<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD Journal Publishing with OASIS Tables v3.0 20080202//EN" "https://jats.nlm.nih.gov/nlm-dtd/publishing/3.0/journalpub-oasis3.dtd">
<article xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:oasis="http://docs.oasis-open.org/ns/oasis-exchange/table" xml:lang="en" dtd-version="3.0" article-type="research-article">
  <front>
    <journal-meta><journal-id journal-id-type="publisher">NHESS</journal-id><journal-title-group>
    <journal-title>Natural Hazards and Earth System Sciences</journal-title>
    <abbrev-journal-title abbrev-type="publisher">NHESS</abbrev-journal-title><abbrev-journal-title abbrev-type="nlm-ta">Nat. Hazards Earth Syst. Sci.</abbrev-journal-title>
  </journal-title-group><issn pub-type="epub">1684-9981</issn><publisher>
    <publisher-name>Copernicus Publications</publisher-name>
    <publisher-loc>Göttingen, Germany</publisher-loc>
  </publisher></journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.5194/nhess-26-4549-2026</article-id><title-group><article-title>A fluvial flood risk model for quantifying the benefit of mitigation measures under uncertainty</article-title><alt-title>A fluvial flood risk model for quantifying the benefit of mitigation measures under uncertainty</alt-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author" corresp="yes" rid="aff1">
          <name><surname>Ruf</surname><given-names>Mara</given-names></name>
          <email>mara.ruf@tum.de</email>
        </contrib>
        <contrib contrib-type="author" corresp="no" rid="aff1">
          <name><surname>Hoffmann</surname><given-names>Amelie</given-names></name>
          
        </contrib>
        <contrib contrib-type="author" corresp="no" rid="aff1">
          <name><surname>Straub</surname><given-names>Daniel</given-names></name>
          
        <ext-link>https://orcid.org/0000-0001-7819-4261</ext-link></contrib>
        <aff id="aff1"><label>1</label><institution>Engineering Risk Analysis Group, Technical University of Munich, Munich, Germany</institution>
        </aff>
      </contrib-group>
      <author-notes><corresp id="corr1">Mara Ruf (mara.ruf@tum.de)</corresp></author-notes><pub-date><day>23</day><month>September</month><year>2026</year></pub-date>
      
      <volume>26</volume>
      <issue>9</issue>
      <fpage>4549</fpage><lpage>4568</lpage>
      <history>
        <date date-type="received"><day>2</day><month>October</month><year>2025</year></date>
           <date date-type="rev-request"><day>10</day><month>November</month><year>2025</year></date>
           <date date-type="rev-recd"><day>16</day><month>July</month><year>2026</year></date>
           <date date-type="accepted"><day>24</day><month>July</month><year>2026</year></date>
      </history>
      <permissions>
        <copyright-statement>Copyright: © 2026 Mara Ruf et al.</copyright-statement>
        <copyright-year>2026</copyright-year>
      <license license-type="open-access"><license-p>This work is licensed under the Creative Commons Attribution 4.0 International License. To view a copy of this licence, visit <ext-link ext-link-type="uri" xlink:href="https://creativecommons.org/licenses/by/4.0/">https://creativecommons.org/licenses/by/4.0/</ext-link></license-p></license></permissions><self-uri xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026.html">This article is available from https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026.html</self-uri><self-uri xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026.pdf">The full text article is available as a PDF file from https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026.pdf</self-uri>
      <abstract><title>Abstract</title>

      <p id="d2e95">We present a dynamic probabilistic flood risk model that addresses key challenges in the implementation of integrated flood risk management. These include the need for holistic, large-scale risk assessments that adopt a system-based perspective, and a decision-making framework based on benefit-cost analysis. The proposed model allows for the explicit representation and dynamic coupling of the flood process components, including downstream flood wave propagation and possible dike failures, in a computationally efficient and data-sparse manner. This enables the consideration of aleatory and epistemic uncertainties in a 2-level Monte Carlo framework. By separating these uncertainties, the model supports robust risk assessments and facilitates an uncertainty-aware evaluation of the benefit of mitigation measures. The model is applied to the Bavarian Danube, demonstrating its ability to estimate the flood risk-reduction potential of mitigation measures.</p>
  </abstract>
    </article-meta>
  </front>
<body>
      

<sec id="Ch1.S1" sec-type="intro">
  <label>1</label><title>Introduction</title>
      <p id="d2e107">Over the past few decades, the approach to flood management has transitioned from a mainly technical focus on flood protection to a more comprehensive flood risk management strategy <xref ref-type="bibr" rid="bib1.bibx47 bib1.bibx45" id="paren.1"/>. This shift was catalyzed by significant flood events, such as the catastrophic 2002 flood in Central Europe, which traditional flood protection measures failed to prevent. With estimated direct damages of EUR 22.6 billion (reference year 2005; <xref ref-type="bibr" rid="bib1.bibx35" id="altparen.2"/>), the 2002 flood stands as the most expensive natural hazard event recorded in Germany. In response, numerous administrative and legislative initiatives were launched at both the EU and national levels to enhance preparedness for future flooding <xref ref-type="bibr" rid="bib1.bibx44" id="paren.3"/>. However, subsequent flood events in 2013, 2021, and 2024 have highlighted the need for further advancements in the implementation of integrated flood risk management, which can be summarized by three necessary key developments <xref ref-type="bibr" rid="bib1.bibx29" id="paren.4"/>: <list list-type="order"><list-item>
      <p id="d2e124">Comprehensive risk assessment: While traditional engineering approaches relied on predefined design floods and corresponding protection levels <xref ref-type="bibr" rid="bib1.bibx32" id="paren.5"/>, flood risk management encompasses the entire spectrum of potential flood events and their uncertain consequences. It acknowledges the possibility of flood protection failures, even below established design standards, and recognizes that absolute safety against flooding is unattainable. Deterministic models, which assume fixed relationships between return periods, water levels, and flood damage, are increasingly insufficient. Recent studies have highlighted the downstream impacts of dike failures <xref ref-type="bibr" rid="bib1.bibx5 bib1.bibx10" id="paren.6"/>. Consequently, flood risk assessments must explicitly model the flood process chain and dynamically couple its components. Different aleatory uncertainties, arising from natural variability, exist in these components, which are traditionally represented in flood risk models <xref ref-type="bibr" rid="bib1.bibx22" id="paren.7"/>. Alongside these aleatory uncertainties, epistemic uncertainties, i.e., uncertainties resulting from incomplete knowledge and model imperfections inherent in every flood risk model, must be addressed <xref ref-type="bibr" rid="bib1.bibx3" id="paren.8"/>. There is a scientific consensus advocating for probabilistic approaches to enhance robust flood risk assessment and estimate the impact of uncertainties <xref ref-type="bibr" rid="bib1.bibx16 bib1.bibx1 bib1.bibx22 bib1.bibx28" id="paren.9"/>.</p></list-item><list-item>
      <p id="d2e143">Shift in decision-making criteria: Decision-making processes must move from regulation-based frameworks to performance-based approaches, wherein the potential for flood risk reduction is weighted against the costs of mitigation measures <xref ref-type="bibr" rid="bib1.bibx32" id="paren.10"/>. This criterion promotes a more transparent and cost-effective allocation of limited resources <xref ref-type="bibr" rid="bib1.bibx18" id="paren.11"/>. To evaluate the benefits of mitigation measures, flood risk must be estimated both with and without their implementation. Therefore, a model capable of simulating the impacts of mitigation measures – at the site of implementation as well as downstream – is essential. Both aleatory and epistemic uncertainties should be integrated and communicated within benefit-cost analyses <xref ref-type="bibr" rid="bib1.bibx22" id="paren.12"/>. Decision-oriented sensitivity studies <xref ref-type="bibr" rid="bib1.bibx43" id="paren.13"/> can further enhance the decision-making process, ensuring robustness and transparency.</p></list-item><list-item>
      <p id="d2e159">Integrated, cross-border approaches: It is increasingly recognized that isolated, local flood protection strategies must be replaced by integrated approaches that frame flood risk mitigation as a comprehensive task spanning large spatial scales and involving multiple riparian communities <xref ref-type="bibr" rid="bib1.bibx44" id="paren.14"/>. Local flood mitigation efforts can have trans-local consequences <xref ref-type="bibr" rid="bib1.bibx33" id="paren.15"/>. Dikes may temporally and spatially shift flood hazard, potentially exacerbating flood risk downstream. Other flood protection measures, such as detention basins, are designed in a way that their impact propagates far downstream <xref ref-type="bibr" rid="bib1.bibx17" id="paren.16"/>. Ignoring these interdependencies can undermine the optimal allocation of resources and diminish risk reduction potential. Moreover, integrated flood risk management encompasses not only technical solutions but also a diversification of management strategies, including spatial planning, early warning systems, nature-based solutions, and flood-proofing <xref ref-type="bibr" rid="bib1.bibx29" id="paren.17"/>. Despite decades of research advocating for integrated flood risk management, decision-making and its practical implementation often remain fragmented across various professional sectors that focus on local flood protection planning.</p></list-item></list></p>
      <p id="d2e174">These three developments require flood risk models that can represent interactions in flood processes, provide uncertainty-aware risk estimates, and operate at river or catchment scale. In the scientific literature, different models have been presented that meet one or more of these criteria. The first probabilistic national-scale flood risk assessment in England was developed by <xref ref-type="bibr" rid="bib1.bibx23" id="text.18"/>. In this model, dike reliability is represented using fragility functions, which are coupled with a static inundation model to estimate expected annual flood risk across different regions. A basic uncertainty analysis is included to provide upper and lower bounds on the estimated risk. This methodology was further enhanced by <xref ref-type="bibr" rid="bib1.bibx20" id="text.19"/> at a regional scale, where the fragility functions were refined and hydraulic load scenarios  probabilistically generated from extreme value distributions. However, both models lack dynamic coupling between components and, consequently, do not account for downstream discharge reductions following dike failures. Another model developed by <xref ref-type="bibr" rid="bib1.bibx1" id="text.20"/>, applied to the Rhine River in North Rhine-Westphalia, Germany, incorporates hydrological load scenarios derived from a flood frequency curve, Muskingum-based flood routing, levee breach and outflow modeling as well as a static inundation and damage assessment. Dike failure due to overtopping is modeled using a 2D fragility function derived via Monte Carlo simulation of a limit state function under uncertain dike properties. However, breach assessment is limited to only two locations. Subsequent extensions of this model introduced uncertainty analysis <xref ref-type="bibr" rid="bib1.bibx2 bib1.bibx3" id="paren.21"/> and allowed for quasi-continuous dike breach locations <xref ref-type="bibr" rid="bib1.bibx5" id="paren.22"/>. Similarly, the flood risk model developed by <xref ref-type="bibr" rid="bib1.bibx13" id="text.23"/> for the Elbe River in Germany integrates scaled synthetic flood events (based on predefined return periods), a dike breach module, a 1D hydraulic flood routing model, and a macro-scale economic damage assessment. Dike breaches are assumed to occur deterministically as a result of overtopping. While this approach allows for scenario-based risk assessment, it does not include a formal uncertainty analysis. More recently, the Germany-wide flood risk assessment by <xref ref-type="bibr" rid="bib1.bibx39" id="text.24"/> employs a flood event catalog derived from 5000 years of hydro-meteorological simulation data, coupled with a 1D-2D hydrodynamic model to simulate flood propagation and inundation as a consequence of dike overtopping. Dike failure and its consequences are not included, but a comprehensive uncertainty analysis is conducted. The flood hazard model of <xref ref-type="bibr" rid="bib1.bibx4" id="text.25"/> was further refined by <xref ref-type="bibr" rid="bib1.bibx49" id="text.26"/> and extended by the failure mechanisms piping and micro-instability. Moreover, the original flood routing approach was replaced with a 1D hydrodynamic simulation, and the inundation assessment upgraded to a 2D storage-cell-based hydrodynamic model. These enhancements necessitate runtime coupling of the probabilistic model with process-based simulations, increasing the degree of process representation. <xref ref-type="bibr" rid="bib1.bibx16" id="text.27"/> applied this advanced model to a 50 km reach of the Po river in Italy, demonstrating its capability for probabilistic flood hazard mapping under uncertainty.</p>
      <p id="d2e208">This overview of existing large-scale flood models highlights the necessary trade-off among modeling complexity, spatial extent, and comprehensiveness of the uncertainty analysis. In this work, we introduce a probabilistic flood-risk model that seeks an effective balance between these three objectives. The developed model achieves computational efficiency by replacing runtime coupling of computationally expensive hydraulic and hydrodynamic simulations with pre-processed surrogates and lookup tables, while still dynamically coupling flood-process components (Fig. <xref ref-type="fig" rid="F2"/>). This allows the model to represent the key process interactions, without the prohibitive runtime associated with coupled simulation models. Crucially, the model explicitly captures downstream propagation of impacts following dike failures or activation of mitigation measures, such as controlled detention basins (Sect. <xref ref-type="sec" rid="Ch1.S5"/>),  via an efficient flood-routing scheme. The resulting computational efficiency enables embedding the risk model within a two-level Monte Carlo framework. Aleatory and epistemic uncertainties are introduced and propagated separately, thereby enabling a more comprehensive uncertainty and sensitivity analysis than previously feasible at river scales.</p>
      <p id="d2e215">The reduction in modeling fidelity compared with flood risk models coupled with high-resolution hydraulic simulations is, as we argue, acceptable in many decision-making contexts, particularly when uncertainty is explicitly quantified within a consistent framework. It is important to note that the primary contribution of this work is methodological: the objective is to develop and present a novel modeling framework, rather than to provide a definitive flood risk assessment for a specific river reach.</p>
      <p id="d2e219">To demonstrate the applicability of the proposed framework in real-world decision contexts, it is applied to the Bavarian Danube in a case study, where the benefit of a flood mitigation measure and its associated uncertainty is estimated. The successful application in the case study proves that the model can (i) provide large-scale probabilistic risk assessments, (ii) support decision-making through uncertainty-aware quantification of risk reduction, and (iii)  explicitly model interactions between mitigation measures and downstream effects, which provides the basis for joint optimization of mitigation portfolios at river scale.</p>
      <p id="d2e222">The remainder of the paper is organized as follows. Section <xref ref-type="sec" rid="Ch1.S2"/> introduces the exemplary study area, Sect. <xref ref-type="sec" rid="Ch1.S3"/> outlines the components of the flood risk model, Sect. <xref ref-type="sec" rid="Ch1.S4"/> describes the two-level Monte-Carlo framework and Sect. <xref ref-type="sec" rid="Ch1.S5"/> presents results from the application of the model to an exemplary decision-making context. The paper concludes with a discussion and remarks in Sect. <xref ref-type="sec" rid="Ch1.S6"/>.</p>
</sec>
<sec id="Ch1.S2">
  <label>2</label><title>Study area</title>
      <p id="d2e243">The study area utilized in this work to develop, test and demonstrate the application of the flood risk model is the Bavarian part of the Danube River, Germany, shown in Fig. <xref ref-type="fig" rid="F1"/>. The Danube originates in Baden-Württemberg in western Germany, flowing for approximately 380 km through Bavaria before crossing the border into Austria, east of Passau. The river's hydrology is heavily influenced by its tributaries, many of which originate in the Alps, including the Iller, Lech, Isar, and Inn rivers. In addition, the northern catchment area is fed by key tributaries such as the Wörnitz, Altmühl, Naab, and Regen rivers, which arise in the Central German Uplands. Notably, flood dynamics in the northern and southern catchment areas of the Danube differ in terms of underlying formation mechanisms and seasonal patterns, which, in turn, affect flood wave characteristics. This plays an important role in shaping the overall flood hazard associated with the Bavarian Danube. Approximately 54 % of the catchment area is used for agriculture, 34 % is covered by forests, and 13 % is urbanized. Significant industrial centers, including Donauwörth, Ingolstadt, and Regensburg, are located along the river. The cities Regensburg and Ingolstadt are the third and fourth most populous cities in Bavaria.</p>

      <fig id="F1" specific-use="star"><label>Figure 1</label><caption><p id="d2e250">Overview of the study area.</p></caption>
        <graphic xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026-f01.png"/>

      </fig>

      <p id="d2e259">In the case study (Sect. <xref ref-type="sec" rid="Ch1.S5"/>), the risk reduction potential of a controlled detention basin located near Riedensheim (blue area in Fig. <xref ref-type="fig" rid="F1"/>) is evaluated using the developed model. Controlled detention basins are operated by diverting water from the river into the polder area during extreme events, temporarily storing flood volumes and thereby attenuating the flood wave and reducing downstream peak discharges. After the flood peak has passed, the stored water is gradually released back into the river system. The evaluated basin can store a volume of around <inline-formula><mml:math id="M1" display="inline"><mml:mrow><mml:mn mathvariant="normal">8</mml:mn><mml:mo>×</mml:mo><mml:msup><mml:mn mathvariant="normal">10</mml:mn><mml:mn mathvariant="normal">6</mml:mn></mml:msup></mml:mrow></mml:math></inline-formula> m<sup>3</sup> with a maximum intake capacity of 170 m<sup>3</sup> s<sup>−1</sup>. Its operating mode is built into the flood simulation model and follows predefined rules, assuming perfect forecasts. It is activated if a 100-year flood is exceeded at or directly downstream of its location in order to relieve the basic flood protection downstream. For flood events below a 100-year flood, the detention basin is not activated, as the existing basic flood protection is considered sufficient to withstand such events. The exemplary analysis focuses on quantifying the expected reduction in flood risk attributable to the operation of the detention basin, including its associated uncertainty. This benefit can subsequently be weighed against the construction and operation costs of the measure to support economic decision-making.</p>
</sec>
<sec id="Ch1.S3">
  <label>3</label><title>Flood risk model</title>
      <p id="d2e320">The developed flood risk model comprises five primary modules that collectively represent the flood process: the hydrological load module, the dike failure module, the hydrodynamic module, the inundation module, and the damage module. Among these, the dike failure, hydrodynamic, and inundation modules are dynamically coupled to enable updates between them during simulation runs. The flood risk model is summarized in Fig. <xref ref-type="fig" rid="F2"/> and further explained in the following sections. It is integrated within a 2-level Monte Carlo framework, which distinguishes between aleatory and epistemic uncertainty (see Sect. <xref ref-type="sec" rid="Ch1.S4"/>). To optimize computational efficiency, all modules utilize pre-computed runs from various modeling tools, as indicated by the pre-processing box in Fig. <xref ref-type="fig" rid="F2"/>.</p>

      <fig id="F2" specific-use="star"><label>Figure 2</label><caption><p id="d2e331">Schematic overview of the flood risk model. <inline-formula><mml:math id="M5" display="inline"><mml:mi>Q</mml:mi></mml:math></inline-formula>: discharge, <inline-formula><mml:math id="M6" display="inline"><mml:mi>W</mml:mi></mml:math></inline-formula>: water level, <inline-formula><mml:math id="M7" display="inline"><mml:mi>V</mml:mi></mml:math></inline-formula>: volume, <inline-formula><mml:math id="M8" display="inline"><mml:mi>E</mml:mi></mml:math></inline-formula>: elevation, <inline-formula><mml:math id="M9" display="inline"><mml:mi>D</mml:mi></mml:math></inline-formula>: damage.</p></caption>
        <graphic xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026-f02.png"/>

      </fig>

      <p id="d2e375">To apply the flood risk model to a specific case study, several preparatory steps must be undertaken. Although these steps are exemplified for the Bavarian Danube study area, they can be easily adapted to other catchments. First, the river and its surrounding foreland are contained on both sides by a longitudinal embankment line. In areas where river dikes exist, this embankment line coincides with their alignment; in other locations, it follows the outline of the 100-year flood-plain obtained from official flood hazard maps. Second, the river and its longitudinal embankment line are laterally discretized into sections ranging from 300 to 600 m in length, following the recommendations of <xref ref-type="bibr" rid="bib1.bibx11" id="text.28"/>. This choice ensures that the response of dikes segments of this length to hydraulic loading is approximately independent of its adjoining segments <xref ref-type="bibr" rid="bib1.bibx49" id="paren.29"/>. Additionally,  the river reach is longitudinally divided into two parts to model river bifurcations. As a result of this discretization process, a total of <inline-formula><mml:math id="M10" display="inline"><mml:mrow><mml:mn mathvariant="normal">2</mml:mn><mml:mo>×</mml:mo><mml:mn mathvariant="normal">892</mml:mn></mml:mrow></mml:math></inline-formula> river segments are defined along the Bavarian Danube. The adjacent longitudinal structures are termed embankment segments, which are further categorized as either dike or non-dike segments. Similar to <xref ref-type="bibr" rid="bib1.bibx5" id="text.30"/>, dike segments with overlapping hypothetical inundation areas are grouped together into impact zones. Figure <xref ref-type="fig" rid="F3"/> illustrates the spatial structure of the model. The segmentation and zoning enables efficient modeling of the flood process but introduce model inaccuracies, such as the overestimation of water heights when flooding exceeds the extent of the 100-year event, which is quantified in the uncertainty analysis.</p>

      <fig id="F3" specific-use="star"><label>Figure 3</label><caption><p id="d2e404">Schematic spatial discretization structure of the river.</p></caption>
        <graphic xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026-f03.png"/>

      </fig>

<sec id="Ch1.S3.SS1">
  <label>3.1</label><title>Hydrological load module</title>
      <p id="d2e420">Flood hazard can be characterized by a range of representative flood scenarios, each associated with a specific occurrence probability. The derivation of these flood scenarios can be accomplished through various approaches. While early flood risk assessments predominantly relied on historical or design hydrographs, these approaches have mostly been replaced by the synthetic generation of flood waves based on (multi-variate) distributions <xref ref-type="bibr" rid="bib1.bibx10" id="paren.31"/>, climate-based precipitation simulations <xref ref-type="bibr" rid="bib1.bibx39" id="paren.32"/> or synthetic weather generators <xref ref-type="bibr" rid="bib1.bibx31 bib1.bibx21" id="paren.33"/>. Methods that depend on historical observations often face challenges in extrapolation, particularly when predicting flood events and their probabilities beyond the range of observed data. Various extreme value statistics and clustering methods have been employed in the literature to derive synthetic hydrographs based on flood frequency analyses <xref ref-type="bibr" rid="bib1.bibx49" id="paren.34"/>. By contrast, climate-based precipitation simulations and synthetic weather generators are theoretically independent of specific historical flood events and thus offer the greatest potential for representing flood hazard beyond the range of observed records <xref ref-type="bibr" rid="bib1.bibx27" id="paren.35"/>. Simulated flood events often undergo post-processing – such as rescaling or adjustment of occurrence rates – for bias correction based on historical observations; in practice, they are not entirely independent of past events.</p>
      <p id="d2e438">In the current study, a set of flood events is derived from the ClimEx project, which conducted quasi-random climate-based simulations of hydrometeorological events in Bavaria <xref ref-type="bibr" rid="bib1.bibx27" id="paren.36"/>. A total of 50 transient simulations over the time horizon of 1980 to 2099 were carried out, employing the IPCC emission scenario RCP8.5 <xref ref-type="bibr" rid="bib1.bibx24" id="paren.37"/>. From these simulations, 3500 years of precipitation data covering the period from 1980 to 2050 are extracted. Hence, the selected precipitation events reflect the climatic conditions of the recent past, present, and the near future relative to the reference year 2020 of the study. The decision to exclude simulations beyond this period is based on the significant uncertainties associated with future climatic conditions and their potential impact on precipitation patterns. Uncertainty in flood frequency resulting from climate change impact is investigated in the scenario analysis presented in Sect. <xref ref-type="sec" rid="Ch1.S5"/>.</p>
      <p id="d2e449">Following intermediate simulations of runoff generation using WaSim <xref ref-type="bibr" rid="bib1.bibx40" id="paren.38"/> and flood routing within the catchment via Larsim <xref ref-type="bibr" rid="bib1.bibx7" id="paren.39"/>, 72 flood events are identified that exceed a 100-year event on at least one of the gauging stations along the Bavarian Danube. The detention basin evaluated in this study (introduced in Sect. <xref ref-type="sec" rid="Ch1.S2"/>) is designed to be activated only when discharges exceed the threshold of a 100-year event. The measure does not change the risk for events with lower discharges; therefore, these events do not need to be included in the analysis. If mitigation measures operating at lower discharges are to be assessed, the flood event catalog must be extended accordingly. The identified flood events can be interpreted as Monte Carlo samples of flood occurrences for which the evaluated measure provides a benefit, representing the aleatory uncertainty (randomness) associated with the flood event. The occurrence rate of these flood events is estimated as <inline-formula><mml:math id="M11" display="inline"><mml:mrow><mml:mi mathvariant="italic">λ</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">72</mml:mn><mml:mo>/</mml:mo><mml:mn mathvariant="normal">3500</mml:mn></mml:mrow></mml:math></inline-formula> yr<sup>−1</sup>. The 72 flood events are subsequently routed through the Danube River channel using the 1D non-stationary hydraulic modeling tool SOBEK <xref ref-type="bibr" rid="bib1.bibx14" id="paren.40"/>. Each river segment is linked to a hydraulic SOBEK node, ensuring that the flood events are spatially discretized according to the model's resolution. A temporal resolution of 1 h is used in the flood risk model. In case of unbifurcated river channels, the two segments of a river section are linked to the same SOBEK node; in the bifuricated case, different nodes are assigned to the two opposite segments of a river section. For illustration, 19 flood events are depicted in Fig. <xref ref-type="fig" rid="F4"/> at four exemplary segments along the Bavarian Danube.</p>

