2: 'Reply on RC2', Seungjun Lee, 23 Mar 2026

Peer review completion

AR – Author's response | RR – Referee report | ED – Editor decision | EF – Editorial file upload
ED: Reconsider after major revisions (further review by editor and referees) (15 May 2026) by Rachid Omira
AR by Seungjun Lee on behalf of the Authors (28 May 2026)  Author's response   Author's tracked changes   Manuscript 
ED: Referee Nomination & Report Request started (18 Jun 2026) by Rachid Omira
RR by Anonymous Referee #3 (04 Oct 2026)
ED: Publish subject to minor revisions (review by editor) (22 Oct 2026) by Rachid Omira
AR by Seungjun Lee on behalf of the Authors (29 Oct 2026)  Author's response   Author's tracked changes   Manuscript 
ED: Publish as is (12 Nov 2026) by Rachid Omira
AR by Seungjun Lee on behalf of the Authors (13 Nov 2026)  Manuscript 
Download
Short summary
During heavy rain, fast flows of mud, rock, and water may grow by eroding, carrying, and depositing soil before entering reservoirs. We built and tested a streamlined computer model that follows this process along the main flow path, making it efficient for many safety scenarios. Applied to a reservoir failure in South Korea, the model showed that the momentum of the incoming flow helps predict wave height, supporting better water-level management and dam safety planning.
Share
Altmetrics
Final-revised paper
Preprint