      <fig id="F4" specific-use="star"><label>Figure 4</label><caption><p id="d2e497">Hydrograph of 19 exemplary flood events at four locations along the Bavarian Danube. Segment number of location in brackets. One randomly chosen flood event is shown in blue.</p></caption>
          <graphic xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026-f04.png"/>

        </fig>

      <p id="d2e506">In addition to discharges <inline-formula><mml:math id="M13" display="inline"><mml:mi>Q</mml:mi></mml:math></inline-formula> along the river network, the hydraulic simulations provide corresponding water levels <inline-formula><mml:math id="M14" display="inline"><mml:mi>W</mml:mi></mml:math></inline-formula>. For each river segment, an empirical stage–discharge relationship is derived by binning simulated <inline-formula><mml:math id="M15" display="inline"><mml:mi>Q</mml:mi></mml:math></inline-formula>–<inline-formula><mml:math id="M16" display="inline"><mml:mi>W</mml:mi></mml:math></inline-formula> pairs from all flood events based on discharge values. Within each bin, mean discharge and water level values are calculated to construct a discretized stage-discharge curve. In the flood simulation model, water levels are then estimated via piecewise linear interpolation between these values. While computationally efficient, this method assumes a single-valued <inline-formula><mml:math id="M17" display="inline"><mml:mi>Q</mml:mi></mml:math></inline-formula>–<inline-formula><mml:math id="M18" display="inline"><mml:mi>W</mml:mi></mml:math></inline-formula> relationship and therefore does not capture hysteresis effects, which is quantified in the uncertainty analysis.</p>
</sec>
<sec id="Ch1.S3.SS2">
  <label>3.2</label><title>Dike failure module</title>
      <p id="d2e560">Dikes are most likely to fail when water levels significantly exceed design specifications. In this study, failure refers to the physical breach or collapse of the dike, while overtopping denotes the overflow of water across the dike crest without implying structural damage. Failure resulting from overtopping is implicitly accounted for through the fragility function, as outlined below. Dike failures can result in catastrophic damage, especially when affecting densely populated areas, a phenomenon often referred to as the ”levee effect”. Studies have extensively investigated the relationship between dike breaches and flood damage, underscoring the importance of understanding dike reliability <xref ref-type="bibr" rid="bib1.bibx48 bib1.bibx9 bib1.bibx20" id="paren.41"/>. The reliability of dike systems can be assessed through three primary approaches: empirical analyses, expert judgment, and model-based probabilistic analyses <xref ref-type="bibr" rid="bib1.bibx41" id="paren.42"/>. First efforts to systematically quantify the probability of dike failure using fragility functions were made by the U.S. Army Corps of Engineers in the early 1990s <xref ref-type="bibr" rid="bib1.bibx46" id="paren.43"/>. Since then, considerable research has been conducted, and model-based probabilistic approaches have gained significant traction in the field. Dike failure modes can be categorized into three primary types: hydraulic, geohydraulic, and global static failure <xref ref-type="bibr" rid="bib1.bibx48" id="paren.44"/>. Hydraulic failure occurs when overtopping water erodes the dike material from the landward side. If wave-induced overtopping is neglected – an assumption adopted by <xref ref-type="bibr" rid="bib1.bibx48" id="text.45"/>, <xref ref-type="bibr" rid="bib1.bibx1" id="text.46"/>, and <xref ref-type="bibr" rid="bib1.bibx16" id="text.47"/> – the probability of hydraulic failure is zero for water levels below the dike crest height. Geohydraulic failure arises from an uplift of the dike core, typically resulting from piping processes occurring in the dike foundation. In contrast, global static failure is induced by microinstability within the dike core due to internal seepage processes. A comprehensive study of the analytical description of dike failure modes was conducted by <xref ref-type="bibr" rid="bib1.bibx48" id="text.48"/>.</p>
      <p id="d2e588"><xref ref-type="bibr" rid="bib1.bibx48" id="text.49"/> describes the physical processes leading to failure through the use of limit state functions, which typically compare the stress <inline-formula><mml:math id="M19" display="inline"><mml:mi>S</mml:mi></mml:math></inline-formula> acting on a structure with its resistance <inline-formula><mml:math id="M20" display="inline"><mml:mi>R</mml:mi></mml:math></inline-formula>: <inline-formula><mml:math id="M21" display="inline"><mml:mrow><mml:mi>g</mml:mi><mml:mo>(</mml:mo><mml:mi>R</mml:mi><mml:mo>,</mml:mo><mml:mi>S</mml:mi><mml:mo>)</mml:mo><mml:mo>=</mml:mo><mml:mi>R</mml:mi><mml:mo>-</mml:mo><mml:mi>S</mml:mi></mml:mrow></mml:math></inline-formula>. Failure occurs if  <inline-formula><mml:math id="M22" display="inline"><mml:mrow><mml:mi>g</mml:mi><mml:mo>(</mml:mo><mml:mi>R</mml:mi><mml:mo>,</mml:mo><mml:mi>S</mml:mi><mml:mo>)</mml:mo><mml:mo>≤</mml:mo><mml:mn mathvariant="normal">0</mml:mn></mml:mrow></mml:math></inline-formula>, i.e., when <inline-formula><mml:math id="M23" display="inline"><mml:mi>S</mml:mi></mml:math></inline-formula> exceeds <inline-formula><mml:math id="M24" display="inline"><mml:mi>R</mml:mi></mml:math></inline-formula>. Both <inline-formula><mml:math id="M25" display="inline"><mml:mi>R</mml:mi></mml:math></inline-formula> and <inline-formula><mml:math id="M26" display="inline"><mml:mi>S</mml:mi></mml:math></inline-formula> are treated as uncertain and are characterized by a range of random variables corresponding to different dike properties. For the three distinct failure modes, different (conditional) sub-mechanisms are incorporated into the limit state function. In this work, the limit state functions for the (sub-)mechanisms contributing to <inline-formula><mml:math id="M27" display="inline"><mml:mrow><mml:mi>g</mml:mi><mml:mo>(</mml:mo><mml:mi>R</mml:mi><mml:mo>,</mml:mo><mml:mi>S</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> are derived from the work of <xref ref-type="bibr" rid="bib1.bibx48" id="text.50"/> and evaluated using a Monte Carlo simulation to generate fragility functions. For all random variables entering <inline-formula><mml:math id="M28" display="inline"><mml:mrow><mml:mi>g</mml:mi><mml:mo>(</mml:mo><mml:mi>R</mml:mi><mml:mo>,</mml:mo><mml:mi>S</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> for which no site-specific data was available, probability distributions are based on <xref ref-type="bibr" rid="bib1.bibx48" id="text.51"/>. The resulting conditional failure probabilities are in function of various load variables, such as water level relative to crest height, overtopping duration, and impoundment duration. To reduce computational complexity and streamline the model, these variables are not directly evaluated in the flood simulation model. Instead, the fragility functions are evaluated in a pre-processing step at each dike segment independently, utilizing the flood events outlined in the hydrological load module in Sect. <xref ref-type="sec" rid="Ch1.S3.SS1"/>. By calculating the expected value of the failure probability conditional on the maximum water level relative to the crest height <inline-formula><mml:math id="M29" display="inline"><mml:mrow><mml:msub><mml:mi>h</mml:mi><mml:mi>k</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> of each dike segment, a fragility function is obtained that is conditional solely on the relative water level. This function incorporates all three failure mechanisms and implicitly contains information regarding the characteristics of the underlying flood scenarios. Hence the fragility function is specific for the considered study area and flood events. It is presented in Fig. <xref ref-type="fig" rid="F5"/> and applied to all dike segments. Uncertainty bounds are derived and used to define the lower and upper limits of the beta distribution employed in the uncertainty analysis (Sect. <xref ref-type="sec" rid="Ch1.S5"/>). If more detailed information regarding the dike characteristic is available, this generic fragility function can be updated.</p>

      <fig id="F5"><label>Figure 5</label><caption><p id="d2e746">Developed fragility function <inline-formula><mml:math id="M30" display="inline"><mml:mrow><mml:msub><mml:mi>P</mml:mi><mml:mi mathvariant="normal">F</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:mi>w</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> and its uncertainty bounds for single dike segments. This function is specific to the case study.</p></caption>
          <graphic xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026-f05.png"/>

        </fig>

      <p id="d2e773">In the flood simulation model, the fragility function is applied to every dike segment. In each Monte Carlo sample run, a breach resistance value <inline-formula><mml:math id="M31" display="inline"><mml:mi>r</mml:mi></mml:math></inline-formula>  – defined as the maximum water level the segment can withstand before failure – is sampled by inverse transform sampling using the fragility function. Specifically, a uniform random variable <inline-formula><mml:math id="M32" display="inline"><mml:mrow><mml:mi>U</mml:mi><mml:mo>∼</mml:mo><mml:mi mathvariant="script">U</mml:mi><mml:mo>(</mml:mo><mml:mn mathvariant="normal">0</mml:mn><mml:mo>,</mml:mo><mml:mn mathvariant="normal">1</mml:mn><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> is drawn and mapped to a water level <inline-formula><mml:math id="M33" display="inline"><mml:mrow><mml:msup><mml:mi>w</mml:mi><mml:mo>∗</mml:mo></mml:msup></mml:mrow></mml:math></inline-formula> via the inverse fragility function, <inline-formula><mml:math id="M34" display="inline"><mml:mrow><mml:mi>r</mml:mi><mml:mo>=</mml:mo><mml:msup><mml:mi>w</mml:mi><mml:mo>∗</mml:mo></mml:msup><mml:mo>=</mml:mo><mml:msubsup><mml:mi>P</mml:mi><mml:mi mathvariant="normal">F</mml:mi><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msubsup><mml:mo>(</mml:mo><mml:mi>U</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula>. The resistances of dike segments are considered independent of one another, justified by the rationale for the choice of segment length outlined in Sect. <xref ref-type="sec" rid="Ch1.S3"/>. Dike failure is defined to occur when the water level, at any time during the flood event, exceeds the breach resistance <inline-formula><mml:math id="M35" display="inline"><mml:mi>r</mml:mi></mml:math></inline-formula>. In case of breaching, the breach width <inline-formula><mml:math id="M36" display="inline"><mml:mi>b</mml:mi></mml:math></inline-formula> is quasi-randomly sampled from a lognormal distribution with parameters <inline-formula><mml:math id="M37" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">μ</mml:mi><mml:mi>b</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">58.5</mml:mn></mml:mrow></mml:math></inline-formula> m and <inline-formula><mml:math id="M38" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">σ</mml:mi><mml:mi>b</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">61.3</mml:mn></mml:mrow></mml:math></inline-formula> m, following <xref ref-type="bibr" rid="bib1.bibx48" id="text.52"/>. If the sampled breach width falls outside the range <inline-formula><mml:math id="M39" display="inline"><mml:mrow><mml:mo>[</mml:mo><mml:mn mathvariant="normal">3</mml:mn><mml:mspace linebreak="nobreak" width="0.125em"/><mml:mi mathvariant="normal">m</mml:mi><mml:mo>,</mml:mo><mml:msub><mml:mi>b</mml:mi><mml:mi mathvariant="normal">s</mml:mi></mml:msub><mml:mo>]</mml:mo></mml:mrow></mml:math></inline-formula>, with <inline-formula><mml:math id="M40" display="inline"><mml:mrow><mml:msub><mml:mi>b</mml:mi><mml:mi mathvariant="normal">s</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> equal to the segment width, it is truncated to conform to these limits. Thus, both breach resistance and breach width – and therefore the aleatory uncertainties inherent in the breaching process – are accounted for by the first-level Monte Carlo simulation. The breach development rate is assumed to be 1 h, consistent with the methodology employed by <xref ref-type="bibr" rid="bib1.bibx1 bib1.bibx2" id="text.53"/> and <xref ref-type="bibr" rid="bib1.bibx48" id="text.54"/>. The breach is assumed to erode the entire dike down to the toe level of the dike, <inline-formula><mml:math id="M41" display="inline"><mml:mrow><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">t</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>.</p>
</sec>
<sec id="Ch1.S3.SS3">
  <label>3.3</label><title>Inundation module</title>
      <p id="d2e959">The hourly outflow discharge through the dike breach (or overflow over the crest in the absence of failure) into the hinterland at time step <inline-formula><mml:math id="M42" display="inline"><mml:mi>t</mml:mi></mml:math></inline-formula> is calculated using a modified broad-crested weir equation:

            <disp-formula id="Ch1.E1" content-type="numbered"><label>1</label><mml:math id="M43" display="block"><mml:mrow><mml:msub><mml:mi>Q</mml:mi><mml:mi mathvariant="normal">out</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mo>=</mml:mo><mml:mn mathvariant="normal">2</mml:mn><mml:mo>/</mml:mo><mml:mn mathvariant="normal">3</mml:mn><mml:mo>⋅</mml:mo><mml:msub><mml:mi mathvariant="italic">μ</mml:mi><mml:mn mathvariant="normal">0</mml:mn></mml:msub><mml:mo>⋅</mml:mo><mml:msup><mml:mi mathvariant="italic">μ</mml:mi><mml:mo>∗</mml:mo></mml:msup><mml:mo>⋅</mml:mo><mml:msqrt><mml:mrow><mml:mn mathvariant="normal">2</mml:mn><mml:mi>g</mml:mi></mml:mrow></mml:msqrt><mml:mo>⋅</mml:mo><mml:mi>b</mml:mi><mml:mo>⋅</mml:mo><mml:msup><mml:mi>h</mml:mi><mml:mrow><mml:mn mathvariant="normal">3</mml:mn><mml:mo>/</mml:mo><mml:mn mathvariant="normal">2</mml:mn></mml:mrow></mml:msup><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:math></disp-formula>

          where <inline-formula><mml:math id="M44" display="inline"><mml:mi>g</mml:mi></mml:math></inline-formula> [m s<sup>−2</sup>] is the gravitational force, <inline-formula><mml:math id="M46" display="inline"><mml:mi>h</mml:mi></mml:math></inline-formula> [m] the overfall height, <inline-formula><mml:math id="M47" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">μ</mml:mi><mml:mn mathvariant="normal">0</mml:mn></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0.577</mml:mn></mml:mrow></mml:math></inline-formula> [–] the flow factor and <inline-formula><mml:math id="M48" display="inline"><mml:mrow><mml:msup><mml:mi mathvariant="italic">μ</mml:mi><mml:mo>∗</mml:mo></mml:msup><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0.7</mml:mn></mml:mrow></mml:math></inline-formula> [–] a discharge reduction factor to account for the influence of the dike breach,  motivated by the studies of <xref ref-type="bibr" rid="bib1.bibx25" id="text.55"/>. The overfall height is

            <disp-formula id="Ch1.E2" content-type="numbered"><label>2</label><mml:math id="M49" display="block"><mml:mrow><mml:mi>h</mml:mi><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mo>=</mml:mo><mml:mfenced open="{" close=""><mml:mtable class="array" columnalign="left left"><mml:mtr><mml:mtd><mml:mrow><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">t</mml:mi></mml:msub><mml:mo>+</mml:mo><mml:mi>w</mml:mi><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:mtd><mml:mtd><mml:mrow><mml:mi mathvariant="normal">for</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">breaching</mml:mi></mml:mrow></mml:mtd></mml:mtr><mml:mtr><mml:mtd><mml:mrow><mml:mi>w</mml:mi><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mo>-</mml:mo><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">c</mml:mi></mml:msub></mml:mrow></mml:mtd><mml:mtd><mml:mrow><mml:mi mathvariant="normal">for</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">overtopping</mml:mi></mml:mrow></mml:mtd></mml:mtr></mml:mtable></mml:mfenced></mml:mrow></mml:math></disp-formula>

          with <inline-formula><mml:math id="M50" display="inline"><mml:mrow><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">t</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> and <inline-formula><mml:math id="M51" display="inline"><mml:mrow><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">c</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> the height of the dike toe and dike crest respectively, and <inline-formula><mml:math id="M52" display="inline"><mml:mrow><mml:mi>w</mml:mi><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> the water level in the river segment. Discharge over the dike crest or through the dike breach is constrained. For each river segment, a limit discharge remaining in the river channel <inline-formula><mml:math id="M53" display="inline"><mml:mrow><mml:msub><mml:mi>Q</mml:mi><mml:mi mathvariant="normal">l</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> at both dike crest height and dike toe height is estimated in a pre-processing step based on the <inline-formula><mml:math id="M54" display="inline"><mml:mi>Q</mml:mi></mml:math></inline-formula>–<inline-formula><mml:math id="M55" display="inline"><mml:mi>W</mml:mi></mml:math></inline-formula> relationship obtained from the hydraulic simulation discussed in Sect. <xref ref-type="sec" rid="Ch1.S3.SS1"/>. With <inline-formula><mml:math id="M56" display="inline"><mml:mrow><mml:msub><mml:mi>Q</mml:mi><mml:mi mathvariant="normal">out</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mo>=</mml:mo><mml:mo>min⁡</mml:mo><mml:mo mathvariant="italic">{</mml:mo><mml:msub><mml:mi>Q</mml:mi><mml:mi mathvariant="normal">out</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mo>,</mml:mo><mml:msub><mml:mi>Q</mml:mi><mml:mi mathvariant="normal">river</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mo>-</mml:mo><mml:msub><mml:mi>Q</mml:mi><mml:mi mathvariant="normal">l</mml:mi></mml:msub><mml:mo mathvariant="italic">}</mml:mo></mml:mrow></mml:math></inline-formula>, it is ensured that the outflow does not exceed physically plausible limits, neglecting wave influence. Additionally, <inline-formula><mml:math id="M57" display="inline"><mml:mrow><mml:mi>w</mml:mi><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> in the river segment is compared to the inundation elevation in the hinterland <inline-formula><mml:math id="M58" display="inline"><mml:mrow><mml:msub><mml:mi>E</mml:mi><mml:mi mathvariant="normal">in</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> at the respective time step. Consequently, the model  automatically switches between free and drowned overfall, depending on the water levels in the river and the hinterland. The outflow volume <inline-formula><mml:math id="M59" display="inline"><mml:mrow><mml:mi>V</mml:mi><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> is approximated as the sum of the outflow discharges <inline-formula><mml:math id="M60" display="inline"><mml:mrow><mml:mi>V</mml:mi><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mo>=</mml:mo><mml:msubsup><mml:mo>∑</mml:mo><mml:mrow><mml:msup><mml:mi>t</mml:mi><mml:mo>′</mml:mo></mml:msup><mml:mo>=</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow><mml:mrow><mml:mi>t</mml:mi><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msubsup><mml:msub><mml:mi>Q</mml:mi><mml:mi mathvariant="normal">out</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:msup><mml:mi>t</mml:mi><mml:mo>′</mml:mo></mml:msup><mml:mo>)</mml:mo><mml:mo>⋅</mml:mo><mml:mn mathvariant="normal">3600</mml:mn></mml:mrow></mml:math></inline-formula> s. Backwater discharges are not modeled directly; rather, the outflow volume is constrained by a segment-specific maximum volume <inline-formula><mml:math id="M61" display="inline"><mml:mrow><mml:msub><mml:mi>V</mml:mi><mml:mo>max⁡</mml:mo></mml:msub></mml:mrow></mml:math></inline-formula> determined by the topography and the surrounding dike heights, which is further outlined below.</p>
      <p id="d2e1400">Inundation modeling aims at estimating the extent of flooding given the topography and the boundary conditions of the breach and can be conducted with varying degrees of detail. The choice depends on the available computational and data resources, the objectives and scale of the study area, as well as the level of detail of other components of the flood risk model. In their national-scale flood risk assessment, <xref ref-type="bibr" rid="bib1.bibx23" id="text.56"/> estimated flood extent using a simple approximation method, spreading the calculated flood volume while assuming an average flood depth and a semi-circular or trapezoidal outline shape. <xref ref-type="bibr" rid="bib1.bibx13" id="text.57"/> utilized pre-computed volume-storage functions based on a 100 <inline-formula><mml:math id="M62" display="inline"><mml:mo>×</mml:mo></mml:math></inline-formula> 100 m grid to determine inundation depths. For their study at the Rhine River in Germany, <xref ref-type="bibr" rid="bib1.bibx1 bib1.bibx2" id="text.58"/> derived so-called damage functions prior to the Monte Carlo simulation, assuming a horizontal filling of the hinterland in 0.5 m increments. This approach involved intersecting a horizontal plane with the digital elevation model (DEM). <xref ref-type="bibr" rid="bib1.bibx49" id="text.59"/> simulated the inundation process at run time using a 2D raster-based diffusive wave model that solves the continuity and momentum equations. This study employed a DEM with a 50 <inline-formula><mml:math id="M63" display="inline"><mml:mo>×</mml:mo></mml:math></inline-formula> 50 m grid cell resolution and average, land-use-specific roughness values based on literature data. A similar approach was pursued in the Italian flood hazard study conducted by <xref ref-type="bibr" rid="bib1.bibx16" id="text.60"/> at the Po River.</p>
      <p id="d2e1433">In this work, the relationship between inundation elevation (<inline-formula><mml:math id="M64" display="inline"><mml:mi>E</mml:mi></mml:math></inline-formula>) and inundation volume (<inline-formula><mml:math id="M65" display="inline"><mml:mi>V</mml:mi></mml:math></inline-formula>) is derived statically for each dike segment using ArcGIS. The inundation volumes are derived from the intersections between a <inline-formula><mml:math id="M66" display="inline"><mml:mrow><mml:mn mathvariant="normal">5</mml:mn><mml:mo>×</mml:mo><mml:mn mathvariant="normal">5</mml:mn></mml:mrow></mml:math></inline-formula> m DEM and horizontal surfaces, representing the water level, at 0.1 m height increments. As a constraint, the algorithm assesses the connectivity of the resulting volumes with their corresponding dike segments, systematically removing any disconnected pools. Additionally, inundation areas are cut along tributaries. Five resulting inundation areas at breach segment 500 are depicted in Fig. <xref ref-type="fig" rid="F6"/>. As a result, <inline-formula><mml:math id="M67" display="inline"><mml:mi>V</mml:mi></mml:math></inline-formula>–<inline-formula><mml:math id="M68" display="inline"><mml:mi>E</mml:mi></mml:math></inline-formula> tables and hypothetical inundation areas are created for each segment. Furthermore, segments with overlapping hypothetical inundation areas at reasonably high inundation elevations are grouped together into impact zones. To account for backwater effects, the maximum outflow volume for each dike segment <inline-formula><mml:math id="M69" display="inline"><mml:mrow><mml:msub><mml:mi>V</mml:mi><mml:mo>max⁡</mml:mo></mml:msub></mml:mrow></mml:math></inline-formula> is derived based on a simple approximation. This is achieved by considering the terrain slope in the direction of river flow, the height of the downstream protective structures within the same impact zone, and the derived <inline-formula><mml:math id="M70" display="inline"><mml:mi>V</mml:mi></mml:math></inline-formula>–<inline-formula><mml:math id="M71" display="inline"><mml:mi>E</mml:mi></mml:math></inline-formula> relationship. Additionally, in case of several breaches in a single impact zone, it is assumed that water flows together and forms one inundation area. Hence, the sum of the individual outflow volumes is used for inundation elevation and damage estimation. Elevation and damage (<inline-formula><mml:math id="M72" display="inline"><mml:mi>D</mml:mi></mml:math></inline-formula>) estimations are conducted based on the <inline-formula><mml:math id="M73" display="inline"><mml:mi>V</mml:mi></mml:math></inline-formula>–<inline-formula><mml:math id="M74" display="inline"><mml:mi>E</mml:mi></mml:math></inline-formula> and <inline-formula><mml:math id="M75" display="inline"><mml:mi>V</mml:mi></mml:math></inline-formula>–<inline-formula><mml:math id="M76" display="inline"><mml:mi>D</mml:mi></mml:math></inline-formula> (see Sect. <xref ref-type="sec" rid="Ch1.S3.SS5"/>) relationships of all involved segments using the total volume. The lowest resulting elevation and the highest damage estimate are chosen as decisive. Exemplarily, the resulting relationship between volume <inline-formula><mml:math id="M77" display="inline"><mml:mi>V</mml:mi></mml:math></inline-formula> and elevation <inline-formula><mml:math id="M78" display="inline"><mml:mi>E</mml:mi></mml:math></inline-formula> for segment 500 downstream of Regensburg is depicted in Fig. <xref ref-type="fig" rid="F9"/>. In analogy to the dike segments, inundation areas are derived for all river sections. As a constraint in the GIS-based derivation of inundation areas for river sections, the algorithm assesses the connectivity of the inundation surfaces with the river network.</p>

      <fig id="F6"><label>Figure 6</label><caption><p id="d2e1562">Five exemplary inundation areas at breach segment 500 derived with static GIS approach. Inundation elevations are: 328, 329, 330, 331 and 331.8 m.</p></caption>
          <graphic xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026-f06.png"/>

        </fig>

      <p id="d2e1571">The simplified static approach offers the advantage that, in case of breaching or overtopping, no process-based simulation of the flood wave in the hinterland is needed. Instead, a computationally inexpensive interpolation is conducted for each time step of outflow discharge. This approach neglects flood hydraulics, e.g. the influence of terrain roughness, flow velocity, flow direction, and settlement structures on the propagation of the flood wave. The impact of these simplifications varies depending on the existing topography, as studied by <xref ref-type="bibr" rid="bib1.bibx4" id="text.61"/>. They concluded that for low dynamic river floods, the consequences of the inaccuracies resulting from static inundation modeling are small compared to those resulting from large-scale damage assessments. Given the comparably flat topography of the Bavarian Danube, floods are mainly low dynamic, which allows this simplified approach.</p>
</sec>
<sec id="Ch1.S3.SS4">
  <label>3.4</label><title>Hydrodynamic module</title>
      <p id="d2e1585">The influence of dike breaches on downstream flood hazard has been emphasized in several studies over the past two decades, e.g., <xref ref-type="bibr" rid="bib1.bibx48" id="text.62"/>, <xref ref-type="bibr" rid="bib1.bibx9" id="text.63"/>, and <xref ref-type="bibr" rid="bib1.bibx5" id="text.64"/>. If not properly incorporated, the downstream flood hazard can be significantly overestimated. At the same time, flood protection measures, such as detention basins, are designed in a way that they take effect until far downstream <xref ref-type="bibr" rid="bib1.bibx17" id="paren.65"/>. To model the influence of mitigation measures and possible protection failures on downstream flood hydrographs, different flood routing techniques can be incorporated into flood risk models in varying degrees of detail. <xref ref-type="bibr" rid="bib1.bibx13" id="text.66"/> employ an empirical quick routing model that multiplies the discharges by a dimensionless system function. This system function depends on the length of the river segment, as well as translation and diffusion coefficients. <xref ref-type="bibr" rid="bib1.bibx1" id="text.67"/> apply the Muskingum method for flood routing, estimating travel time and form parameters based on 1D hydraulic simulations. <xref ref-type="bibr" rid="bib1.bibx49" id="text.68"/> utilize an unsteady 1D hydrodynamic model based on the Saint-Venant equations and cross-sectional profiles for river flood routing.</p>
      <p id="d2e1610">In this work, a vector-based flood routing approach is developed, which is composed of a translational and attenuation vector. It efficiently updates temporally and spatially discretized discharges downstream of a failed dike or an activated detention basin. The derivation of translational and attenuation vector is calibrated using the hydraulic modeling outcomes of the 1D simulation, conducted in the scope of Sect. <xref ref-type="sec" rid="Ch1.S3.SS1"/>. The translational vector is defined as <inline-formula><mml:math id="M79" display="inline"><mml:mrow><mml:mi mathvariant="bold-italic">T</mml:mi><mml:mo>=</mml:mo><mml:mo>(</mml:mo><mml:msub><mml:mi>T</mml:mi><mml:mn mathvariant="normal">1</mml:mn></mml:msub><mml:mo>,</mml:mo><mml:msub><mml:mi>T</mml:mi><mml:mn mathvariant="normal">2</mml:mn></mml:msub><mml:mo>,</mml:mo><mml:mi mathvariant="normal">…</mml:mi><mml:mo>,</mml:mo><mml:msub><mml:mi>T</mml:mi><mml:mi>n</mml:mi></mml:msub><mml:mo>)</mml:mo><mml:mo>∈</mml:mo><mml:msubsup><mml:mi mathvariant="double-struck">N</mml:mi><mml:mn mathvariant="normal">0</mml:mn><mml:mrow><mml:mn mathvariant="normal">1</mml:mn><mml:mo>×</mml:mo><mml:mi>n</mml:mi></mml:mrow></mml:msubsup></mml:mrow></mml:math></inline-formula>, where <inline-formula><mml:math id="M80" display="inline"><mml:mrow><mml:mi>n</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">892</mml:mn></mml:mrow></mml:math></inline-formula> is the total number of river segments.  Each entry <inline-formula><mml:math id="M81" display="inline"><mml:mrow><mml:msub><mml:mi>T</mml:mi><mml:mi>i</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> represents the mean travel time from the reference section <inline-formula><mml:math id="M82" display="inline"><mml:mn mathvariant="normal">1</mml:mn></mml:math></inline-formula> to segment <inline-formula><mml:math id="M83" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula>. <inline-formula><mml:math id="M84" display="inline"><mml:mi mathvariant="bold-italic">T</mml:mi></mml:math></inline-formula> is derived from a set of <inline-formula><mml:math id="M85" display="inline"><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">sim</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">18</mml:mn></mml:mrow></mml:math></inline-formula> hydraulic simulations, where artificial discharge reductions are applied to the flood hydrographs at the most upstream segment, resulting in <inline-formula><mml:math id="M86" display="inline"><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">sim</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> discharge matrices <inline-formula><mml:math id="M87" display="inline"><mml:mrow><mml:msubsup><mml:mi mathvariant="bold">Q</mml:mi><mml:mi mathvariant="normal">red</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>∈</mml:mo><mml:msup><mml:mi mathvariant="double-struck">R</mml:mi><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi>t</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:mi>n</mml:mi></mml:mrow></mml:msup></mml:mrow></mml:math></inline-formula>. <inline-formula><mml:math id="M88" display="inline"><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi>t</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> is the number of time steps in a flood event <inline-formula><mml:math id="M89" display="inline"><mml:mi>k</mml:mi></mml:math></inline-formula>. For each flood event <inline-formula><mml:math id="M90" display="inline"><mml:mi>k</mml:mi></mml:math></inline-formula>, the discharge reduction <inline-formula><mml:math id="M91" display="inline"><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:msub><mml:mi mathvariant="bold-italic">Q</mml:mi><mml:mi>i</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> at segment <inline-formula><mml:math id="M92" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula> is defined as:

            <disp-formula id="Ch1.E3" content-type="numbered"><label>3</label><mml:math id="M93" display="block"><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:msubsup><mml:mi mathvariant="bold-italic">Q</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>=</mml:mo><mml:msubsup><mml:mi mathvariant="bold-italic">Q</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>-</mml:mo><mml:msubsup><mml:mi mathvariant="bold-italic">Q</mml:mi><mml:mrow><mml:mi mathvariant="normal">red</mml:mi><mml:mo>,</mml:mo><mml:mi>i</mml:mi></mml:mrow><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>,</mml:mo></mml:mrow></mml:math></disp-formula>

          where <inline-formula><mml:math id="M94" display="inline"><mml:mrow><mml:msubsup><mml:mi mathvariant="bold">Q</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>∈</mml:mo><mml:msup><mml:mi mathvariant="double-struck">R</mml:mi><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi>t</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:mrow></mml:math></inline-formula> is the original discharge matrix of event <inline-formula><mml:math id="M95" display="inline"><mml:mi>k</mml:mi></mml:math></inline-formula> at segment <inline-formula><mml:math id="M96" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula>. The time of maximum discharge reduction <inline-formula><mml:math id="M97" display="inline"><mml:mrow><mml:msubsup><mml:mi>t</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup></mml:mrow></mml:math></inline-formula> is extracted for each segment <inline-formula><mml:math id="M98" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula>:

            <disp-formula id="Ch1.E4" content-type="numbered"><label>4</label><mml:math id="M99" display="block"><mml:mrow><mml:msubsup><mml:mi>t</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>=</mml:mo><mml:mi>arg⁡</mml:mi><mml:munder><mml:mo movablelimits="false">max⁡</mml:mo><mml:mi>t</mml:mi></mml:munder><mml:mfenced open="{" close="}"><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:msubsup><mml:mi>Q</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:mfenced></mml:mrow></mml:math></disp-formula>

          A sliding-window median filter is applied to <inline-formula><mml:math id="M100" display="inline"><mml:mrow><mml:mo mathvariant="italic">{</mml:mo><mml:msup><mml:mi mathvariant="bold-italic">t</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msup><mml:mo mathvariant="italic">}</mml:mo></mml:mrow></mml:math></inline-formula> for all simulations <inline-formula><mml:math id="M101" display="inline"><mml:mi>k</mml:mi></mml:math></inline-formula>, resulting in <inline-formula><mml:math id="M102" display="inline"><mml:mrow><mml:msup><mml:mover accent="true"><mml:mi mathvariant="bold-italic">t</mml:mi><mml:mo mathvariant="normal" stretchy="false">̃</mml:mo></mml:mover><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msup></mml:mrow></mml:math></inline-formula>. The final translational vector entries <inline-formula><mml:math id="M103" display="inline"><mml:mrow><mml:msub><mml:mi>T</mml:mi><mml:mi>i</mml:mi></mml:msub><mml:mo>∈</mml:mo><mml:mi mathvariant="bold-italic">T</mml:mi></mml:mrow></mml:math></inline-formula> are computed as the mean of the median-smoothed values over all flood scenarios:

            <disp-formula id="Ch1.E5" content-type="numbered"><label>5</label><mml:math id="M104" display="block"><mml:mrow><mml:msub><mml:mi>T</mml:mi><mml:mi>i</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mstyle displaystyle="true"><mml:mfrac style="display"><mml:mn mathvariant="normal">1</mml:mn><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">sim</mml:mi></mml:msub></mml:mrow></mml:mfrac></mml:mstyle><mml:munderover><mml:mo movablelimits="false">∑</mml:mo><mml:mrow><mml:mi>k</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">sim</mml:mi></mml:msub></mml:mrow></mml:munderover><mml:msubsup><mml:mover accent="true"><mml:mi>t</mml:mi><mml:mo mathvariant="normal" stretchy="false">̃</mml:mo></mml:mover><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup></mml:mrow></mml:math></disp-formula></p>
      <p id="d2e2109">In the flood simulation module, the relative travel time between a breach segment <inline-formula><mml:math id="M105" display="inline"><mml:mi>b</mml:mi></mml:math></inline-formula> and a downstream segment <inline-formula><mml:math id="M106" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula> is then computed as

            <disp-formula id="Ch1.E6" content-type="numbered"><label>6</label><mml:math id="M107" display="block"><mml:mrow><mml:msubsup><mml:mi>T</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">rel</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>=</mml:mo><mml:msub><mml:mi>T</mml:mi><mml:mi>i</mml:mi></mml:msub><mml:mo>-</mml:mo><mml:msub><mml:mi>T</mml:mi><mml:mi>b</mml:mi></mml:msub></mml:mrow></mml:math></disp-formula>

          Given a computed discharge reduction <inline-formula><mml:math id="M108" display="inline"><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:msub><mml:mover accent="true"><mml:mi mathvariant="bold-italic">Q</mml:mi><mml:mo stretchy="false" mathvariant="normal">^</mml:mo></mml:mover><mml:mi>b</mml:mi></mml:msub><mml:mo>∈</mml:mo><mml:msup><mml:mi mathvariant="double-struck">R</mml:mi><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi>t</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:mrow></mml:math></inline-formula> at the breach location <inline-formula><mml:math id="M109" display="inline"><mml:mi>b</mml:mi></mml:math></inline-formula>, the corresponding discharge reduction without retention and attenuation effects at each downstream segment <inline-formula><mml:math id="M110" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula> is computed by time-shifting <inline-formula><mml:math id="M111" display="inline"><mml:mrow><mml:mi mathvariant="bold">Δ</mml:mi><mml:msub><mml:mi mathvariant="bold-italic">Q</mml:mi><mml:mi>b</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> according to the relative travel time <inline-formula><mml:math id="M112" display="inline"><mml:mrow><mml:msubsup><mml:mi>T</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">rel</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup></mml:mrow></mml:math></inline-formula>, and applying the reduction across the relevant time steps <inline-formula><mml:math id="M113" display="inline"><mml:mi>t</mml:mi></mml:math></inline-formula>:

            <disp-formula id="Ch1.E7" content-type="numbered"><label>7</label><mml:math id="M114" display="block"><mml:mtable rowspacing="0.2ex" class="split" displaystyle="true" columnalign="right left"><mml:mtr><mml:mtd/><mml:mtd><mml:mrow><mml:msubsup><mml:mi>Q</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mo>-</mml:mo><mml:mi mathvariant="normal">Δ</mml:mi><mml:msub><mml:mover accent="true"><mml:mi>Q</mml:mi><mml:mo stretchy="false" mathvariant="normal">^</mml:mo></mml:mover><mml:mi>b</mml:mi></mml:msub><mml:mfenced close=")" open="("><mml:mrow><mml:mi>t</mml:mi><mml:mo>-</mml:mo><mml:msubsup><mml:mi>T</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">rel</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup></mml:mrow></mml:mfenced><mml:mo>,</mml:mo></mml:mrow></mml:mtd></mml:mtr><mml:mtr><mml:mtd/><mml:mtd><mml:mrow><mml:mspace linebreak="nobreak" width="1em"/><mml:mi mathvariant="normal">for</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">all</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi>i</mml:mi><mml:mo>&gt;</mml:mo><mml:mi>b</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi mathvariant="normal">and</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi>t</mml:mi><mml:mo>∈</mml:mo><mml:mfenced close="]" open="["><mml:mrow><mml:msub><mml:mi>t</mml:mi><mml:mi mathvariant="normal">B</mml:mi></mml:msub><mml:mo>+</mml:mo><mml:msubsup><mml:mi>T</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">rel</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>,</mml:mo><mml:msub><mml:mi>t</mml:mi><mml:mi mathvariant="normal">B</mml:mi></mml:msub><mml:mo>+</mml:mo><mml:msubsup><mml:mi>T</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">rel</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>+</mml:mo><mml:msub><mml:mi>N</mml:mi><mml:mrow><mml:msub><mml:mi>t</mml:mi><mml:mi>R</mml:mi></mml:msub></mml:mrow></mml:msub></mml:mrow></mml:mfenced><mml:mo>,</mml:mo></mml:mrow></mml:mtd></mml:mtr></mml:mtable></mml:math></disp-formula>

          where <inline-formula><mml:math id="M115" display="inline"><mml:mrow><mml:msub><mml:mi>t</mml:mi><mml:mi mathvariant="normal">B</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> is the time instance of breaching and <inline-formula><mml:math id="M116" display="inline"><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mrow><mml:msub><mml:mi>t</mml:mi><mml:mi mathvariant="normal">B</mml:mi></mml:msub></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula> the duration of breaching. To model retention and attenuation effects, an attenuation vector is defined as

            <disp-formula id="Ch1.E8" content-type="numbered"><label>8</label><mml:math id="M117" display="block"><mml:mrow><mml:mi mathvariant="bold-italic">A</mml:mi><mml:mo>=</mml:mo><mml:mo>(</mml:mo><mml:msub><mml:mi>A</mml:mi><mml:mn mathvariant="normal">1</mml:mn></mml:msub><mml:mo>,</mml:mo><mml:msub><mml:mi>A</mml:mi><mml:mn mathvariant="normal">2</mml:mn></mml:msub><mml:mo>,</mml:mo><mml:mi mathvariant="normal">…</mml:mi><mml:mo>,</mml:mo><mml:msub><mml:mi>A</mml:mi><mml:mi>n</mml:mi></mml:msub><mml:mo>)</mml:mo><mml:mo>∈</mml:mo><mml:msubsup><mml:mi mathvariant="double-struck">N</mml:mi><mml:mn mathvariant="normal">0</mml:mn><mml:mrow><mml:mn mathvariant="normal">1</mml:mn><mml:mo>×</mml:mo><mml:mi>n</mml:mi></mml:mrow></mml:msubsup><mml:mo>,</mml:mo></mml:mrow></mml:math></disp-formula>

          where each entry <inline-formula><mml:math id="M118" display="inline"><mml:mrow><mml:msub><mml:mi>A</mml:mi><mml:mi>i</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> represents the temporal spread of the discharge reduction at segment <inline-formula><mml:math id="M119" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula>. For each segment <inline-formula><mml:math id="M120" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula>, the attenuation factor <inline-formula><mml:math id="M121" display="inline"><mml:mrow><mml:msub><mml:mi>A</mml:mi><mml:mi>i</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> defines a symmetric temporal window of size <inline-formula><mml:math id="M122" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">τ</mml:mi><mml:mi>i</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">2</mml:mn><mml:mo>⋅</mml:mo><mml:msub><mml:mi>A</mml:mi><mml:mi>i</mml:mi></mml:msub><mml:mo>+</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:math></inline-formula>. The discharge reduction is then redistributed evenly across this window:

            <disp-formula id="Ch1.E9" content-type="numbered"><label>9</label><mml:math id="M123" display="block"><mml:mtable class="split" rowspacing="0.2ex" displaystyle="true" columnalign="right left"><mml:mtr><mml:mtd/><mml:mtd><mml:mrow><mml:msub><mml:mover accent="true"><mml:mi>Q</mml:mi><mml:mo stretchy="false" mathvariant="normal">^</mml:mo></mml:mover><mml:mrow><mml:mi mathvariant="normal">red</mml:mi><mml:mo>,</mml:mo><mml:mi>i</mml:mi></mml:mrow></mml:msub><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mo>=</mml:mo><mml:msubsup><mml:mi>Q</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mo>-</mml:mo><mml:munderover><mml:mo movablelimits="false">∑</mml:mo><mml:mrow><mml:mi>j</mml:mi><mml:mo>=</mml:mo><mml:mo>-</mml:mo><mml:msub><mml:mi>A</mml:mi><mml:mi>i</mml:mi></mml:msub></mml:mrow><mml:mrow><mml:msub><mml:mi>A</mml:mi><mml:mi>i</mml:mi></mml:msub></mml:mrow></mml:munderover><mml:mstyle displaystyle="true"><mml:mfrac style="display"><mml:mn mathvariant="normal">1</mml:mn><mml:mrow><mml:msub><mml:mi mathvariant="italic">τ</mml:mi><mml:mi>i</mml:mi></mml:msub></mml:mrow></mml:mfrac></mml:mstyle><mml:mo>⋅</mml:mo><mml:mi mathvariant="normal">Δ</mml:mi><mml:msub><mml:mover accent="true"><mml:mi>Q</mml:mi><mml:mo mathvariant="normal" stretchy="false">^</mml:mo></mml:mover><mml:mi>b</mml:mi></mml:msub><mml:mfenced open="(" close=")"><mml:mrow><mml:mi>t</mml:mi><mml:mo>+</mml:mo><mml:mi>j</mml:mi><mml:mo>-</mml:mo><mml:msubsup><mml:mi>T</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">rel</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup></mml:mrow></mml:mfenced><mml:mo>,</mml:mo></mml:mrow></mml:mtd></mml:mtr><mml:mtr><mml:mtd/><mml:mtd><mml:mrow><mml:mspace linebreak="nobreak" width="1em"/><mml:mi mathvariant="normal">for</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi mathvariant="normal">all</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi>i</mml:mi><mml:mo>&gt;</mml:mo><mml:mi>b</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">and</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi>t</mml:mi><mml:mo>∈</mml:mo><mml:mfenced close="]" open="["><mml:mrow><mml:msub><mml:mi>t</mml:mi><mml:mi mathvariant="normal">B</mml:mi></mml:msub><mml:mo>+</mml:mo><mml:msubsup><mml:mi>T</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">rel</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>,</mml:mo><mml:msub><mml:mi>t</mml:mi><mml:mi mathvariant="normal">B</mml:mi></mml:msub><mml:mo>+</mml:mo><mml:msubsup><mml:mi>T</mml:mi><mml:mi>i</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">rel</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>+</mml:mo><mml:msub><mml:mi>N</mml:mi><mml:mrow><mml:msub><mml:mi>t</mml:mi><mml:mi>R</mml:mi></mml:msub></mml:mrow></mml:msub></mml:mrow></mml:mfenced></mml:mrow></mml:mtd></mml:mtr></mml:mtable></mml:math></disp-formula></p>
      <p id="d2e2724">This operation preserves the total reduction volume while approximating the attenuation observed in the hydraulic simulations. The attenuation vector <inline-formula><mml:math id="M124" display="inline"><mml:mi mathvariant="bold-italic">A</mml:mi></mml:math></inline-formula> is composed of a generic, segment-independent component <inline-formula><mml:math id="M125" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="bold-italic">A</mml:mi><mml:mi mathvariant="normal">g</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, and a segment-specific component <inline-formula><mml:math id="M126" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="bold-italic">A</mml:mi><mml:mi mathvariant="normal">s</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>. The attenuation vector entry <inline-formula><mml:math id="M127" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula> given a discharge reduction at a location <inline-formula><mml:math id="M128" display="inline"><mml:mi>b</mml:mi></mml:math></inline-formula> is calculated as

            <disp-formula id="Ch1.E10" content-type="numbered"><label>10</label><mml:math id="M129" display="block"><mml:mrow><mml:msub><mml:mi>A</mml:mi><mml:mi>i</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:msub><mml:mi>A</mml:mi><mml:mrow><mml:mi mathvariant="normal">g</mml:mi><mml:mo>,</mml:mo><mml:mi>i</mml:mi></mml:mrow></mml:msub><mml:mo>+</mml:mo><mml:msub><mml:mi>A</mml:mi><mml:mrow><mml:mi mathvariant="normal">s</mml:mi><mml:mo>,</mml:mo><mml:mi>i</mml:mi></mml:mrow></mml:msub><mml:mo>-</mml:mo><mml:msub><mml:mi>A</mml:mi><mml:mrow><mml:mi mathvariant="normal">s</mml:mi><mml:mo>,</mml:mo><mml:mi>b</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></disp-formula></p>
      <p id="d2e2818">To derive the attenuation vector components, a set of <inline-formula><mml:math id="M130" display="inline"><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">sim</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">18</mml:mn></mml:mrow></mml:math></inline-formula> additional hydraulic simulations are performed, where artificial discharge reductions are applied at different locations in the river network. The optimal attenuation vector components <inline-formula><mml:math id="M131" display="inline"><mml:mrow><mml:msubsup><mml:mi>A</mml:mi><mml:mrow><mml:mi mathvariant="normal">g</mml:mi><mml:mo>,</mml:mo><mml:mi>i</mml:mi></mml:mrow><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">opt</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup></mml:mrow></mml:math></inline-formula> and <inline-formula><mml:math id="M132" display="inline"><mml:mrow><mml:msubsup><mml:mi>A</mml:mi><mml:mrow><mml:mi mathvariant="normal">s</mml:mi><mml:mo>,</mml:mo><mml:mi>i</mml:mi></mml:mrow><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">opt</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup></mml:mrow></mml:math></inline-formula> for each segment <inline-formula><mml:math id="M133" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula> are determined through a parameter search procedure that minimizes the global error between the 1D hydraulic model and the translated and attenuated discharge reductions applying the vector-based approach across all scenarios for a range of candidate values:

            <disp-formula id="Ch1.E11" content-type="numbered"><label>11</label><mml:math id="M134" display="block"><mml:mrow><mml:mtable rowspacing="0.2ex" class="split" displaystyle="true" columnalign="right left"><mml:mtr><mml:mtd/><mml:mtd><mml:mrow><mml:mfenced close="]" open="["><mml:mrow><mml:msubsup><mml:mi mathvariant="bold-italic">A</mml:mi><mml:mi mathvariant="normal">g</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">opt</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>,</mml:mo><mml:msubsup><mml:mi mathvariant="bold-italic">A</mml:mi><mml:mi mathvariant="normal">s</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">opt</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup></mml:mrow></mml:mfenced><mml:mo>=</mml:mo></mml:mrow></mml:mtd></mml:mtr><mml:mtr><mml:mtd/><mml:mtd><mml:mrow><mml:mstyle displaystyle="true"><mml:mfrac style="display"><mml:mn mathvariant="normal">1</mml:mn><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">sim</mml:mi></mml:msub></mml:mrow></mml:mfrac></mml:mstyle><mml:munderover><mml:mo movablelimits="false">∑</mml:mo><mml:mrow><mml:mi>k</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">sim</mml:mi></mml:msub></mml:mrow></mml:munderover><mml:mi>arg⁡</mml:mi><mml:munder><mml:mo movablelimits="false">min⁡</mml:mo><mml:mrow><mml:msub><mml:mi mathvariant="bold-italic">A</mml:mi><mml:mi mathvariant="normal">g</mml:mi></mml:msub><mml:mo>,</mml:mo><mml:msub><mml:mi mathvariant="bold-italic">A</mml:mi><mml:mi mathvariant="normal">s</mml:mi></mml:msub></mml:mrow></mml:munder><mml:mfenced open="{" close="}"><mml:mrow><mml:munderover><mml:mo movablelimits="false">∑</mml:mo><mml:mrow><mml:mi>t</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi>t</mml:mi></mml:msub></mml:mrow></mml:munderover><mml:munderover><mml:mo movablelimits="false">∑</mml:mo><mml:mrow><mml:mi>i</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow><mml:mi>n</mml:mi></mml:munderover><mml:msup><mml:mfenced open="(" close=")"><mml:mrow><mml:msubsup><mml:mi>Q</mml:mi><mml:mi mathvariant="normal">red</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>,</mml:mo><mml:mi>i</mml:mi><mml:mo>)</mml:mo><mml:mo>-</mml:mo><mml:msubsup><mml:mover accent="true"><mml:mi>Q</mml:mi><mml:mo mathvariant="normal" stretchy="false">^</mml:mo></mml:mover><mml:mi mathvariant="normal">red</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>,</mml:mo><mml:mi>i</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:mfenced><mml:mn mathvariant="normal">2</mml:mn></mml:msup></mml:mrow></mml:mfenced></mml:mrow></mml:mtd></mml:mtr></mml:mtable></mml:mrow></mml:math></disp-formula></p>

      <fig id="F7" specific-use="star"><label>Figure 7</label><caption><p id="d2e3066">Comparison of 1D hydraulic SOBEK model results and vector based approach at 8 different locations. Kilometer values indicate distance to discharge reduction section. In black: Uncapped input hydrograph, in blue: propagated discharge reduction using 1D hydraulic model, in red: vector-based discharge reduction propagation.</p></caption>
          <graphic xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026-f07.png"/>

        </fig>

      <p id="d2e3075">The vector-based flood routing approach is tested using an independent set of 40 1D hydraulic simulations, in which the peak discharge is reduced by 8 <inline-formula><mml:math id="M135" display="inline"><mml:mo>×</mml:mo></mml:math></inline-formula> 10<sup>6</sup> m<sup>3</sup> at the location of the detention basin at segment 216, which is introduced in Sect. <xref ref-type="sec" rid="Ch1.S5"/>. The comparison of one resulting set of hydrographs at eight downstream segments is presented in Fig. <xref ref-type="fig" rid="F7"/>.</p>
      <p id="d2e3107">Differences in peak discharge <inline-formula><mml:math id="M138" display="inline"><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>Q</mml:mi></mml:mrow></mml:math></inline-formula> relative to the vector-based peak discharge, temporal offset of peak discharge <inline-formula><mml:math id="M139" display="inline"><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>T</mml:mi></mml:mrow></mml:math></inline-formula>, absolute difference in peak water level <inline-formula><mml:math id="M140" display="inline"><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>W</mml:mi></mml:mrow></mml:math></inline-formula>, as well as the continuous Nash-Sutcliffe-Efficiency (NSE) criterion are evaluated at 15 downstream gauges for all 40 flood scenarios. The NSE is defined as

            <disp-formula id="Ch1.E12" content-type="numbered"><label>12</label><mml:math id="M141" display="block"><mml:mrow><mml:mi mathvariant="normal">NSE</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">1</mml:mn><mml:mo>-</mml:mo><mml:mstyle displaystyle="true"><mml:mfrac style="display"><mml:mrow><mml:msubsup><mml:mo>∑</mml:mo><mml:mrow><mml:mi>t</mml:mi><mml:mo>=</mml:mo><mml:msub><mml:mi>t</mml:mi><mml:mrow><mml:mi mathvariant="normal">start</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi mathvariant="normal">fill</mml:mi></mml:mrow></mml:msub></mml:mrow><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi>t</mml:mi></mml:msub></mml:mrow></mml:msubsup><mml:msup><mml:mfenced close=")" open="("><mml:mrow><mml:msub><mml:mi>Q</mml:mi><mml:mi mathvariant="normal">ref</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mo>-</mml:mo><mml:msub><mml:mi>Q</mml:mi><mml:mi mathvariant="normal">model</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:mfenced><mml:mn mathvariant="normal">2</mml:mn></mml:msup></mml:mrow><mml:mrow><mml:msubsup><mml:mo>∑</mml:mo><mml:mrow><mml:msub><mml:mi>t</mml:mi><mml:mrow><mml:mi mathvariant="normal">start</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi mathvariant="normal">fill</mml:mi></mml:mrow></mml:msub></mml:mrow><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi>t</mml:mi></mml:msub></mml:mrow></mml:msubsup><mml:msup><mml:mfenced open="(" close=")"><mml:mrow><mml:msub><mml:mi>Q</mml:mi><mml:mi mathvariant="normal">ref</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mo>-</mml:mo><mml:mover accent="true"><mml:mrow><mml:msub><mml:mi>Q</mml:mi><mml:mi mathvariant="normal">ref</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo></mml:mrow><mml:mo mathvariant="normal">‾</mml:mo></mml:mover></mml:mrow></mml:mfenced><mml:mn mathvariant="normal">2</mml:mn></mml:msup></mml:mrow></mml:mfrac></mml:mstyle></mml:mrow></mml:math></disp-formula>

          where model indicates the results of the vector-based propagation approach, ref those of the 1D hydraulic simulation that serve as the reference, <inline-formula><mml:math id="M142" display="inline"><mml:mrow><mml:msub><mml:mi>t</mml:mi><mml:mrow><mml:mi mathvariant="normal">start</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">fill</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula> the first time instance at which the detention basin is filled (and the discharge downstream reduced) and <inline-formula><mml:math id="M143" display="inline"><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi>t</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> the total number of time steps. The resulting statistics of the quality criteria are shown in Fig. <xref ref-type="fig" rid="F8"/>. They indicate that the differences between the hydraulic and vector-based routing results are low, especially compared to the discrepancy between the 1D and 2D hydraulic simulations.</p>

      <fig id="F8" specific-use="star"><label>Figure 8</label><caption><p id="d2e3293">Quality criteria of vector-based flood routing approach, evaluated at 15 downstream segments. <inline-formula><mml:math id="M144" display="inline"><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>Q</mml:mi></mml:mrow></mml:math></inline-formula> refers to the difference in peak discharge between vector-based and 1D hydraulic simulation relative to the absolute peak discharge in the 1D simulation. <inline-formula><mml:math id="M145" display="inline"><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>T</mml:mi></mml:mrow></mml:math></inline-formula> is the temporal offset of the peak discharge [h], <inline-formula><mml:math id="M146" display="inline"><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>W</mml:mi></mml:mrow></mml:math></inline-formula> the absolute difference in peak water level [m], NSE the Nash-Sutcliffe-Efficiency of all discharge times series of the vector-based approach compared against the 1D hydraulic simulation.</p></caption>
          <graphic xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026-f08.png"/>

        </fig>

      <p id="d2e3333">At bifurcation points, where the river splits into multiple channels, the vector-based routing approach does not explicitly resolve travel time or retention differences between the diverging paths. However, discharge reductions must be accurately partitioned between different channels. To achieve this, a main reach and a threshold discharge <inline-formula><mml:math id="M147" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="bold-italic">Q</mml:mi><mml:mi mathvariant="normal">th</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> are defined at each bifurcation segment. Secondary channels are activated only when the local discharge exceeds <inline-formula><mml:math id="M148" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="bold-italic">Q</mml:mi><mml:mi mathvariant="normal">th</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>. The distribution of the  discharge reduction is then determined using lookup tables <inline-formula><mml:math id="M149" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="bold">Q</mml:mi><mml:mi mathvariant="normal">share</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, derived from the hydraulic simulations in Sect. <xref ref-type="sec" rid="Ch1.S3.SS1"/>. For each bifurcation segment, <inline-formula><mml:math id="M150" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="bold">Q</mml:mi><mml:mi mathvariant="normal">share</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> maps the effective discharge <inline-formula><mml:math id="M151" display="inline"><mml:mrow><mml:msub><mml:mi>Q</mml:mi><mml:mi mathvariant="normal">eff</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mo>=</mml:mo><mml:mi>Q</mml:mi><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mo>-</mml:mo><mml:msub><mml:mi>Q</mml:mi><mml:mi mathvariant="normal">th</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> to a discharge split ratio across the available channels. This ensures that discharge reductions are apportioned consistently with observed flow behavior in the hydraulic model.</p>
</sec>
<sec id="Ch1.S3.SS5">
  <label>3.5</label><title>Damage module</title>
      <p id="d2e3425">Flood damages can be classified into direct and indirect damages and further subdivided into tangible and intangible damages <xref ref-type="bibr" rid="bib1.bibx29" id="paren.69"/>. The proposed flood risk model primarily addresses tangible damages. Considerable research has been conducted on direct tangible flood damage estimation, resulting in the introduction of various methodologies in recent years. Factors such as available data, understanding of damaging processes, study scale, and computational resources may limit the accuracy of direct tangible damage assessments. The general procedure for tangible flood damage assessment can be outlined in three steps <xref ref-type="bibr" rid="bib1.bibx15 bib1.bibx32" id="paren.70"/>: (1) classification of elements at risk, (2) exposure analysis estimating the number, type, and asset value of these elements, and (3) vulnerability analysis, which evaluates the relative damages of exposed assets given the flood impact. <list list-type="order"><list-item>
      <p id="d2e3436">In large-scale flood risk analyses, elements at risk are typically grouped into classes. Within a class, all elements are treated uniformly; for example, their vulnerability to flooding is assumed to be identical. The number of groups and the corresponding detail of the classification depend on the study's scale and objectives, the significance of the objects within each class, data availability, and computational resources. In flood risk studies, classification is commonly based on land-use classes.</p></list-item><list-item>
      <p id="d2e3440">The exposure analysis identifies elements at risk from flooding. This is typically achieved by intersecting land-use data (or other class data) with inundation data using geographic information systems. Disaggregation may be necessary when class polygons are large.</p></list-item><list-item>
      <p id="d2e3444">Damage functions relate the (relative) damage within an asset class to specific intensity parameters. The most frequently used intensity parameter in flood damage assessments is inundation depth; however, other parameters, such as flow velocity, duration of inundation, contamination, and time of occurrence, also affect the losses. Neglecting these parameters can lead to significant errors in damage estimation. Nevertheless, such simplifications are frequently made due to data or computational constraints. Damage functions can be derived through empirical or synthetic approaches <xref ref-type="bibr" rid="bib1.bibx29" id="paren.71"/>. A wide variety of damage functions for the same asset classes exists in the scientific literature, as well as in flood risk management and insurance practices, indicating substantial uncertainties <xref ref-type="bibr" rid="bib1.bibx32" id="paren.72"/>. When selecting a damage function, it is crucial to ensure compatibility between asset classes and the corresponding damage functions.</p></list-item></list></p>
      <p id="d2e3453">The damage assessment approach employed in this study aligns with the established three-stage methodology. Damage classes are assigned based on the land-use classifications utilized in the Basic European Assets Map (BEAM) <xref ref-type="bibr" rid="bib1.bibx19" id="paren.73"/>. This map comprises 12 land-use classes, which are further subdivided into asset classes to facilitate more precise asset assessment. BEAM is composed of polygons based on the underlying land use structure. A land use class and relative asset value [EUR m<sup>−2</sup>] is assigned to each polygon. For every inundation area, a GIS-based intersection is conducted between the DEM, BEAM polygon layer, and the inundation polygon. For every grid cell of the DEM, the height difference between the DEM and the inundation polygon is calculated, referred to as water depth. To optimize computational efficiency, water depth is discretized into intervals. Additionally, the predominant land-use class at each cell and its corresponding asset value are extracted. Asset value information for each cell is organized in a table based on land-use and water depth classes, with all values in the same table entry summed up. To calculate the direct damage, each asset value in the table is multiplied by the respective value of the specific damage function for the land-use class and water depth. BEAM-specific damage functions developed for southern Germany are adopted for this analysis <xref ref-type="bibr" rid="bib1.bibx19" id="paren.74"/>. The total direct damage for each inundation area is derived by summing all individual polygon damages. Given that inundation areas are delineated at 10 cm intervals for each dike segment (see Sect. <xref ref-type="sec" rid="Ch1.S3.SS3"/>), direct damages are available for every 10 cm of inundation elevation. Using the inundation volumes generated in the flood simulation model as an input, a linear interpolation is performed between these <inline-formula><mml:math id="M153" display="inline"><mml:mi>V</mml:mi></mml:math></inline-formula>–<inline-formula><mml:math id="M154" display="inline"><mml:mi>D</mml:mi></mml:math></inline-formula> data pairs to convert segment-specific inundation volumes into direct damages in a post-processing step, which is depicted in the lower panel of Fig. <xref ref-type="fig" rid="F9"/> for segment 500. This approach facilitates computationally efficient damage evaluations across numerous potential failure locations.</p>

      <fig id="F9"><label>Figure 9</label><caption><p id="d2e3495">Relation between volume and elevation (upper) and volume and damage (lower) of dike segment 500 (left river side).</p></caption>
          <graphic xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026-f09.png"/>

        </fig>

      <p id="d2e3505">Based on the inundation areas of the river sections derived in the inundation module, damages are additionally estimated for river sections following the approach outlined for dike segments. As a result, every river section is associated with a <inline-formula><mml:math id="M155" display="inline"><mml:mi>W</mml:mi></mml:math></inline-formula>–<inline-formula><mml:math id="M156" display="inline"><mml:mi>D</mml:mi></mml:math></inline-formula> relation, where <inline-formula><mml:math id="M157" display="inline"><mml:mi>W</mml:mi></mml:math></inline-formula> denotes the water level in the river section. Flooding in the river section is treated as deterministic conditional on the maximum water level over all time steps resulting from the probabilistic breach analysis. If the river is bifuricated in the section, the lower, non-zero maximum water level of the two segments of a river section is taken as decisive. All damages, e.g., from river sections and dike segments, are summed up to obtain the total direct damage of the simulation run.</p>
      <p id="d2e3529">Following a comprehensive literature review <xref ref-type="bibr" rid="bib1.bibx42 bib1.bibx8 bib1.bibx34 bib1.bibx12 bib1.bibx36" id="paren.75"/>, business interruption costs are estimated at 30 % of the direct damages. Indirect damages are included by adding another 30 % to these costs. Hence, direct damages are augmented by a total of <inline-formula><mml:math id="M158" display="inline"><mml:mrow><mml:mn mathvariant="normal">1.3</mml:mn><mml:mo>⋅</mml:mo><mml:mn mathvariant="normal">1.3</mml:mn><mml:mo>=</mml:mo><mml:mn mathvariant="normal">1.69</mml:mn></mml:mrow></mml:math></inline-formula>. It is generally expected that indirect costs and business interruption expenses increase non-linearly with increasing damages; however, the extent of this relationship remains unclear and is influenced by various factors <xref ref-type="bibr" rid="bib1.bibx26" id="paren.76"/>. Current methods for the comprehensive quantification of indirect damages and business interruption costs at large scale studies are still inadequate <xref ref-type="bibr" rid="bib1.bibx30" id="paren.77"/>, justifying the choice to employ two constant factors. Intangible damages are quantified in non-monetary terms, considering factors such as fatalities, natural reserves, critical infrastructure and drinking water protected areas. The reduction of risk associated with these factors is communicated as an additional quantitative benefit of the measures implemented, but it is not included in the formal benefit-cost analysis.</p>
</sec>
<sec id="Ch1.S3.SS6">
  <label>3.6</label><title>Model Implementation</title>
      <p id="d2e3566">The developed flood risk model differs from other methodologies, such as those presented by <xref ref-type="bibr" rid="bib1.bibx48" id="text.78"/> and <xref ref-type="bibr" rid="bib1.bibx16" id="text.79"/>, primarily in that the flood simulation model is executed without runtime-coupling with computationally expensive hydraulic and hydrodynamic simulations. This approach enhances computational efficiency while explicitly modeling the effects of the flood process components and their interactions, as is necessary to address the challenges outlines in the introduction. This also enables its incorporation into a comprehensive uncertainty analysis framework, as outlined in the next section. The computational cost of the flood simulation model is on average 0.76 seconds per run (8-thread, 2.8 GHz CPU, no explicit parallelization). This cost scales approximately linearly with the number of breaches. A schematic representation of the model's architecture, implemented in a Matlab environment, is provided in Fig. <xref ref-type="fig" rid="F10"/>, illustrating the workflow that is executed during each simulation run.</p>

      <fig id="F10" specific-use="star"><label>Figure 10</label><caption><p id="d2e3579">Process diagram of flood simulation model. Schematically shown is the procedure for one Monte Carlo run.</p></caption>
          <graphic xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026-f10.png"/>

        </fig>

</sec>
</sec>
<sec id="Ch1.S4">
  <label>4</label><title>Uncertainty modeling</title>
      <p id="d2e3597">Generally, uncertainties can be categorized into two types: aleatory and epistemic <xref ref-type="bibr" rid="bib1.bibx22" id="paren.80"/>. Aleatory uncertainties refer to the inherent natural variability or randomness within the flood process that cannot be reduced by the modeler. By contrast, epistemic uncertainties denote the uncertainties associated with the model and its input data, which can potentially be reduced. Thus, it is imperative, especially within a decision-making context, to quantify the impact of epistemic model uncertainties on the relevant decision parameter(s). For that purpose, the flood risk model is embedded in a 2-level Monte Carlo framework.</p>
<sec id="Ch1.S4.SS1">
  <label>4.1</label><title>2-level Monte Carlo framework</title>
      <p id="d2e3610">In the following, <inline-formula><mml:math id="M159" display="inline"><mml:mrow><mml:mi>Y</mml:mi><mml:mo>=</mml:mo><mml:mi mathvariant="script">Y</mml:mi><mml:mo>(</mml:mo><mml:mi mathvariant="bold">X</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> denotes the outcome of the flood simulation model, i.e., the damage estimate associated with a single flood event, with aleatory and epistemic uncertain input parameters <inline-formula><mml:math id="M160" display="inline"><mml:mrow><mml:mi mathvariant="bold">X</mml:mi><mml:mo>=</mml:mo><mml:mo>[</mml:mo><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">a</mml:mi></mml:msub><mml:mo>,</mml:mo><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>]</mml:mo></mml:mrow></mml:math></inline-formula>, which are modeled as random variables. <inline-formula><mml:math id="M161" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">a</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> contains aleatory random variables, representing the  natural variability in flood events, dike resistances and breach widths of failed dike segments. Given the large number of dike segments (<inline-formula><mml:math id="M162" display="inline"><mml:mrow><mml:mo>≈</mml:mo><mml:mn mathvariant="normal">500</mml:mn></mml:mrow></mml:math></inline-formula>) and consequently aleatory random variables, together with the strong nonlinearity of the model response with respect to <inline-formula><mml:math id="M163" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">a</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, the conditional expectation of the damage given <inline-formula><mml:math id="M164" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> is estimated via a first-level Monte Carlo simulation with <inline-formula><mml:math id="M165" display="inline"><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mrow><mml:msub><mml:mi mathvariant="normal">MC</mml:mi><mml:mi mathvariant="normal">a</mml:mi></mml:msub></mml:mrow></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">3600</mml:mn></mml:mrow></mml:math></inline-formula> samples:

            <disp-formula id="Ch1.E13" content-type="numbered"><label>13</label><mml:math id="M166" display="block"><mml:mtable class="split" rowspacing="0.2ex" displaystyle="true" columnalign="right left"><mml:mtr><mml:mtd><mml:mrow><mml:msub><mml:mi mathvariant="script">Y</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:msub><mml:mi mathvariant="bold">x</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>)</mml:mo></mml:mrow></mml:mtd><mml:mtd><mml:mrow><mml:mo>=</mml:mo><mml:msub><mml:mi mathvariant="double-struck">E</mml:mi><mml:mrow><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">a</mml:mi></mml:msub><mml:mo>|</mml:mo><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:msub><mml:mi mathvariant="bold">x</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub></mml:mrow></mml:msub><mml:mfenced open="[" close="]"><mml:mrow><mml:mi mathvariant="script">Y</mml:mi><mml:mfenced open="(" close=")"><mml:mrow><mml:mo>[</mml:mo><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:msub><mml:mi mathvariant="bold">x</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>,</mml:mo><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">a</mml:mi></mml:msub><mml:mo>]</mml:mo></mml:mrow></mml:mfenced></mml:mrow></mml:mfenced></mml:mrow></mml:mtd></mml:mtr><mml:mtr><mml:mtd/><mml:mtd><mml:mrow><mml:mo>≈</mml:mo><mml:mstyle displaystyle="true"><mml:mfrac style="display"><mml:mn mathvariant="normal">1</mml:mn><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mrow><mml:msub><mml:mi mathvariant="normal">MC</mml:mi><mml:mi mathvariant="normal">a</mml:mi></mml:msub></mml:mrow></mml:msub></mml:mrow></mml:mfrac></mml:mstyle><mml:munderover><mml:mo movablelimits="false">∑</mml:mo><mml:mrow><mml:mi>j</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mrow><mml:msub><mml:mi mathvariant="normal">MC</mml:mi><mml:mi mathvariant="normal">a</mml:mi></mml:msub></mml:mrow></mml:msub></mml:mrow></mml:munderover><mml:mi mathvariant="script">Y</mml:mi><mml:mfenced close=")" open="("><mml:mrow><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:msub><mml:mi mathvariant="bold">x</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>,</mml:mo><mml:msubsup><mml:mi mathvariant="bold">x</mml:mi><mml:mi mathvariant="normal">a</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi>j</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup></mml:mrow></mml:mfenced><mml:mo>,</mml:mo></mml:mrow></mml:mtd></mml:mtr></mml:mtable></mml:math></disp-formula></p>

<table-wrap id="T1" specific-use="star"><label>Table 1</label><caption><p id="d2e3880">Quantified uncertain parameters and their first order Sobol' indices.</p></caption><oasis:table frame="topbot"><oasis:tgroup cols="8">
     <oasis:colspec colnum="1" colname="col1" align="left"/>
     <oasis:colspec colnum="2" colname="col2" align="left" colsep="1"/>
     <oasis:colspec colnum="3" colname="col3" align="left"/>
     <oasis:colspec colnum="4" colname="col4" align="right"/>
     <oasis:colspec colnum="5" colname="col5" align="right"/>
     <oasis:colspec colnum="6" colname="col6" align="right"/>
     <oasis:colspec colnum="7" colname="col7" align="right" colsep="1"/>
     <oasis:colspec colnum="8" colname="col8" align="right"/>
     <oasis:thead>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">Uncertainty</oasis:entry>
         <oasis:entry colname="col3">Parametrization</oasis:entry>
         <oasis:entry colname="col4">Mean</oasis:entry>
         <oasis:entry colname="col5">Mode</oasis:entry>
         <oasis:entry colname="col6">Std.</oasis:entry>
         <oasis:entry colname="col7">Interval</oasis:entry>
         <oasis:entry colname="col8">Sobol' index</oasis:entry>
       </oasis:row>
     </oasis:thead>
     <oasis:tbody>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M167" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mn mathvariant="normal">1</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Fragility function</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4">0.5</oasis:entry>
         <oasis:entry colname="col5">0.5</oasis:entry>
         <oasis:entry colname="col6">0.19</oasis:entry>
         <oasis:entry colname="col7">[<inline-formula><mml:math id="M168" display="inline"><mml:mrow><mml:mn mathvariant="normal">0</mml:mn><mml:mo>,</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:math></inline-formula>]</oasis:entry>
         <oasis:entry colname="col8">0</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M169" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mn mathvariant="normal">2</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2"><inline-formula><mml:math id="M170" display="inline"><mml:mi>W</mml:mi></mml:math></inline-formula> in <inline-formula><mml:math id="M171" display="inline"><mml:mi>Q</mml:mi></mml:math></inline-formula>–<inline-formula><mml:math id="M172" display="inline"><mml:mi>W</mml:mi></mml:math></inline-formula> relation river segments</oasis:entry>
         <oasis:entry colname="col3">A</oasis:entry>
         <oasis:entry colname="col4">0</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.075</oasis:entry>
         <oasis:entry colname="col7">[<inline-formula><mml:math id="M173" display="inline"><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">0.3</mml:mn><mml:mo>,</mml:mo><mml:mn mathvariant="normal">0.3</mml:mn></mml:mrow></mml:math></inline-formula>]</oasis:entry>
         <oasis:entry colname="col8">0.08</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M174" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mn mathvariant="normal">3</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Dike crest height</oasis:entry>
         <oasis:entry colname="col3">A</oasis:entry>
         <oasis:entry colname="col4">0</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.05</oasis:entry>
         <oasis:entry colname="col7">[<inline-formula><mml:math id="M175" display="inline"><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">0.2</mml:mn><mml:mo>,</mml:mo><mml:mn mathvariant="normal">0.2</mml:mn></mml:mrow></mml:math></inline-formula>]</oasis:entry>
         <oasis:entry colname="col8">0</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M176" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mn mathvariant="normal">4</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Discharge reduction factor   <inline-formula><mml:math id="M177" display="inline"><mml:mrow><mml:msup><mml:mi mathvariant="italic">μ</mml:mi><mml:mo>∗</mml:mo></mml:msup></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col3">I</oasis:entry>
         <oasis:entry colname="col4">0.7</oasis:entry>
         <oasis:entry colname="col5">0.72</oasis:entry>
         <oasis:entry colname="col6">0.11</oasis:entry>
         <oasis:entry colname="col7">[<inline-formula><mml:math id="M178" display="inline"><mml:mrow><mml:mn mathvariant="normal">0.3</mml:mn><mml:mo>,</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:math></inline-formula>]</oasis:entry>
         <oasis:entry colname="col8">0.01</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M179" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mn mathvariant="normal">5</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2"><inline-formula><mml:math id="M180" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">μ</mml:mi><mml:mrow><mml:mi>ln⁡</mml:mi><mml:mi>b</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula> of breach width PDF</oasis:entry>
         <oasis:entry colname="col3">I</oasis:entry>
         <oasis:entry colname="col4">3.9</oasis:entry>
         <oasis:entry colname="col5">3.77</oasis:entry>
         <oasis:entry colname="col6">0.29</oasis:entry>
         <oasis:entry colname="col7">[<inline-formula><mml:math id="M181" display="inline"><mml:mrow><mml:mn mathvariant="normal">3.3</mml:mn><mml:mo>,</mml:mo><mml:mn mathvariant="normal">6</mml:mn></mml:mrow></mml:math></inline-formula>]</oasis:entry>
         <oasis:entry colname="col8">0</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M182" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mn mathvariant="normal">6</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Breach height</oasis:entry>
         <oasis:entry colname="col3">M</oasis:entry>
         <oasis:entry colname="col4">0.96</oasis:entry>
         <oasis:entry colname="col5">1</oasis:entry>
         <oasis:entry colname="col6">0.1</oasis:entry>
         <oasis:entry colname="col7">[<inline-formula><mml:math id="M183" display="inline"><mml:mrow><mml:mn mathvariant="normal">0.2</mml:mn><mml:mo>,</mml:mo><mml:mn mathvariant="normal">1.25</mml:mn></mml:mrow></mml:math></inline-formula>]</oasis:entry>
         <oasis:entry colname="col8">0</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M184" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mn mathvariant="normal">7</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Limit discharge</oasis:entry>
         <oasis:entry colname="col3">M</oasis:entry>
         <oasis:entry colname="col4">1.05</oasis:entry>
         <oasis:entry colname="col5">1</oasis:entry>
         <oasis:entry colname="col6">0.11</oasis:entry>
         <oasis:entry colname="col7">[<inline-formula><mml:math id="M185" display="inline"><mml:mrow><mml:mn mathvariant="normal">0.8</mml:mn><mml:mo>,</mml:mo><mml:mn mathvariant="normal">1.5</mml:mn></mml:mrow></mml:math></inline-formula>]</oasis:entry>
         <oasis:entry colname="col8">0.01</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M186" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mn mathvariant="normal">8</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Maximum outflow volume</oasis:entry>
         <oasis:entry colname="col3">M</oasis:entry>
         <oasis:entry colname="col4">1.04</oasis:entry>
         <oasis:entry colname="col5">1</oasis:entry>
         <oasis:entry colname="col6">0.13</oasis:entry>
         <oasis:entry colname="col7">[<inline-formula><mml:math id="M187" display="inline"><mml:mrow><mml:mn mathvariant="normal">0.7</mml:mn><mml:mo>,</mml:mo><mml:mn mathvariant="normal">1.8</mml:mn></mml:mrow></mml:math></inline-formula>]</oasis:entry>
         <oasis:entry colname="col8">0.01</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M188" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mn mathvariant="normal">9</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2"><inline-formula><mml:math id="M189" display="inline"><mml:mi>V</mml:mi></mml:math></inline-formula> in <inline-formula><mml:math id="M190" display="inline"><mml:mi>V</mml:mi></mml:math></inline-formula>–<inline-formula><mml:math id="M191" display="inline"><mml:mi>E</mml:mi></mml:math></inline-formula> relation dike segments</oasis:entry>
         <oasis:entry colname="col3">M</oasis:entry>
         <oasis:entry colname="col4">1</oasis:entry>
         <oasis:entry colname="col5">1</oasis:entry>
         <oasis:entry colname="col6">0.08</oasis:entry>
         <oasis:entry colname="col7">[<inline-formula><mml:math id="M192" display="inline"><mml:mrow><mml:mn mathvariant="normal">0.5</mml:mn><mml:mo>,</mml:mo><mml:mn mathvariant="normal">1.5</mml:mn></mml:mrow></mml:math></inline-formula>]</oasis:entry>
         <oasis:entry colname="col8">0.01</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M193" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mn mathvariant="normal">10</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2"><inline-formula><mml:math id="M194" display="inline"><mml:mi>D</mml:mi></mml:math></inline-formula> in <inline-formula><mml:math id="M195" display="inline"><mml:mi>V</mml:mi></mml:math></inline-formula>–<inline-formula><mml:math id="M196" display="inline"><mml:mi>D</mml:mi></mml:math></inline-formula> relation dike segments</oasis:entry>
         <oasis:entry colname="col3">M</oasis:entry>
         <oasis:entry colname="col4">1</oasis:entry>
         <oasis:entry colname="col5">1</oasis:entry>
         <oasis:entry colname="col6">0.13</oasis:entry>
         <oasis:entry colname="col7">[<inline-formula><mml:math id="M197" display="inline"><mml:mrow><mml:mn mathvariant="normal">0.4</mml:mn><mml:mo>,</mml:mo><mml:mn mathvariant="normal">1.6</mml:mn></mml:mrow></mml:math></inline-formula>]</oasis:entry>
         <oasis:entry colname="col8">0.03</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M198" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mn mathvariant="normal">11</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2"><inline-formula><mml:math id="M199" display="inline"><mml:mi>D</mml:mi></mml:math></inline-formula> in <inline-formula><mml:math id="M200" display="inline"><mml:mi>W</mml:mi></mml:math></inline-formula>–<inline-formula><mml:math id="M201" display="inline"><mml:mi>D</mml:mi></mml:math></inline-formula> relation river sections</oasis:entry>
         <oasis:entry colname="col3">M</oasis:entry>
         <oasis:entry colname="col4">1</oasis:entry>
         <oasis:entry colname="col5">1.01</oasis:entry>
         <oasis:entry colname="col6">0.14</oasis:entry>
         <oasis:entry colname="col7">[<inline-formula><mml:math id="M202" display="inline"><mml:mrow><mml:mn mathvariant="normal">0.1</mml:mn><mml:mo>,</mml:mo><mml:mn mathvariant="normal">1.6</mml:mn></mml:mrow></mml:math></inline-formula>]</oasis:entry>
         <oasis:entry colname="col8">0.15</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M203" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mn mathvariant="normal">12</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Business interruption factor</oasis:entry>
         <oasis:entry colname="col3">I</oasis:entry>
         <oasis:entry colname="col4">1.35</oasis:entry>
         <oasis:entry colname="col5">1.3</oasis:entry>
         <oasis:entry colname="col6">0.16</oasis:entry>
         <oasis:entry colname="col7">[<inline-formula><mml:math id="M204" display="inline"><mml:mrow><mml:mn mathvariant="normal">1</mml:mn><mml:mo>,</mml:mo><mml:mn mathvariant="normal">2</mml:mn></mml:mrow></mml:math></inline-formula>]</oasis:entry>
         <oasis:entry colname="col8">0.15</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M205" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mn mathvariant="normal">13</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Indirect damage factor</oasis:entry>
         <oasis:entry colname="col3">I</oasis:entry>
         <oasis:entry colname="col4">1.48</oasis:entry>
         <oasis:entry colname="col5">1.3</oasis:entry>
         <oasis:entry colname="col6">0.29</oasis:entry>
         <oasis:entry colname="col7">[<inline-formula><mml:math id="M206" display="inline"><mml:mrow><mml:mn mathvariant="normal">1</mml:mn><mml:mo>,</mml:mo><mml:mn mathvariant="normal">3.8</mml:mn></mml:mrow></mml:math></inline-formula>]</oasis:entry>
         <oasis:entry colname="col8">0.44</oasis:entry>
       </oasis:row>
     </oasis:tbody>
   </oasis:tgroup></oasis:table></table-wrap>

      <p id="d2e4684">The epistemic uncertainty is represented by <inline-formula><mml:math id="M207" display="inline"><mml:mn mathvariant="normal">13</mml:mn></mml:math></inline-formula> random variables <inline-formula><mml:math id="M208" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, listed in Table <xref ref-type="table" rid="T1"/>. They are modeled by beta distributions and incorporated through a second-level Monte Carlo analysis with <inline-formula><mml:math id="M209" display="inline"><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mrow><mml:msub><mml:mi mathvariant="normal">MC</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub></mml:mrow></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">200</mml:mn></mml:mrow></mml:math></inline-formula> samples. For each quasi-random realization of <inline-formula><mml:math id="M210" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, the first-level analysis is performed. The expected damage over all simulation runs is estimated as:</p>
      <p id="d2e4738">
            <disp-formula id="Ch1.E14" content-type="numbered"><label>14</label><mml:math id="M211" display="block"><mml:mtable class="split" rowspacing="0.2ex" displaystyle="true" columnalign="right left"><mml:mtr><mml:mtd><mml:mrow><mml:msub><mml:mi mathvariant="double-struck">E</mml:mi><mml:mi mathvariant="bold">X</mml:mi></mml:msub><mml:mo>[</mml:mo><mml:mi mathvariant="script">Y</mml:mi><mml:mo>(</mml:mo><mml:mi mathvariant="bold">X</mml:mi><mml:mo>)</mml:mo><mml:mo>]</mml:mo></mml:mrow></mml:mtd><mml:mtd><mml:mrow><mml:mo>=</mml:mo><mml:msub><mml:mi mathvariant="double-struck">E</mml:mi><mml:mrow><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub></mml:mrow></mml:msub><mml:mfenced close="]" open="["><mml:mrow><mml:msub><mml:mi mathvariant="script">Y</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>)</mml:mo></mml:mrow></mml:mfenced></mml:mrow></mml:mtd></mml:mtr><mml:mtr><mml:mtd/><mml:mtd><mml:mrow><mml:mo>≈</mml:mo><mml:mstyle displaystyle="true"><mml:mfrac style="display"><mml:mn mathvariant="normal">1</mml:mn><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mrow><mml:msub><mml:mi mathvariant="normal">MC</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub></mml:mrow></mml:msub></mml:mrow></mml:mfrac></mml:mstyle><mml:munderover><mml:mo movablelimits="false">∑</mml:mo><mml:mrow><mml:mi>k</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mrow><mml:msub><mml:mi mathvariant="normal">MC</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub></mml:mrow></mml:msub></mml:mrow></mml:munderover><mml:msub><mml:mi mathvariant="script">Y</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mfenced open="(" close=")"><mml:mrow><mml:msubsup><mml:mi mathvariant="bold">x</mml:mi><mml:mi mathvariant="normal">e</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi>k</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:msubsup></mml:mrow></mml:mfenced><mml:mo>.</mml:mo></mml:mrow></mml:mtd></mml:mtr></mml:mtable></mml:math></disp-formula></p>
      <p id="d2e4857">The separation of aleatory and epistemic uncertainties is described in more detail in <xref ref-type="bibr" rid="bib1.bibx43" id="text.81"/>.</p>
</sec>
<sec id="Ch1.S4.SS2">
  <label>4.2</label><title>Risk and benefit estimation</title>
      <p id="d2e4872">Ultimately, the flood risk model is developed to quantify the expected benefit of implementing individual or combined mitigation measures. The risk reduction associated with a measure <inline-formula><mml:math id="M212" display="inline"><mml:mi>M</mml:mi></mml:math></inline-formula> is defined as

            <disp-formula id="Ch1.E15" content-type="numbered"><label>15</label><mml:math id="M213" display="block"><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>r</mml:mi><mml:mo>(</mml:mo><mml:msub><mml:mi>a</mml:mi><mml:mi>M</mml:mi></mml:msub><mml:mo>)</mml:mo><mml:mo>=</mml:mo><mml:mi>r</mml:mi><mml:mo>(</mml:mo><mml:msub><mml:mi>a</mml:mi><mml:mn mathvariant="normal">0</mml:mn></mml:msub><mml:mo>)</mml:mo><mml:mo>-</mml:mo><mml:mi>r</mml:mi><mml:mo>(</mml:mo><mml:msub><mml:mi>a</mml:mi><mml:mi>M</mml:mi></mml:msub><mml:mo>)</mml:mo></mml:mrow></mml:math></disp-formula>

          where <inline-formula><mml:math id="M214" display="inline"><mml:mi>a</mml:mi></mml:math></inline-formula> denotes a decision variable: <inline-formula><mml:math id="M215" display="inline"><mml:mrow><mml:msub><mml:mi>a</mml:mi><mml:mn mathvariant="normal">0</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula> represents the baseline scenario without additional mitigation, and <inline-formula><mml:math id="M216" display="inline"><mml:mrow><mml:msub><mml:mi>a</mml:mi><mml:mi>M</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> corresponds to the implementation of measure <inline-formula><mml:math id="M217" display="inline"><mml:mi>M</mml:mi></mml:math></inline-formula>. The annual flood risk under decision <inline-formula><mml:math id="M218" display="inline"><mml:mi>a</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M219" display="inline"><mml:mrow><mml:mi>r</mml:mi><mml:mo>(</mml:mo><mml:mi>a</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula>, is computed as

            <disp-formula id="Ch1.E16" content-type="numbered"><label>16</label><mml:math id="M220" display="block"><mml:mrow><mml:mi>r</mml:mi><mml:mo>(</mml:mo><mml:mi>a</mml:mi><mml:mo>)</mml:mo><mml:mo>=</mml:mo><mml:mi mathvariant="italic">λ</mml:mi><mml:mo>⋅</mml:mo><mml:msub><mml:mi mathvariant="double-struck">E</mml:mi><mml:mi mathvariant="bold">X</mml:mi></mml:msub><mml:mfenced close="]" open="["><mml:mrow><mml:mi mathvariant="script">Y</mml:mi><mml:mo>(</mml:mo><mml:mi mathvariant="bold">X</mml:mi><mml:mo>,</mml:mo><mml:mi>a</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:mfenced><mml:mo>,</mml:mo></mml:mrow></mml:math></disp-formula>

          We reiterate that <inline-formula><mml:math id="M221" display="inline"><mml:mrow><mml:mi mathvariant="italic">λ</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">72</mml:mn><mml:mo>/</mml:mo><mml:mn mathvariant="normal">3500</mml:mn></mml:mrow></mml:math></inline-formula> yr<sup>−1</sup> is the rate of flood events. The benefit <inline-formula><mml:math id="M223" display="inline"><mml:mrow><mml:mi>B</mml:mi><mml:mo>(</mml:mo><mml:msub><mml:mi>a</mml:mi><mml:mi>M</mml:mi></mml:msub><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> is defined as the sum of the discounted annual risk reduction <inline-formula><mml:math id="M224" display="inline"><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>r</mml:mi><mml:mo>(</mml:mo><mml:msub><mml:mi>a</mml:mi><mml:mi>M</mml:mi></mml:msub><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> over the operational lifetime of the measure <inline-formula><mml:math id="M225" display="inline"><mml:mrow><mml:msub><mml:mi>t</mml:mi><mml:mi mathvariant="normal">o</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>

            <disp-formula id="Ch1.E17" content-type="numbered"><label>17</label><mml:math id="M226" display="block"><mml:mrow><mml:mi>B</mml:mi><mml:mo>(</mml:mo><mml:msub><mml:mi>a</mml:mi><mml:mi>M</mml:mi></mml:msub><mml:mo>)</mml:mo><mml:mo>=</mml:mo><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>r</mml:mi><mml:mo>(</mml:mo><mml:msub><mml:mi>a</mml:mi><mml:mi>M</mml:mi></mml:msub><mml:mo>)</mml:mo><mml:mo>⋅</mml:mo><mml:mstyle displaystyle="true"><mml:mfrac style="display"><mml:mrow><mml:mn mathvariant="normal">1</mml:mn><mml:mo>-</mml:mo><mml:mo>(</mml:mo><mml:mn mathvariant="normal">1</mml:mn><mml:mo>+</mml:mo><mml:msub><mml:mi>r</mml:mi><mml:mi mathvariant="normal">d</mml:mi></mml:msub><mml:msup><mml:mo>)</mml:mo><mml:mrow><mml:mo>-</mml:mo><mml:msub><mml:mi>t</mml:mi><mml:mi mathvariant="normal">o</mml:mi></mml:msub></mml:mrow></mml:msup></mml:mrow><mml:mrow><mml:msub><mml:mi>r</mml:mi><mml:mi mathvariant="normal">d</mml:mi></mml:msub></mml:mrow></mml:mfrac></mml:mstyle><mml:mo>,</mml:mo></mml:mrow></mml:math></disp-formula>

          with <inline-formula><mml:math id="M227" display="inline"><mml:mrow><mml:msub><mml:mi>r</mml:mi><mml:mi mathvariant="normal">d</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> the annual discount rate. Based on the damage samples <inline-formula><mml:math id="M228" display="inline"><mml:mrow><mml:mi mathvariant="bold">Y</mml:mi><mml:mo>=</mml:mo><mml:mi mathvariant="script">Y</mml:mi><mml:mo>(</mml:mo><mml:mi mathvariant="bold">X</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> resulting from the MC-based flood simulation, a loss exceedance curve can be derived. Therefore, the samples are ordered based on their damage estimate <inline-formula><mml:math id="M229" display="inline"><mml:mrow><mml:msub><mml:mi>Y</mml:mi><mml:mn mathvariant="normal">1</mml:mn></mml:msub><mml:mo>≥</mml:mo><mml:msub><mml:mi>Y</mml:mi><mml:mn mathvariant="normal">2</mml:mn></mml:msub><mml:mo>≥</mml:mo><mml:mi mathvariant="normal">…</mml:mi><mml:mo>≥</mml:mo><mml:msub><mml:mi>Y</mml:mi><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mrow><mml:msub><mml:mi mathvariant="normal">MC</mml:mi><mml:mi mathvariant="normal">a</mml:mi></mml:msub></mml:mrow></mml:msub></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula>. The exceedance probability of each damage <inline-formula><mml:math id="M230" display="inline"><mml:mrow><mml:msub><mml:mi>Y</mml:mi><mml:mi>i</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> is calculated as

            <disp-formula id="Ch1.E18" content-type="numbered"><label>18</label><mml:math id="M231" display="block"><mml:mrow><mml:mi>P</mml:mi><mml:mo>(</mml:mo><mml:mi>Y</mml:mi><mml:mo>≥</mml:mo><mml:msub><mml:mi>Y</mml:mi><mml:mi>i</mml:mi></mml:msub><mml:mo>)</mml:mo><mml:mo>=</mml:mo><mml:mi>i</mml:mi><mml:mo>⋅</mml:mo><mml:mstyle displaystyle="true"><mml:mfrac style="display"><mml:mn mathvariant="normal">72</mml:mn><mml:mrow><mml:mn mathvariant="normal">3500</mml:mn><mml:mo>⋅</mml:mo><mml:msub><mml:mi>n</mml:mi><mml:mrow><mml:msub><mml:mi mathvariant="normal">MC</mml:mi><mml:mi mathvariant="normal">a</mml:mi></mml:msub></mml:mrow></mml:msub></mml:mrow></mml:mfrac></mml:mstyle></mml:mrow></mml:math></disp-formula>

          This is shown in Fig. <xref ref-type="fig" rid="F12"/> for <inline-formula><mml:math id="M232" display="inline"><mml:mrow><mml:msub><mml:mi>a</mml:mi><mml:mn mathvariant="normal">0</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula>, no measure, and the implementation of the measure under study, <inline-formula><mml:math id="M233" display="inline"><mml:mrow><mml:msub><mml:mi>a</mml:mi><mml:mi>M</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>. The area in between the two curves corresponds to the expected annual risk reduction in Eq. (<xref ref-type="disp-formula" rid="Ch1.E15"/>) <xref ref-type="bibr" rid="bib1.bibx6" id="paren.82"/>. To calculate the benefit-cost ratio of a measure, the benefit <inline-formula><mml:math id="M234" display="inline"><mml:mrow><mml:mi>B</mml:mi><mml:mo>(</mml:mo><mml:msub><mml:mi>a</mml:mi><mml:mi>M</mml:mi></mml:msub><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> is compared against the sum of discounted costs.</p>
</sec>
<sec id="Ch1.S4.SS3">
  <label>4.3</label><title>Sensitivity analysis</title>
      <p id="d2e5353">Sensitivity analysis aims at explaining how variations in model outputs can be attributed to uncertainties in input parameters <xref ref-type="bibr" rid="bib1.bibx37" id="paren.83"/>.  In this study, first-order Sobol' indices are calculated as a byproduct of the uncertainty analysis. They offer insights into the relative importance of parameter uncertainties, calculated as the direct contribution of each input parameter to the output variance

            <disp-formula id="Ch1.E19" content-type="numbered"><label>19</label><mml:math id="M235" display="block"><mml:mrow><mml:msub><mml:mi>S</mml:mi><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mrow><mml:mi mathvariant="normal">e</mml:mi><mml:mo>,</mml:mo><mml:mi>i</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:msub><mml:mo>=</mml:mo><mml:mstyle displaystyle="true"><mml:mfrac style="display"><mml:mrow><mml:mi mathvariant="normal">Var</mml:mi><mml:mo>(</mml:mo><mml:mi mathvariant="double-struck">E</mml:mi><mml:mo>[</mml:mo><mml:msub><mml:mi>Y</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>|</mml:mo><mml:msub><mml:mi>X</mml:mi><mml:mrow><mml:mi mathvariant="normal">e</mml:mi><mml:mo>,</mml:mo><mml:mi>i</mml:mi></mml:mrow></mml:msub><mml:mo>]</mml:mo><mml:mo>)</mml:mo></mml:mrow><mml:mrow><mml:mi mathvariant="normal">Var</mml:mi><mml:mo>(</mml:mo><mml:msub><mml:mi>Y</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>)</mml:mo></mml:mrow></mml:mfrac></mml:mstyle><mml:mo>.</mml:mo></mml:mrow></mml:math></disp-formula>

          Since aleatory uncertainty cannot be reduced, quantifying the sensitivity with respect to all uncertainties <inline-formula><mml:math id="M236" display="inline"><mml:mrow><mml:mi mathvariant="bold">X</mml:mi><mml:mo>=</mml:mo><mml:mo>[</mml:mo><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">a</mml:mi></mml:msub><mml:mo>,</mml:mo><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>]</mml:mo></mml:mrow></mml:math></inline-formula> is not expedient, especially in a decision making context. Therefore, the sensitivity analysis considers as input only the epistemic uncertainties <inline-formula><mml:math id="M237" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> and as output the expected value of <inline-formula><mml:math id="M238" display="inline"><mml:mrow><mml:mi mathvariant="script">Y</mml:mi><mml:mo>(</mml:mo><mml:mi mathvariant="bold">X</mml:mi><mml:mo>,</mml:mo><mml:mi>a</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> with respect to the aleatory uncertainties <inline-formula><mml:math id="M239" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">a</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, <inline-formula><mml:math id="M240" display="inline"><mml:mrow><mml:msub><mml:mi>Y</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:msub><mml:mi mathvariant="script">Y</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:msub><mml:mi mathvariant="bold">x</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula>, estimated in Eq. (<xref ref-type="disp-formula" rid="Ch1.E13"/>). To approximate <inline-formula><mml:math id="M241" display="inline"><mml:mrow><mml:mi mathvariant="double-struck">E</mml:mi><mml:mo>[</mml:mo><mml:msub><mml:mi>Y</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>|</mml:mo><mml:msub><mml:mi>X</mml:mi><mml:mrow><mml:mi mathvariant="normal">e</mml:mi><mml:mo>,</mml:mo><mml:mi>i</mml:mi></mml:mrow></mml:msub><mml:mo>]</mml:mo></mml:mrow></mml:math></inline-formula> the samples are partitioned into five bins of equal width over the range of <inline-formula><mml:math id="M242" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mrow><mml:mi mathvariant="normal">e</mml:mi><mml:mo>,</mml:mo><mml:mi>i</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula>, and the mean of <inline-formula><mml:math id="M243" display="inline"><mml:mrow><mml:msub><mml:mi>Y</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> within each bin is used as an estimate of the conditional expectation. If the absolute influence of parameter uncertainties on a specific decision is of interest, the expected value of partial perfect information (EVPPI) <xref ref-type="bibr" rid="bib1.bibx43" id="paren.84"/> is a more suitable metric. EVPPI quantifies the expected monetary benefit of making an improved decision when perfect information about a specific uncertain input <inline-formula><mml:math id="M244" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> is available. It can be used to assess whether it is worthwhile to invest in reducing uncertainty in a particular input parameter, or to identify which uncertainties should be prioritized in further analysis or data collection.</p>
</sec>
</sec>
<sec id="Ch1.S5">
  <label>5</label><title>Exemplary results</title>
      <p id="d2e5612">In this section, we illustrate selected applications of the developed flood risk model. To this end, it is applied to the Bavarian Danube with the objective of assessing the cost-effectiveness of the controlled detention basin introduced in Sect. <xref ref-type="sec" rid="Ch1.S2"/>. The results of the case study are still confidential due to ongoing work on the climate inputs and the pending publication of the study. Consequently, the preliminary estimates of the detention basin's benefits shown in Fig. <xref ref-type="fig" rid="F13"/> are presented without numerical values. In this study, a total of <inline-formula><mml:math id="M245" display="inline"><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mi mathvariant="normal">MC</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:msub><mml:mi>n</mml:mi><mml:mrow><mml:msub><mml:mi mathvariant="normal">MC</mml:mi><mml:mi mathvariant="normal">a</mml:mi></mml:msub></mml:mrow></mml:msub><mml:mo>⋅</mml:mo><mml:msub><mml:mi>n</mml:mi><mml:mrow><mml:msub><mml:mi mathvariant="normal">MC</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub></mml:mrow></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">3600</mml:mn><mml:mo>⋅</mml:mo><mml:mn mathvariant="normal">200</mml:mn><mml:mo>=</mml:mo><mml:mn mathvariant="normal">720</mml:mn><mml:mspace width="0.125em" linebreak="nobreak"/><mml:mn mathvariant="normal">000</mml:mn></mml:mrow></mml:math></inline-formula> Monte Carlo simulation runs are performed. The samples are used to derive the expected loss exceedance curve of events <inline-formula><mml:math id="M246" display="inline"><mml:mrow><mml:mi>T</mml:mi><mml:mo>&gt;</mml:mo><mml:mn mathvariant="normal">100</mml:mn></mml:mrow></mml:math></inline-formula> years at the Bavarian Danube, shown in blue in Fig. <xref ref-type="fig" rid="F11"/>. The sampling process follows the 2-level framework outlined in Sect. <xref ref-type="sec" rid="Ch1.S4.SS1"/>, that enables the distinction between the influence of aleatory and epistemic uncertainties. The impact of epistemic uncertainties is represented by the shaded areas in Fig. <xref ref-type="fig" rid="F11"/>, which correspond to the 90 % quantile. Five loss exceedance curves, selected randomly from the <inline-formula><mml:math id="M247" display="inline"><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mi mathvariant="normal">E</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">200</mml:mn></mml:mrow></mml:math></inline-formula> second-order simulation runs, are depicted in black to illustrate the effect of epistemic model uncertainties. As apparent from Fig. <xref ref-type="fig" rid="F11"/>, the influence of model uncertainties is more pronounced for larger, less frequent damage events.</p>

      <fig id="F11"><label>Figure 11</label><caption><p id="d2e5706">Loss exceedance curve for events with <inline-formula><mml:math id="M248" display="inline"><mml:mrow><mml:mi>T</mml:mi><mml:mo>&gt;</mml:mo><mml:mn mathvariant="normal">100</mml:mn></mml:mrow></mml:math></inline-formula> at at least one location at Bavarian Danube. Mean (blue), 90 % quantile (grey) and five randomly selected loss exceedance curves given fixed epistemic parameters.</p></caption>
        <graphic xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026-f11.png"/>

      </fig>

      <p id="d2e5727">The developed flood risk model is further applied to quantify the flood risk reduction potential <inline-formula><mml:math id="M249" display="inline"><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>r</mml:mi><mml:mo>(</mml:mo><mml:msub><mml:mi>a</mml:mi><mml:mi>M</mml:mi></mml:msub><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> of a controlled detention basin located near Riedensheim at the Bavarian Danube, introduced in Sect. <xref ref-type="sec" rid="Ch1.S2"/>. For this purpose, the preliminary loss exceedance curve given events with <inline-formula><mml:math id="M250" display="inline"><mml:mrow><mml:mi>T</mml:mi><mml:mo>&gt;</mml:mo><mml:mn mathvariant="normal">100</mml:mn></mml:mrow></mml:math></inline-formula> years is derived with (blue) and without (red) the detention basin, shown in Fig. <xref ref-type="fig" rid="F12"/>. As outlined in Sect. <xref ref-type="sec" rid="Ch1.S4.SS2"/>, the annual risk reduction is equivalent to the area between the two loss exceedance curves. We note that the uncertainties in the loss exceedance curves are large relative to the difference in the mean estimates. However, the two curves are highly correlated, because most uncertainties affect the damages with and without the measure in the same way. Due to this correlation, the uncertainty in the risk reduction (the benefit of the measure), also depicted in Fig. <xref ref-type="fig" rid="F13"/>, is much smaller than might be expected by looking at Fig. <xref ref-type="fig" rid="F11"/>. The coefficient of variation of the risk reduction is 25 %.</p>

      <fig id="F12"><label>Figure 12</label><caption><p id="d2e5775">Loss exceedance curve for events with <inline-formula><mml:math id="M251" display="inline"><mml:mrow><mml:mi>T</mml:mi><mml:mo>&gt;</mml:mo><mml:mn mathvariant="normal">100</mml:mn></mml:mrow></mml:math></inline-formula> at at least one location at Bavarian Danube with (blue) and without (red) mitigation measure. Respective 90 % quantile shown as shaded area.</p></caption>
        <graphic xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026-f12.png"/>

      </fig>

      <fig id="F13"><label>Figure 13</label><caption><p id="d2e5798">Probability distribution (PDF) of benefit <inline-formula><mml:math id="M252" display="inline"><mml:mrow><mml:mi>B</mml:mi><mml:mo>(</mml:mo><mml:msub><mml:mi>a</mml:mi><mml:mi>M</mml:mi></mml:msub><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> at the Bavarian Danube achieved by the detention basin. The blue PDF corresponds to the assumption of a constant climate, the red PDF to a linear increase in flood frequency until 2120 by a factor <inline-formula><mml:math id="M253" display="inline"><mml:mrow><mml:mi mathvariant="italic">γ</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">2</mml:mn></mml:mrow></mml:math></inline-formula> and the yellow PDF to an flood frequency increase by a factor of <inline-formula><mml:math id="M254" display="inline"><mml:mrow><mml:mi mathvariant="italic">γ</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">3</mml:mn></mml:mrow></mml:math></inline-formula>. No numbers are shown on the <inline-formula><mml:math id="M255" display="inline"><mml:mi>x</mml:mi></mml:math></inline-formula>-axis due to confidentiality of the results.</p></caption>
        <graphic xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026-f13.png"/>

      </fig>

      <p id="d2e5855">Kernel-smoothing is applied to estimate the probability density function (PDF) of the benefit <inline-formula><mml:math id="M256" display="inline"><mml:mrow><mml:mi>B</mml:mi><mml:mo>(</mml:mo><mml:msub><mml:mi>a</mml:mi><mml:mi>M</mml:mi></mml:msub><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> (discounted total risk reduction), which is depicted in blue in Fig. <xref ref-type="fig" rid="F13"/>. No numerical values are provided as the results are preliminary. To incorporate these results into a benefit-cost analysis, the expected annual flood risk reduction over the projected lifetime of the measure is discounted relative to the reference year, summed, and compared to the discounted costs of the measure, as described in Sect. <xref ref-type="sec" rid="Ch1.S4.SS2"/>. Analogously, multiple mitigation measures can be incorporated into the model, allowing for comparison of the benefits of different combinations.</p>
      <p id="d2e5879">A total of 13 epistemic uncertainties are incorporated into the uncertainty analysis; their parameterizations are summarized in Table <xref ref-type="table" rid="T1"/>. While covering key sources, this selection is not exhaustive, as it is not feasible to represent all potential epistemic uncertainties. The selected uncertainties are represented either directly (I), or via additive (A) or multiplicative (M) factors. In the case of the fragility function, the parameterized factor is used to interpolate between the lower and upper uncertainty bounds shown in Fig. <xref ref-type="fig" rid="F5"/>. All factors are modeled using beta distributions, as illustrated in Fig. <xref ref-type="fig" rid="F14"/>. The annual risk with respect to the aleatory uncertainties, <inline-formula><mml:math id="M257" display="inline"><mml:mrow><mml:mi mathvariant="italic">λ</mml:mi><mml:mo>⋅</mml:mo><mml:msub><mml:mi mathvariant="double-struck">E</mml:mi><mml:mrow><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">a</mml:mi></mml:msub><mml:mo>|</mml:mo><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:msub><mml:mi mathvariant="bold">x</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub></mml:mrow></mml:msub><mml:mo>[</mml:mo><mml:mi mathvariant="script">Y</mml:mi><mml:mo>(</mml:mo><mml:mo>[</mml:mo><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:msub><mml:mi mathvariant="bold">x</mml:mi><mml:mi mathvariant="normal">e</mml:mi></mml:msub><mml:mo>,</mml:mo><mml:msub><mml:mi mathvariant="bold">X</mml:mi><mml:mi mathvariant="normal">a</mml:mi></mml:msub><mml:mo>]</mml:mo><mml:mo>)</mml:mo><mml:mo>]</mml:mo></mml:mrow></mml:math></inline-formula>, are plotted against the sampled factor values <inline-formula><mml:math id="M258" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mi>i</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:msub><mml:mi>x</mml:mi><mml:mi>i</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> in the same Figure. The substantial influence of the indirect damage factor on the annual risk is clearly evident. Additionally, a formal variance-based sensitivity analysis is conducted, and the first-order Sobol' indices are provided in Table <xref ref-type="table" rid="T1"/>.</p>

      <fig id="F14" specific-use="star"><label>Figure 14</label><caption><p id="d2e5979">Scatter plot of the influence of considered epistemic uncertain parameters on the annual risk, a fitted 1D linear regression <inline-formula><mml:math id="M259" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="script">S</mml:mi><mml:mi>i</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, and assigned underlying beta distribution of <inline-formula><mml:math id="M260" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mi>i</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>.</p></caption>
        <graphic xlink:href="https://nhess.copernicus.org/articles/26/4549/2026/nhess-26-4549-2026-f14.png"/>

      </fig>

      <p id="d2e6011">The results of the sensitivity analysis suggest that the uncertainty of parameters entering the damage module (<inline-formula><mml:math id="M261" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mn mathvariant="normal">10</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula>–<inline-formula><mml:math id="M262" display="inline"><mml:mrow><mml:msub><mml:mi>X</mml:mi><mml:mn mathvariant="normal">13</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula>) has the greatest impact on the annual flood risk. This finding supports the conclusions of <xref ref-type="bibr" rid="bib1.bibx4" id="text.85"/>, who noticed that the choice of the flood damage model has a more significant impact on the flood risk estimate than the parameters within the other flood process models, emphasizing the need for further development of the damage module. Furthermore, the uncertainty in the damage estimates for river sections appears to dominate those for dike segments, suggesting the need for further examination and development of this part of the model. The uncertainties inherent in the hydrological load module are not incorporated in this uncertainty analysis. To assess the impact of a possible climate-change-based increase in flood frequency on the risk reduction potential of the measure, an empirical scenario analysis is conducted. The occurrence rate of a flood <inline-formula><mml:math id="M263" display="inline"><mml:mrow><mml:mi mathvariant="italic">λ</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">72</mml:mn><mml:mo>/</mml:mo><mml:mn mathvariant="normal">3500</mml:mn></mml:mrow></mml:math></inline-formula> yr<sup>−1</sup> is linearly increased until the year 2120 by a factor <inline-formula><mml:math id="M265" display="inline"><mml:mi mathvariant="italic">γ</mml:mi></mml:math></inline-formula>, such that the updated, time-dependent occurrence rate is calculated as

          <disp-formula id="Ch1.E20" content-type="numbered"><label>20</label><mml:math id="M266" display="block"><mml:mrow><mml:msub><mml:mover accent="true"><mml:mi mathvariant="italic">λ</mml:mi><mml:mo stretchy="false" mathvariant="normal">^</mml:mo></mml:mover><mml:mi mathvariant="italic">γ</mml:mi></mml:msub><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mo>=</mml:mo><mml:mstyle displaystyle="true"><mml:mfrac style="display"><mml:mrow><mml:mi mathvariant="italic">γ</mml:mi><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow><mml:mrow><mml:msub><mml:mi>t</mml:mi><mml:mi mathvariant="normal">o</mml:mi></mml:msub></mml:mrow></mml:mfrac></mml:mstyle><mml:mo>⋅</mml:mo><mml:mi>t</mml:mi><mml:mo>⋅</mml:mo><mml:mi mathvariant="italic">λ</mml:mi><mml:mo>+</mml:mo><mml:mi mathvariant="italic">λ</mml:mi><mml:mspace width="1em" linebreak="nobreak"/><mml:mi mathvariant="normal">for</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi>t</mml:mi><mml:mo>∈</mml:mo><mml:mo>[</mml:mo><mml:mn mathvariant="normal">0</mml:mn><mml:mo>,</mml:mo><mml:msub><mml:mi>t</mml:mi><mml:mi mathvariant="normal">o</mml:mi></mml:msub><mml:mo>]</mml:mo></mml:mrow></mml:math></disp-formula>

        The influence of <inline-formula><mml:math id="M267" display="inline"><mml:mi mathvariant="italic">γ</mml:mi></mml:math></inline-formula> on the distribution of annual flood risk reduction is illustrated in Fig. <xref ref-type="fig" rid="F13"/> for the two scenarios <inline-formula><mml:math id="M268" display="inline"><mml:mrow><mml:mi mathvariant="italic">γ</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">2</mml:mn></mml:mrow></mml:math></inline-formula> and <inline-formula><mml:math id="M269" display="inline"><mml:mrow><mml:mi mathvariant="italic">γ</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">3</mml:mn></mml:mrow></mml:math></inline-formula>. An increased flood occurrence rate leads to larger expected flood risk reduction, and consequently higher benefit of the detention basin; however, it also results in increased uncertainty.</p>
</sec>
<sec id="Ch1.S6" sec-type="conclusions">
  <label>6</label><title>Concluding remarks</title>
      <p id="d2e6189">This work proposes a flood risk model to enable large-scale uncertainty-aware flood risk assessments for decision support on mitigation measures. The model is computationally efficient because it makes use of the results of different climatic, hydrodynamic and hydraulic simulations conducted in a pre-processing step. As a result, it does not depend on computationally intensive simulations during run time. A key element enabling this independence is the developed flood routing method, along with segment-specific lookup tables that store the relationships between inundation elevation, floodwater volume, and damages. This computational efficiency allows the model to be integrated into a two-level Monte Carlo framework for uncertainty quantification. Within this framework, different types of uncertainty – aleatory and epistemic – are treated separately. This separation allows for the isolated examination of epistemic uncertainties, helping to understand the influence of various model uncertainties and make targeted improvements. Furthermore, the separation ensures that the estimated benefits of mitigation measures remain robust across a wide range of possible flood events and failure scenarios. Especially in the context of natural hazards like floods, which are characterized by high aleatory uncertainty, it is essential to quantify, communicate, and incorporate this uncertainty into the decision-making process.</p>
      <p id="d2e6192">The literature review in Sect. <xref ref-type="sec" rid="Ch1.S1"/> highlighted the inherent trade-offs in flood risk models between process representation, spatial coverage, and the integration within uncertainty analyses. The developed model enables both large-scale flood risk and benefit assessments as well as detailed uncertainty analyses. However, a compromise is made through simplifications that are necessary to allow pre-processing of parts of the model, which reduces the model’s accuracy locally. Nevertheless, results of module verification and the uncertainty analysis suggest that the effect of these inaccuracies remains within an acceptable range, in particular when considering mitigation measures that act globally, such as flood detention basins. Notably, the results of the sensitivity analysis indicate that the annual flood risk is highly sensitive to the uncertainty in the damage module, such that future improvements should focus on components of the damage module. As long as the current uncertainties in damage estimation prevail, investments towards improving the other components of the flood risk model seem to be unjustified.</p>
      <p id="d2e6197">The flood risk model is applied to the 380 km of Bavarian Danube in Germany to assess the potential risk reduction of mitigation measures. Computational time scales approximately linearly with the number of dike segments; an extension of the model to the entire Danube, which spans roughly 2850 km across ten countries, is thus expected to increase runtime by no more than a factor of ten. On this basis, we argue that the model can be applied in large-scale studies and support increasing system thinking. More critical for large cross-border applications are the pre-processing steps, which entail acquiring the necessary data, models and large-scale simulation outputs from multiple stakeholders. We acknowledge that this can be challenging in practice, but this challenge will be faced by any modeling approach. The extent to which uncertainties propagate and accumulate downstream over such long river stretches would require careful examination. Applying the model to an entirely new study area follows a similar process, provided that region-specific climatic, hydrological, and hydraulic simulation models are available. The pre-processing steps are repeated to capture relevant regional characteristics.</p>
      <p id="d2e6200">To further support system thinking, the model can be extended to include the entire catchment, rather than representing only the main river. Although tributary contributions are accounted for in the flood scenarios, potential protection failures, local mitigation measures, and other dynamic effects along tributaries are not explicitly modeled; this limitation should be addressed in future work. Explicitly modeling tributaries in the same manner as the main river is straightforward and, if implemented with efficient parallelization, would not substantially increase computational cost. Such an extension would enable catchment-wide optimization of mitigation measures and improve the accuracy of risk estimates.</p>
      <p id="d2e6204">A further limitation of the model is due to the hydrological simulation of catchment runoff, which is performed during pre-processing in the hydrological load module. While the implemented design choice permits short run times of the main flood simulation module, it does not allow the assessment of interventions influencing the hydrological flood-forming processes. Consequently, many nature-based solutions cannot be evaluated using the present model implementation.</p>
      <p id="d2e6207">In contrast to process-based approaches <xref ref-type="bibr" rid="bib1.bibx39" id="paren.86"/>, flood dynamics are not explicitly represented in the model. Consequently, parameters such as flow velocity and inundation duration are not accounted for in the damage estimation, which limits predictive accuracy and introduces additional uncertainty. However, these uncertainties are implicitly captured within the 2-level framework. For applications to mitigation measures that act locally, the modular structure of the framework allows the integration of high-resolution 2D hydraulic simulations and more detailed damage models for the affected areas.</p>
      <p id="d2e6213">Notwithstanding its limitations, the developed model provides a solid foundation for decision-making, such as in benefit-cost analyses. We argue that the proper assessment of the uncertainty, which is enabled by the developed model, is more important for decision-making than the limitations required to enable this assessment. The practicality of the model is demonstrated in a real-world   application to flood mitigation at the Bavarian Danube. Therein, the benefit of a flood mitigation measure, along with its associated uncertainties, is quantified. In the future, the model can support assessments of various mitigation strategies, help identify high-risk areas, or optimize the combination of mitigation measures. In this way, we demonstrate how dynamic, probabilistic, and integrated flood risk management can be implemented in practice. We hope that our work encourages and supports decision-makers in moving toward a more holistic approach to flood risk management.</p>
</sec>

      
      </body>
    <back><notes notes-type="codeavailability"><title>Code availability</title>

      <p id="d2e6220">The main code of the flood simulation model is available at <uri>https://github.com/mara-tum/flood-risk-model.git</uri> (last access: 22 September 2026; <ext-link xlink:href="https://doi.org/10.5281/zenodo.22709790" ext-link-type="DOI">10.5281/zenodo.22709790</ext-link>, <xref ref-type="bibr" rid="bib1.bibx38" id="altparen.87"/>).</p>
  </notes><notes notes-type="dataavailability"><title>Data availability</title>

      <p id="d2e6235">The data used in this study are provided by Bayerisches Landesamt für Umwelt (LfU) and cannot be published.</p>
  </notes><notes notes-type="authorcontribution"><title>Author contributions</title>

      <p id="d2e6241">All authors contributed to the conceptual design of the model. The model was developed mainly by MR, with input from AH, under the guidance of DS. MR performed the numerical investigations, AH prepared most of the data input. MR wrote the manuscript, AH and DS revised it.</p>
  </notes><notes notes-type="competinginterests"><title>Competing interests</title>

      <p id="d2e6247">The contact author has declared that none of the authors has any competing interests.</p>
  </notes><notes notes-type="disclaimer"><title>Disclaimer</title>

      <p id="d2e6253">Publisher's note: Copernicus Publications remains neutral with regard to jurisdictional claims made in the text, published maps, institutional affiliations, or any other geographical representation in this paper. The authors bear the ultimate responsibility for providing appropriate place names. Views expressed in the text are those of the authors and do not necessarily reflect the views of the publisher.</p>
  </notes><ack><title>Acknowledgements</title><p id="d2e6259">We thank Bayerisches Landesamt für Umwelt (LfU) and Bayerisches Staatsministerium für Umwelt und Verbraucherschutz (StMUV) for the fruitful discussions. The LfU also provided the discharge inputs of the flood scenarios used in the case study.</p></ack><notes notes-type="reviewstatement"><title>Review statement</title>

      <p id="d2e6264">This paper was edited by Mihai Niculita and reviewed by Heiko Apel and Francesca Pianosi.</p>
  </notes><ref-list>
    <title>References</title>

      <ref id="bib1.bibx1"><label>Apel et al.(2004)</label><mixed-citation>Apel, H., Thieken, A. H., Merz, B., and Blöschl, G.: Flood risk assessment and associated uncertainty, Nat. Hazards Earth Syst. Sci., 4, 295–308, <ext-link xlink:href="https://doi.org/10.5194/nhess-4-295-2004" ext-link-type="DOI">10.5194/nhess-4-295-2004</ext-link>, 2004.</mixed-citation></ref>
      <ref id="bib1.bibx2"><label>Apel et al.(2006)</label><mixed-citation>Apel, H., Thieken, A. H., Merz, B., and Blöschl, G.: A Probabilistic Modelling System for Assessing Flood Risks, Nat. Hazards, 38, 79–100, <ext-link xlink:href="https://doi.org/10.1007/s11069-005-8603-7" ext-link-type="DOI">10.1007/s11069-005-8603-7</ext-link>, 2006.</mixed-citation></ref>
      <ref id="bib1.bibx3"><label>Apel et al.(2008)</label><mixed-citation>Apel, H., Merz, B., and Thieken, A. H.: Quantification of uncertainties in flood risk assessments, Intl. J. River Basin Management, 6, 149–162, <ext-link xlink:href="https://doi.org/10.1080/15715124.2008.9635344" ext-link-type="DOI">10.1080/15715124.2008.9635344</ext-link>, 2008.</mixed-citation></ref>
      <ref id="bib1.bibx4"><label>Apel et al.(2009a)</label><mixed-citation>Apel, H., Aronica, G. T., Kreibich, H., and Thieken, A. H.: Flood risk analyses – how detailed do we need to be?, Nat. Hazards, 49, 79–98, <ext-link xlink:href="https://doi.org/10.1007/s11069-008-9277-8" ext-link-type="DOI">10.1007/s11069-008-9277-8</ext-link>, 2009a.</mixed-citation></ref>
      <ref id="bib1.bibx5"><label>Apel et al.(2009b)</label><mixed-citation>Apel, H., Merz, B., and Thieken, A.: Influence of dike breaches on flood frequency estimation, Comput. Geosci., 35, 907–923, <ext-link xlink:href="https://doi.org/10.1016/j.cageo.2007.11.003" ext-link-type="DOI">10.1016/j.cageo.2007.11.003</ext-link>, 2009b.</mixed-citation></ref>
      <ref id="bib1.bibx6"><label>Arnel(1989)</label><mixed-citation>Arnel, N. W.: Expected Annual Damages and Uncertainties in Flood Frequency Estimation, Water Resources Planning and Management, 115, 94–107, <ext-link xlink:href="https://doi.org/10.1061/(ASCE)0733-9496(1989)115:1(94)" ext-link-type="DOI">10.1061/(ASCE)0733-9496(1989)115:1(94)</ext-link>, 1989.</mixed-citation></ref>
      <ref id="bib1.bibx7"><label>Bremicker(2000)</label><mixed-citation>Bremicker, M.: Das Wasserhaushaltsmodell LARSIM – Modellgrundlagen und Anwendungsbeispiele, Freiburger Schriften zur Hydrologie, Institut für Hydrologie der Universität Freiburg i. Br., Freiburg i. Br., Germany, <uri>https://www.hydrology.uni-freiburg.de/publika/FSH-Bd11-Bremicker.pdf</uri> (last access: 22 September 2026), 2000.</mixed-citation></ref>
      <ref id="bib1.bibx8"><label>Carrera et al.(2014)</label><mixed-citation>Carrera, L., Standari, G., Bosello, F., and Mysiak, J.: Assessing Direct and Indirect Economic Impacts of a Flood Event Through the Integration of Spatial and Computational General Equilibrium Modelling, Environ. Model. Softw., 63, 109–122, <uri>https://www.jstor.org/stable/resrep01092</uri> (last access: 17 August 2026), 2014.</mixed-citation></ref>
      <ref id="bib1.bibx9"><label>Curran et al.(2019)</label><mixed-citation>Curran, A., de Bruijn, K., Klerk, W., and Kok, M.: Large Scale Flood Hazard Analysis by Including Defence Failures on the Dutch River System, Water, 11, 1732, <ext-link xlink:href="https://doi.org/10.3390/w11081732" ext-link-type="DOI">10.3390/w11081732</ext-link>, 2019.</mixed-citation></ref>
      <ref id="bib1.bibx10"><label>Curran et al.(2020)</label><mixed-citation>Curran, A., de Bruijn, K., Domeneghetti, A., Bianchi, F., Kok, M., Vorogushyn, S., and Castellarin, A.: Large-scale stochastic flood hazard analysis applied to the Po River, Nat. Hazards, 104, 2027–2049, <ext-link xlink:href="https://doi.org/10.1007/s11069-020-04260-w" ext-link-type="DOI">10.1007/s11069-020-04260-w</ext-link>, 2020.</mixed-citation></ref>
      <ref id="bib1.bibx11"><label>CUR/TAW(1990)</label><mixed-citation> CUR/TAW: Probabilistic design of flood defences. Report 141., Technical Advisory Committee on Water Defences, Center for Civil Engineering Research and Codes, Gouda, the Netherlands, ISBN 978-9037600001, 1990.</mixed-citation></ref>
      <ref id="bib1.bibx12"><label>de Bruijn et al.(2015)</label><mixed-citation>de Bruijn, K., Wagenaar, D., Slager, K., de Bel, M., and Burzel, A.: Updated and improved method for flood damage assessment: SSM2015 (version 2), Tech.  rep., Deltares, Delft, <uri>https://open.rijkswaterstaat.nl/@273917/updated-and-improved-method-for-flood/</uri> (last access: 22 September 2026), 2015.</mixed-citation></ref>
      <ref id="bib1.bibx13"><label>de Kok and Grossmann(2010)</label><mixed-citation>de Kok, J.-L. and Grossmann, M.: Large-scale assessment of flood risk and the effects of mitigation measures along the Elbe River, Nat. Hazards, 52, 143–166, <ext-link xlink:href="https://doi.org/10.1007/s11069-009-9363-6" ext-link-type="DOI">10.1007/s11069-009-9363-6</ext-link>, 2010.</mixed-citation></ref>
      <ref id="bib1.bibx14"><label>Deltares(2018)</label><mixed-citation>Deltares: SOBEK. Hydrodynamics, Rainfall Runoff and Realtime Control, User Manual, Tech. rep., Delft, <uri>https://content.oss.deltares.nl/sobek2/SOBEK_User_Manual.pdf</uri> (last access: 22 September 2026), 2018.</mixed-citation></ref>
      <ref id="bib1.bibx15"><label>de Moel et al.(2015)</label><mixed-citation>de Moel, H., Jongman, B., Kreibich, H., Merz, B., Penning-Rowsell, E., and Ward, P. J.: Flood risk assessments at different spatial scales, Mitig. Adapt. Strat. Gl., 20, 865–890, <ext-link xlink:href="https://doi.org/10.1007/s11027-015-9654-z" ext-link-type="DOI">10.1007/s11027-015-9654-z</ext-link>, 2015.</mixed-citation></ref>
      <ref id="bib1.bibx16"><label>Domeneghetti et al.(2013)</label><mixed-citation>Domeneghetti, A., Vorogushyn, S., Castellarin, A., Merz, B., and Brath, A.: Probabilistic flood hazard mapping: effects of uncertain boundary conditions, Hydrol. Earth Syst. Sci., 17, 3127–3140, <ext-link xlink:href="https://doi.org/10.5194/hess-17-3127-2013" ext-link-type="DOI">10.5194/hess-17-3127-2013</ext-link>, 2013.</mixed-citation></ref>
      <ref id="bib1.bibx17"><label>Förster et al.(2005)</label><mixed-citation>Förster, S., Kneis, D., Gocht, M., and Bronstert, A.: Flood risk reduction by the use of retention areas at the Elbe River, International Journal of River Basin Management, 3, 21–29, <ext-link xlink:href="https://doi.org/10.1080/15715124.2005.9635242" ext-link-type="DOI">10.1080/15715124.2005.9635242</ext-link>, 2005.</mixed-citation></ref>
      <ref id="bib1.bibx18"><label>Gamper et al.(2006)</label><mixed-citation>Gamper, C. D., Thöni, M., and Weck-Hannemann, H.: A conceptual approach to the use of Cost Benefit and Multi Criteria Analysis in natural hazard management, Nat. Hazards Earth Syst. Sci., 6, 293–302, <ext-link xlink:href="https://doi.org/10.5194/nhess-6-293-2006" ext-link-type="DOI">10.5194/nhess-6-293-2006</ext-link>, 2006.</mixed-citation></ref>
      <ref id="bib1.bibx19"><label>geomer GmbH and Ruiz Rodriguez + Zeisler + Blank, GbR(2022)</label><mixed-citation>geomer GmbH and Ruiz Rodriguez + Zeisler + Blank, GbR: Bewertung des Hochwasserrisikos auf der Grundlage von Schadenspotenzialen – Anwendung von Schadensfunktionen in repräsentativen Beispielsregionen im Rahmen des Länderfinanzierungsprogramms “Wasser, Boden und Abfall 2020”, Tech. rep., <uri>https://www.laenderfinanzierungsprogramm.de/static/LFP/Dateien/LAWA/Sonstige/H_4.20.21%20Abschlussbericht_SchadenpotentialBEAM_%2814.07.22%29.pdf</uri> (last access: 22 September 2026), 2022.</mixed-citation></ref>
      <ref id="bib1.bibx20"><label>Gouldby et al.(2008)</label><mixed-citation>Gouldby, B., Sayers, P., Mulet-Marti, J., Hassan, M. A. A. M., and Benwell, D.: A methodology for regional-scale flood risk assessment, P. I. Civil Eng.-Wat. M., <ext-link xlink:href="https://doi.org/10.1680/wama.2008.161.3.169" ext-link-type="DOI">10.1680/wama.2008.161.3.169</ext-link>, 2008.</mixed-citation></ref>
      <ref id="bib1.bibx21"><label>Guan et al.(2025)</label><mixed-citation>Guan, X., Nguyen, V. D., Voit, P., Merz, B., Heistermann, M., and Vorogushyn, S.: The ability of a stochastic regional weather generator to reproduce heavy-precipitation events across scales, Nat. Hazards Earth Syst. Sci., 25, 3075–3086, <ext-link xlink:href="https://doi.org/10.5194/nhess-25-3075-2025" ext-link-type="DOI">10.5194/nhess-25-3075-2025</ext-link>, 2025.</mixed-citation></ref>
      <ref id="bib1.bibx22"><label>Hall and Solomatine(2008)</label><mixed-citation>Hall, J. and Solomatine, D.: A framework for uncertainty analysis in flood risk management decisions, International Journal of River Basin Management, 6, 85–98, <ext-link xlink:href="https://doi.org/10.1080/15715124.2008.9635339" ext-link-type="DOI">10.1080/15715124.2008.9635339</ext-link>, 2008.</mixed-citation></ref>
      <ref id="bib1.bibx23"><label>Hall et al.(2003)</label><mixed-citation>Hall, J. W., Dawson, R. J., Sayers, P. B., Rosu, C., Chatterton, J. B., and Deakin, R.: A methodology for national-scale flood risk assessment, P. I. Civil Eng.-Water, 156, 235–247, <ext-link xlink:href="https://doi.org/10.1680/wame.2003.156.3.235" ext-link-type="DOI">10.1680/wame.2003.156.3.235</ext-link>, 2003.</mixed-citation></ref>
      <ref id="bib1.bibx24"><label>IPCC(2013)</label><mixed-citation> IPCC: Summary for Policymakers, in: Climate Change 2013: The Physical Science Basis. Contribution of Working Group I to the Fifth Assessment Report of the Intergovernmental Panel on Climate Change, edited by: Stocker, T. F., Qin, D., Plattner, G.-K., Tignor, M., Allen, S. K., Boschung, J., Nauels, A., Xia, Y., Bex, V., and Midgley, P. M., Cambridge University Press, Cambridge, United Kingdom and New York, USA, ISBN 9789291691388, 2013.</mixed-citation></ref>
      <ref id="bib1.bibx25"><label>Kamrath et al.(2006)</label><mixed-citation>Kamrath, P., Disse, M., Hammer, M., and Köngeter, J.: Assessment of Discharge through a Dike Breach and Simulation of Flood Wave Propagation, Nat. Hazards, 38, 63–78, <ext-link xlink:href="https://doi.org/10.1007/s11069-005-8600-x" ext-link-type="DOI">10.1007/s11069-005-8600-x</ext-link>, 2006.</mixed-citation></ref>
      <ref id="bib1.bibx26"><label>Koks et al.(2015)</label><mixed-citation>Koks, E. E., Bočkarjova, M., de Moel, H., and Aerts, J. C. J. H.: Integrated Direct and Indirect Flood Risk Modeling: Development and Sensitivity Analysis, Risk Anal., 35, 882–900, <ext-link xlink:href="https://doi.org/10.1111/risa.12300" ext-link-type="DOI">10.1111/risa.12300</ext-link>, 2015.</mixed-citation></ref>
      <ref id="bib1.bibx27"><label>Ludwig et al.(2019)</label><mixed-citation> Ludwig, R., Wood, R. R., Willkofer, F., Mittermeier, M., Böhnisch, A., and Poschlod, B.: Klimawandel und Extremereignisse. Risiken und Perspektiven für die Bayerische Wasserwirtschaft, Abschlussbericht, München, Germany, 2019.</mixed-citation></ref>
      <ref id="bib1.bibx28"><label>Merz and Thieken(2009)</label><mixed-citation>Merz, B. and Thieken, A. H.: Flood risk curves and uncertainty bounds, Nat. Hazards, 51, 437–458, <ext-link xlink:href="https://doi.org/10.1007/s11069-009-9452-6" ext-link-type="DOI">10.1007/s11069-009-9452-6</ext-link>, 2009.</mixed-citation></ref>
      <ref id="bib1.bibx29"><label>Merz et al.(2010a)</label><mixed-citation>Merz, B., Hall, J., Disse, M., and Schumann, A.: Fluvial flood risk management in a changing world, Nat. Hazards Earth Syst. Sci., 10, 509–527, <ext-link xlink:href="https://doi.org/10.5194/nhess-10-509-2010" ext-link-type="DOI">10.5194/nhess-10-509-2010</ext-link>, 2010a.</mixed-citation></ref>
      <ref id="bib1.bibx30"><label>Merz et al.(2010b)</label><mixed-citation>Merz, B., Kreibich, H., Schwarze, R., and Thieken, A.: Review article “Assessment of economic flood damage”, Nat. Hazards Earth Syst. Sci., 10, 1697–1724, <ext-link xlink:href="https://doi.org/10.5194/nhess-10-1697-2010" ext-link-type="DOI">10.5194/nhess-10-1697-2010</ext-link>, 2010b.</mixed-citation></ref>
      <ref id="bib1.bibx31"><label>Merz et al.(2024)</label><mixed-citation>Merz, B., Nguyen, D., Guse, B., Kreibich, H., Sairam, N., Apel, H., Farrag, M., Han, L., and Vorogushyn, S.: Kontinuierliche, räumlich verteilte Langzeitsimulation zur Abschätzung des Hochwasserrisikos für Deutschland, Hydrologie &amp; Wasserbewirtschaftung, 68, <ext-link xlink:href="https://doi.org/10.5675/HYWA_2024.4_2" ext-link-type="DOI">10.5675/HYWA_2024.4_2</ext-link>, 2024.</mixed-citation></ref>
      <ref id="bib1.bibx32"><label>Messner et al.(2007)</label><mixed-citation>Messner, F., Penning-Rowsell, E., Green, C., Meyer, V., Tunstall, S., and Veen, A.: Evaluating flood damage: guidance and recommendations on principles and methods, Tech. rep., FLOOD Site Project Report, <uri>https://cepri.info/tl_files/pdf/messnerf2007a.pdf</uri> (last access: 22 September 2026), 2007.</mixed-citation></ref>
      <ref id="bib1.bibx33"><label>Metin et al.(2018)</label><mixed-citation>Metin, A. D., Dung, N. V., Schröter, K., Guse, B., Apel, H., Kreibich, H., Vorogushyn, S., and Merz, B.: How do changes along the risk chain affect flood risk?, Nat. Hazards Earth Syst. Sci., 18, 3089–3108, <ext-link xlink:href="https://doi.org/10.5194/nhess-18-3089-2018" ext-link-type="DOI">10.5194/nhess-18-3089-2018</ext-link>, 2018.</mixed-citation></ref>
      <ref id="bib1.bibx34"><label>Olesen et al.(2017)</label><mixed-citation> Olesen, L., Löwe, R., and Arnbjerb-Nielsen, K.: Flood Damage Assessment. Literature review and recommended procedure, Tech. rep., Cooperative Research Centre for Water Sensitive Cities, Melbourne, Australia, ISBN 978-1-921912-39-9, 2017.</mixed-citation></ref>
      <ref id="bib1.bibx35"><label>Petrow et al.(2006)</label><mixed-citation>Petrow, T., Thieken, A. H., Kreibich, H., Merz, B., and Bahlburg, C. H.: Improvements on Flood Alleviation in Germany: Lessons Learned from the Elbe Flood in August 2002, Environ. Manage., 38, 717–732, <ext-link xlink:href="https://doi.org/10.1007/s00267-005-6291-4" ext-link-type="DOI">10.1007/s00267-005-6291-4</ext-link>, 2006.</mixed-citation></ref>
      <ref id="bib1.bibx36"><label>Pfurtscheller(2014)</label><mixed-citation>Pfurtscheller, C.: Regional economic impacts of natural hazards – the case of the 2005 Alpine flood event in Tyrol (Austria), Nat. Hazards Earth Syst. Sci., 14, 359–378, <ext-link xlink:href="https://doi.org/10.5194/nhess-14-359-2014" ext-link-type="DOI">10.5194/nhess-14-359-2014</ext-link>, 2014.</mixed-citation></ref>
      <ref id="bib1.bibx37"><label>Pianosi et al.(2016)</label><mixed-citation>Pianosi, F., Beven, K., Freer, J., Hall, J. W., Rougier, J., Stephenson, D. B., and Wagener, T.: Sensitivity analysis of environmental models: A systematic review with practical workflow, Environ. Model. Softw., 79, 214–232, <ext-link xlink:href="https://doi.org/10.1016/j.envsoft.2016.02.008" ext-link-type="DOI">10.1016/j.envsoft.2016.02.008</ext-link>, 2016.</mixed-citation></ref>
      <ref id="bib1.bibx38"><label>Ruf(2026)</label><mixed-citation>Ruf, M.: mara-tum/flood-risk-model: flood-risk-model (Version v1.0), Zenodo [code], <ext-link xlink:href="https://doi.org/10.5281/zenodo.22709790" ext-link-type="DOI">10.5281/zenodo.22709790</ext-link>, 2026.</mixed-citation></ref>
      <ref id="bib1.bibx39"><label>Sairam et al.(2021)</label><mixed-citation>Sairam, N., Brill, F., Sieg, T., Farrag, M., Kellermann, P., Nguyen, V. D., Lüdtke, S., Merz, B., Schröter, K., Vorogushyn, S., and Kreibich, H.: Process‐Based Flood Risk Assessment for Germany, Earths Future, 9, e2021EF002259, <ext-link xlink:href="https://doi.org/10.1029/2021EF002259" ext-link-type="DOI">10.1029/2021EF002259</ext-link>, 2021.</mixed-citation></ref>
      <ref id="bib1.bibx40"><label>Schulla and Jasper(2007)</label><mixed-citation>Schulla, J. and Jasper, K.: Model description WaSiM-ETH, Zürich, Switzerland, <uri>https://www.wasim.ch/downloads/doku/wasim/wasim_2007_en.pdf</uri> (last access: 21 September 2026), 2007.</mixed-citation></ref>
      <ref id="bib1.bibx41"><label>Schultz et al.(2010)</label><mixed-citation>Schultz, M. T., Gouldby, B. P., Simm, J. D., and Wibowo, J. L.: Beyond the Factor of Safety: Developing Fragility Curves to Characterize System Reliability, Tech. rep., Defense Technical Information Center, Fort Belvoir, VA, <ext-link xlink:href="https://doi.org/10.21236/ADA525580" ext-link-type="DOI">10.21236/ADA525580</ext-link>, 2010.</mixed-citation></ref>
      <ref id="bib1.bibx42"><label>Sieg et al.(2019)</label><mixed-citation>Sieg, T., Schinko, T., Vogel, K., Mechler, R., Merz, B., and Kreibich, H.: Integrated assessment of short-term direct and indirect economic flood impacts including uncertainty quantification, PLOS ONE, 14, e0212932, <ext-link xlink:href="https://doi.org/10.1371/journal.pone.0212932" ext-link-type="DOI">10.1371/journal.pone.0212932</ext-link>, 2019.</mixed-citation></ref>
      <ref id="bib1.bibx43"><label>Straub et al.(2025)</label><mixed-citation>Straub, D., Betz, W., Ruf, M., Hoffmann, A., Landgraf, A., Friedli, L., and Papaioannou, I.: Sensitivity measures for engineering and environmental decision support, arXiv [preprint], <ext-link xlink:href="https://doi.org/10.48550/arXiv.2507.08488" ext-link-type="DOI">10.48550/arXiv.2507.08488</ext-link>, 2025.</mixed-citation></ref>
      <ref id="bib1.bibx44"><label>Thieken et al.(2016)</label><mixed-citation>Thieken, A. H., Kienzler, S., Kreibich, H., Kuhlicke, C., Kunz, M., Mühr, B., Müller, M., Otto, A., Petrow, T., Pisi, S., and Schröter, K.: Review of the flood risk management system in Germany after the major flood in 2013, Ecol. Soc., 21, 51, <ext-link xlink:href="https://doi.org/10.5751/ES-08547-210251" ext-link-type="DOI">10.5751/ES-08547-210251</ext-link>, 2016.</mixed-citation></ref>
      <ref id="bib1.bibx45"><label>Thomas and Knüppe(2016)</label><mixed-citation>Thomas, F. and Knüppe, K.: From Flood Protection to Flood Risk Management: Insights from the Rhine River in North Rhine-Westphalia, Germany, Water Resour. Manage., 30, 2785–2800, <ext-link xlink:href="https://doi.org/10.1007/s11269-016-1323-9" ext-link-type="DOI">10.1007/s11269-016-1323-9</ext-link>, 2016.</mixed-citation></ref>
      <ref id="bib1.bibx46"><label>USACE(1991)</label><mixed-citation>USACE: Benefit determination involving existing levees. Policy Guide Letter 26, Memorandum for Major Subordinate Commands and District Commands., Tech. rep., U.S. Army Corps of Engineering, <uri>https://upload.wikimedia.org/wikipedia/commons/2/24/Subject-_Policy_guidance_letter_no._26%2C_benefit_determination_involving_existing_levees_-_USACE-p16021coll9-1421.pdf</uri> (last access: 22 September 2026), 1991. </mixed-citation></ref>
      <ref id="bib1.bibx47"><label>Vitale(2023)</label><mixed-citation>Vitale, C.: Understanding the shift toward a risk-based approach in flood risk management, a comparative case study of three Italian rivers, Environ. Sci. Policy, 146, 13–23, <ext-link xlink:href="https://doi.org/10.1016/j.envsci.2023.04.015" ext-link-type="DOI">10.1016/j.envsci.2023.04.015</ext-link>, 2023.</mixed-citation></ref>
      <ref id="bib1.bibx48"><label>Vorogushyn(2008)</label><mixed-citation>Vorogushyn, S.: Analysis of flood hazard under consideration of dike breaches, PhD thesis, Universität Potsdam, <uri>https://publishup.uni-potsdam.de/opus4-ubp/frontdoor/deliver/index/docId/2595/file/vorogushyn_diss.pdf</uri> (last access: 22 September 2026), 2008.</mixed-citation></ref>
      <ref id="bib1.bibx49"><label>Vorogushyn et al.(2010)</label><mixed-citation>Vorogushyn, S., Merz, B., Lindenschmidt, K., and Apel, H.: A new methodology for flood hazard assessment considering dike breaches, Water Resour. Res., 46, 2009WR008475, <ext-link xlink:href="https://doi.org/10.1029/2009WR008475" ext-link-type="DOI">10.1029/2009WR008475</ext-link>, 2010.</mixed-citation></ref>

  </ref-list></back>
    <!--<article-title-html>A fluvial flood risk model for quantifying the benefit of mitigation measures under uncertainty</article-title-html>
<abstract-html/>
<ref-html id="bib1.bib1"><label>Apel et al.(2004)</label><mixed-citation>
      
Apel, H., Thieken, A. H., Merz, B., and Blöschl, G.: Flood risk assessment and associated uncertainty, Nat. Hazards Earth Syst. Sci., 4, 295–308, <a href="https://doi.org/10.5194/nhess-4-295-2004" target="_blank">https://doi.org/10.5194/nhess-4-295-2004</a>, 2004.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib2"><label>Apel et al.(2006)</label><mixed-citation>
      
Apel, H., Thieken, A. H., Merz, B., and Blöschl, G.: A Probabilistic Modelling System for Assessing Flood Risks, Nat. Hazards, 38,
79–100, <a href="https://doi.org/10.1007/s11069-005-8603-7" target="_blank">https://doi.org/10.1007/s11069-005-8603-7</a>, 2006.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib3"><label>Apel et al.(2008)</label><mixed-citation>
      
Apel, H., Merz, B., and Thieken, A. H.: Quantification of uncertainties in flood risk assessments, Intl. J. River Basin Management, 6, 149–162, <a href="https://doi.org/10.1080/15715124.2008.9635344" target="_blank">https://doi.org/10.1080/15715124.2008.9635344</a>, 2008.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib4"><label>Apel et al.(2009a)</label><mixed-citation>
      
Apel, H., Aronica, G. T., Kreibich, H., and Thieken, A. H.: Flood risk analyses – how detailed do we need to be?, Nat. Hazards, 49, 79–98,
<a href="https://doi.org/10.1007/s11069-008-9277-8" target="_blank">https://doi.org/10.1007/s11069-008-9277-8</a>, 2009a.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib5"><label>Apel et al.(2009b)</label><mixed-citation>
      
Apel, H., Merz, B., and Thieken, A.: Influence of dike breaches on flood frequency estimation, Comput. Geosci., 35, 907–923, <a href="https://doi.org/10.1016/j.cageo.2007.11.003" target="_blank">https://doi.org/10.1016/j.cageo.2007.11.003</a>, 2009b.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib6"><label>Arnel(1989)</label><mixed-citation>
      
Arnel, N. W.: Expected Annual Damages and Uncertainties in Flood Frequency Estimation, Water Resources Planning and Management, 115, 94–107, <a href="https://doi.org/10.1061/(ASCE)0733-9496(1989)115:1(94)" target="_blank">https://doi.org/10.1061/(ASCE)0733-9496(1989)115:1(94)</a>, 1989.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib7"><label>Bremicker(2000)</label><mixed-citation>
      
Bremicker, M.: Das Wasserhaushaltsmodell LARSIM – Modellgrundlagen und Anwendungsbeispiele, Freiburger Schriften zur Hydrologie, Institut für Hydrologie der Universität Freiburg i. Br., Freiburg i. Br., Germany, <a href="https://www.hydrology.uni-freiburg.de/publika/FSH-Bd11-Bremicker.pdf" target="_blank"/> (last access: 22 September 2026), 2000.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib8"><label>Carrera et al.(2014)</label><mixed-citation>
      
Carrera, L., Standari, G., Bosello, F., and Mysiak, J.: Assessing Direct and Indirect Economic Impacts of a Flood Event Through the Integration of Spatial and Computational General Equilibrium Modelling, Environ. Model. Softw., 63, 109–122, <a href="https://www.jstor.org/stable/resrep01092" target="_blank"/> (last access: 17 August 2026), 2014.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib9"><label>Curran et al.(2019)</label><mixed-citation>
      
Curran, A., de Bruijn, K., Klerk, W., and Kok, M.: Large Scale Flood Hazard Analysis by Including Defence Failures on the Dutch River System, Water, 11, 1732, <a href="https://doi.org/10.3390/w11081732" target="_blank">https://doi.org/10.3390/w11081732</a>, 2019.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib10"><label>Curran et al.(2020)</label><mixed-citation>
      
Curran, A., de Bruijn, K., Domeneghetti, A., Bianchi, F., Kok, M., Vorogushyn, S., and Castellarin, A.: Large-scale stochastic flood hazard analysis applied to the Po River, Nat. Hazards, 104, 2027–2049,
<a href="https://doi.org/10.1007/s11069-020-04260-w" target="_blank">https://doi.org/10.1007/s11069-020-04260-w</a>, 2020.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib11"><label>CUR/TAW(1990)</label><mixed-citation>
      
CUR/TAW: Probabilistic design of flood defences. Report 141., Technical Advisory Committee on Water Defences, Center for Civil Engineering Research and Codes, Gouda, the Netherlands, ISBN 978-9037600001, 1990.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib12"><label>de Bruijn et al.(2015)</label><mixed-citation>
      
de Bruijn, K., Wagenaar, D., Slager, K., de Bel, M., and Burzel, A.: Updated and improved method for flood damage assessment: SSM2015 (version 2), Tech.  rep., Deltares, Delft, <a href="https://open.rijkswaterstaat.nl/@273917/updated-and-improved-method-for-flood/" target="_blank"/> (last access: 22 September 2026), 2015.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib13"><label>de Kok and Grossmann(2010)</label><mixed-citation>
      
de Kok, J.-L. and Grossmann, M.: Large-scale assessment of flood risk and the
effects of mitigation measures along the Elbe River, Nat. Hazards, 52,
143–166, <a href="https://doi.org/10.1007/s11069-009-9363-6" target="_blank">https://doi.org/10.1007/s11069-009-9363-6</a>, 2010.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib14"><label>Deltares(2018)</label><mixed-citation>
      
Deltares: SOBEK. Hydrodynamics, Rainfall Runoff and Realtime
Control, User Manual, Tech. rep., Delft, <a href="https://content.oss.deltares.nl/sobek2/SOBEK_User_Manual.pdf" target="_blank"/> (last access: 22 September 2026), 2018.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib15"><label>de Moel et al.(2015)</label><mixed-citation>
      
de Moel, H., Jongman, B., Kreibich, H., Merz, B., Penning-Rowsell, E., and Ward, P. J.: Flood risk assessments at different spatial scales, Mitig. Adapt. Strat. Gl., 20, 865–890, <a href="https://doi.org/10.1007/s11027-015-9654-z" target="_blank">https://doi.org/10.1007/s11027-015-9654-z</a>, 2015.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib16"><label>Domeneghetti et al.(2013)</label><mixed-citation>
      
Domeneghetti, A., Vorogushyn, S., Castellarin, A., Merz, B., and Brath, A.: Probabilistic flood hazard mapping: effects of uncertain boundary conditions, Hydrol. Earth Syst. Sci., 17, 3127–3140, <a href="https://doi.org/10.5194/hess-17-3127-2013" target="_blank">https://doi.org/10.5194/hess-17-3127-2013</a>, 2013.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib17"><label>Förster et al.(2005)</label><mixed-citation>
      
Förster, S., Kneis, D., Gocht, M., and Bronstert, A.: Flood risk reduction by the use of retention areas at the Elbe River, International Journal of River Basin Management, 3, 21–29, <a href="https://doi.org/10.1080/15715124.2005.9635242" target="_blank">https://doi.org/10.1080/15715124.2005.9635242</a>, 2005.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib18"><label>Gamper et al.(2006)</label><mixed-citation>
      
Gamper, C. D., Thöni, M., and Weck-Hannemann, H.: A conceptual approach to the use of Cost Benefit and Multi Criteria Analysis in natural hazard management, Nat. Hazards Earth Syst. Sci., 6, 293–302, <a href="https://doi.org/10.5194/nhess-6-293-2006" target="_blank">https://doi.org/10.5194/nhess-6-293-2006</a>, 2006.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib19"><label>geomer GmbH and Ruiz Rodriguez + Zeisler + Blank, GbR(2022)</label><mixed-citation>
      
geomer GmbH and Ruiz Rodriguez + Zeisler + Blank, GbR: Bewertung des Hochwasserrisikos auf der Grundlage von Schadenspotenzialen – Anwendung von Schadensfunktionen in repräsentativen Beispielsregionen im Rahmen des Länderfinanzierungsprogramms “Wasser, Boden und Abfall 2020”, Tech. rep., <a href="https://www.laenderfinanzierungsprogramm.de/static/LFP/Dateien/LAWA/Sonstige/H_4.20.21%20Abschlussbericht_SchadenpotentialBEAM_%2814.07.22%29.pdf" target="_blank"/> (last access: 22 September 2026), 2022.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib20"><label>Gouldby et al.(2008)</label><mixed-citation>
      
Gouldby, B., Sayers, P., Mulet-Marti, J., Hassan, M. A. A. M., and Benwell, D.: A methodology for regional-scale flood risk assessment, P. I. Civil Eng.-Wat. M., <a href="https://doi.org/10.1680/wama.2008.161.3.169" target="_blank">https://doi.org/10.1680/wama.2008.161.3.169</a>, 2008.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib21"><label>Guan et al.(2025)</label><mixed-citation>
      
Guan, X., Nguyen, V. D., Voit, P., Merz, B., Heistermann, M., and Vorogushyn, S.: The ability of a stochastic regional weather generator to reproduce heavy-precipitation events across scales, Nat. Hazards Earth Syst. Sci., 25, 3075–3086, <a href="https://doi.org/10.5194/nhess-25-3075-2025" target="_blank">https://doi.org/10.5194/nhess-25-3075-2025</a>, 2025.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib22"><label>Hall and Solomatine(2008)</label><mixed-citation>
      
Hall, J. and Solomatine, D.: A framework for uncertainty analysis in flood risk management decisions, International Journal of River Basin Management, 6, 85–98, <a href="https://doi.org/10.1080/15715124.2008.9635339" target="_blank">https://doi.org/10.1080/15715124.2008.9635339</a>, 2008.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib23"><label>Hall et al.(2003)</label><mixed-citation>
      
Hall, J. W., Dawson, R. J., Sayers, P. B., Rosu, C., Chatterton, J. B., and Deakin, R.: A methodology for national-scale flood risk assessment, P. I. Civil Eng.-Water, 156, 235–247, <a href="https://doi.org/10.1680/wame.2003.156.3.235" target="_blank">https://doi.org/10.1680/wame.2003.156.3.235</a>, 2003.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib24"><label>IPCC(2013)</label><mixed-citation>
      
IPCC: Summary for Policymakers, in: Climate Change 2013: The Physical Science Basis. Contribution of Working Group I to the Fifth Assessment Report of the Intergovernmental Panel on Climate Change, edited by: Stocker, T. F., Qin, D., Plattner, G.-K., Tignor, M., Allen, S. K., Boschung, J., Nauels, A., Xia, Y., Bex, V., and Midgley, P. M., Cambridge University Press, Cambridge, United Kingdom and New York, USA, ISBN 9789291691388, 2013.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib25"><label>Kamrath et al.(2006)</label><mixed-citation>
      
Kamrath, P., Disse, M., Hammer, M., and Köngeter, J.: Assessment of Discharge through a Dike Breach and Simulation of Flood Wave Propagation, Nat. Hazards, 38, 63–78, <a href="https://doi.org/10.1007/s11069-005-8600-x" target="_blank">https://doi.org/10.1007/s11069-005-8600-x</a>,
2006.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib26"><label>Koks et al.(2015)</label><mixed-citation>
      
Koks, E. E., Bočkarjova, M., de Moel, H., and Aerts, J. C. J. H.: Integrated Direct and Indirect Flood Risk Modeling: Development and Sensitivity Analysis, Risk Anal., 35, 882–900, <a href="https://doi.org/10.1111/risa.12300" target="_blank">https://doi.org/10.1111/risa.12300</a>, 2015.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib27"><label>Ludwig et al.(2019)</label><mixed-citation>
      
Ludwig, R., Wood, R. R., Willkofer, F., Mittermeier, M., Böhnisch, A., and Poschlod, B.: Klimawandel und Extremereignisse. Risiken und Perspektiven für die Bayerische Wasserwirtschaft, Abschlussbericht,
München, Germany, 2019.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib28"><label>Merz and Thieken(2009)</label><mixed-citation>
      
Merz, B. and Thieken, A. H.: Flood risk curves and uncertainty bounds, Nat. Hazards, 51, 437–458, <a href="https://doi.org/10.1007/s11069-009-9452-6" target="_blank">https://doi.org/10.1007/s11069-009-9452-6</a>, 2009.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib29"><label>Merz et al.(2010a)</label><mixed-citation>
      
Merz, B., Hall, J., Disse, M., and Schumann, A.: Fluvial flood risk management in a changing world, Nat. Hazards Earth Syst. Sci., 10, 509–527, <a href="https://doi.org/10.5194/nhess-10-509-2010" target="_blank">https://doi.org/10.5194/nhess-10-509-2010</a>, 2010a.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib30"><label>Merz et al.(2010b)</label><mixed-citation>
      
Merz, B., Kreibich, H., Schwarze, R., and Thieken, A.: Review article “Assessment of economic flood damage”, Nat. Hazards Earth Syst. Sci., 10, 1697–1724, <a href="https://doi.org/10.5194/nhess-10-1697-2010" target="_blank">https://doi.org/10.5194/nhess-10-1697-2010</a>, 2010b.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib31"><label>Merz et al.(2024)</label><mixed-citation>
      
Merz, B., Nguyen, D., Guse, B., Kreibich, H., Sairam, N., Apel, H., Farrag, M., Han, L., and Vorogushyn, S.: Kontinuierliche, räumlich verteilte Langzeitsimulation zur Abschätzung des Hochwasserrisikos für Deutschland, Hydrologie &amp; Wasserbewirtschaftung, 68, <a href="https://doi.org/10.5675/HYWA_2024.4_2" target="_blank">https://doi.org/10.5675/HYWA_2024.4_2</a>, 2024.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib32"><label>Messner et al.(2007)</label><mixed-citation>
      
Messner, F., Penning-Rowsell, E., Green, C., Meyer, V., Tunstall, S., and Veen, A.: Evaluating flood damage: guidance and recommendations on principles and methods, Tech. rep., FLOOD Site Project Report, <a href="https://cepri.info/tl_files/pdf/messnerf2007a.pdf" target="_blank"/> (last access: 22 September 2026), 2007.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib33"><label>Metin et al.(2018)</label><mixed-citation>
      
Metin, A. D., Dung, N. V., Schröter, K., Guse, B., Apel, H., Kreibich, H., Vorogushyn, S., and Merz, B.: How do changes along the risk chain affect flood risk?, Nat. Hazards Earth Syst. Sci., 18, 3089–3108, <a href="https://doi.org/10.5194/nhess-18-3089-2018" target="_blank">https://doi.org/10.5194/nhess-18-3089-2018</a>, 2018.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib34"><label>Olesen et al.(2017)</label><mixed-citation>
      
Olesen, L., Löwe, R., and Arnbjerb-Nielsen, K.: Flood Damage Assessment. Literature review and recommended procedure, Tech. rep., Cooperative Research Centre for Water Sensitive Cities, Melbourne, Australia, ISBN 978-1-921912-39-9, 2017.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib35"><label>Petrow et al.(2006)</label><mixed-citation>
      
Petrow, T., Thieken, A. H., Kreibich, H., Merz, B., and Bahlburg, C. H.: Improvements on Flood Alleviation in Germany: Lessons Learned from the Elbe Flood in August 2002, Environ. Manage., 38, 717–732,
<a href="https://doi.org/10.1007/s00267-005-6291-4" target="_blank">https://doi.org/10.1007/s00267-005-6291-4</a>, 2006.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib36"><label>Pfurtscheller(2014)</label><mixed-citation>
      
Pfurtscheller, C.: Regional economic impacts of natural hazards – the case of the 2005 Alpine flood event in Tyrol (Austria), Nat. Hazards Earth Syst. Sci., 14, 359–378, <a href="https://doi.org/10.5194/nhess-14-359-2014" target="_blank">https://doi.org/10.5194/nhess-14-359-2014</a>, 2014.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib37"><label>Pianosi et al.(2016)</label><mixed-citation>
      
Pianosi, F., Beven, K., Freer, J., Hall, J. W., Rougier, J., Stephenson, D. B., and Wagener, T.: Sensitivity analysis of environmental models: A systematic review with practical workflow, Environ. Model. Softw., 79,
214–232, <a href="https://doi.org/10.1016/j.envsoft.2016.02.008" target="_blank">https://doi.org/10.1016/j.envsoft.2016.02.008</a>, 2016.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib38"><label>Ruf(2026)</label><mixed-citation>
      
Ruf, M.: mara-tum/flood-risk-model: flood-risk-model (Version v1.0), Zenodo [code], <a href="https://doi.org/10.5281/zenodo.22709790" target="_blank">https://doi.org/10.5281/zenodo.22709790</a>, 2026.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib39"><label>Sairam et al.(2021)</label><mixed-citation>
      
Sairam, N., Brill, F., Sieg, T., Farrag, M., Kellermann, P., Nguyen, V. D., Lüdtke, S., Merz, B., Schröter, K., Vorogushyn, S., and Kreibich, H.: Process‐Based Flood Risk Assessment for Germany, Earths Future, 9, e2021EF002259, <a href="https://doi.org/10.1029/2021EF002259" target="_blank">https://doi.org/10.1029/2021EF002259</a>, 2021.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib40"><label>Schulla and Jasper(2007)</label><mixed-citation>
      
Schulla, J. and Jasper, K.: Model description WaSiM-ETH, Zürich, Switzerland, <a href="https://www.wasim.ch/downloads/doku/wasim/wasim_2007_en.pdf" target="_blank"/> (last access: 21 September 2026), 2007.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib41"><label>Schultz et al.(2010)</label><mixed-citation>
      
Schultz, M. T., Gouldby, B. P., Simm, J. D., and Wibowo, J. L.: Beyond the Factor of Safety: Developing Fragility Curves to Characterize System Reliability, Tech. rep., Defense Technical Information Center, Fort Belvoir, VA, <a href="https://doi.org/10.21236/ADA525580" target="_blank">https://doi.org/10.21236/ADA525580</a>, 2010.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib42"><label>Sieg et al.(2019)</label><mixed-citation>
      
Sieg, T., Schinko, T., Vogel, K., Mechler, R., Merz, B., and Kreibich, H.: Integrated assessment of short-term direct and indirect economic flood impacts including uncertainty quantification, PLOS ONE, 14, e0212932,
<a href="https://doi.org/10.1371/journal.pone.0212932" target="_blank">https://doi.org/10.1371/journal.pone.0212932</a>, 2019.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib43"><label>Straub et al.(2025)</label><mixed-citation>
      
Straub, D., Betz, W., Ruf, M., Hoffmann, A., Landgraf, A., Friedli, L., and
Papaioannou, I.: Sensitivity measures for engineering and environmental
decision support, arXiv [preprint], <a href="https://doi.org/10.48550/arXiv.2507.08488" target="_blank">https://doi.org/10.48550/arXiv.2507.08488</a>, 2025.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib44"><label>Thieken et al.(2016)</label><mixed-citation>
      
Thieken, A. H., Kienzler, S., Kreibich, H., Kuhlicke, C., Kunz, M., Mühr, B., Müller, M., Otto, A., Petrow, T., Pisi, S., and Schröter, K.: Review of the flood risk management system in Germany after the major flood in 2013, Ecol. Soc., 21, 51, <a href="https://doi.org/10.5751/ES-08547-210251" target="_blank">https://doi.org/10.5751/ES-08547-210251</a>, 2016.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib45"><label>Thomas and Knüppe(2016)</label><mixed-citation>
      
Thomas, F. and Knüppe, K.: From Flood Protection to Flood Risk Management: Insights from the Rhine River in North Rhine-Westphalia, Germany, Water Resour. Manage., 30, 2785–2800,
<a href="https://doi.org/10.1007/s11269-016-1323-9" target="_blank">https://doi.org/10.1007/s11269-016-1323-9</a>, 2016.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib46"><label>USACE(1991)</label><mixed-citation>
      
USACE: Benefit determination involving existing levees. Policy Guide Letter 26, Memorandum for Major Subordinate Commands and District Commands., Tech. rep., U.S. Army Corps of Engineering, <a href="https://upload.wikimedia.org/wikipedia/commons/2/24/Subject-_Policy_guidance_letter_no._26%2C_benefit_determination_involving_existing_levees_-_USACE-p16021coll9-1421.pdf" target="_blank"/> (last access: 22 September 2026), 1991.


    </mixed-citation></ref-html>
<ref-html id="bib1.bib47"><label>Vitale(2023)</label><mixed-citation>
      
Vitale, C.: Understanding the shift toward a risk-based approach in flood risk management, a comparative case study of three Italian rivers, Environ. Sci. Policy, 146, 13–23, <a href="https://doi.org/10.1016/j.envsci.2023.04.015" target="_blank">https://doi.org/10.1016/j.envsci.2023.04.015</a>, 2023.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib48"><label>Vorogushyn(2008)</label><mixed-citation>
      
Vorogushyn, S.: Analysis of flood hazard under consideration of dike breaches, PhD thesis, Universität Potsdam, <a href="https://publishup.uni-potsdam.de/opus4-ubp/frontdoor/deliver/index/docId/2595/file/vorogushyn_diss.pdf" target="_blank"/> (last access: 22 September 2026), 2008.

    </mixed-citation></ref-html>
<ref-html id="bib1.bib49"><label>Vorogushyn et al.(2010)</label><mixed-citation>
      
Vorogushyn, S., Merz, B., Lindenschmidt, K., and Apel, H.: A new methodology for flood hazard assessment considering dike breaches, Water Resour. Res., 46, 2009WR008475, <a href="https://doi.org/10.1029/2009WR008475" target="_blank">https://doi.org/10.1029/2009WR008475</a>, 2010.

    </mixed-citation></ref-html>--></article>
