<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD Journal Publishing with OASIS Tables v3.0 20080202//EN" "journalpub-oasis3.dtd">
<article xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:oasis="http://docs.oasis-open.org/ns/oasis-exchange/table" xml:lang="en" dtd-version="3.0" article-type="research-article">
  <front>
    <journal-meta><journal-id journal-id-type="publisher">NHESS</journal-id><journal-title-group>
    <journal-title>Natural Hazards and Earth System Sciences</journal-title>
    <abbrev-journal-title abbrev-type="publisher">NHESS</abbrev-journal-title><abbrev-journal-title abbrev-type="nlm-ta">Nat. Hazards Earth Syst. Sci.</abbrev-journal-title>
  </journal-title-group><issn pub-type="epub">1684-9981</issn><publisher>
    <publisher-name>Copernicus Publications</publisher-name>
    <publisher-loc>Göttingen, Germany</publisher-loc>
  </publisher></journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.5194/nhess-22-2459-2022</article-id><title-group><article-title>Assessing flood hazard changes using climate model forcing</article-title><alt-title>Assessing flood hazard changes using climate model forcing</alt-title>
      </title-group><?xmltex \runningtitle{Assessing flood hazard changes using climate model forcing}?><?xmltex \runningauthor{D. P. Callaghan and M.~G. Hughes}?>
      <contrib-group>
        <contrib contrib-type="author" corresp="yes" rid="aff1">
          <name><surname>Callaghan</surname><given-names>David P.</given-names></name>
          <email>dave.callaghan@uq.edu.au</email><email>davepcallaghan@gmail.com</email>
        <ext-link>https://orcid.org/0000-0003-1405-7510</ext-link></contrib>
        <contrib contrib-type="author" corresp="no" rid="aff2 aff3">
          <name><surname>Hughes</surname><given-names>Michael G.</given-names></name>
          
        </contrib>
        <aff id="aff1"><label>1</label><institution>School of Civil Engineering, The University of Queensland, Brisbane,
QLD, Australia</institution>
        </aff>
        <aff id="aff2"><label>2</label><institution>Science Economics and Insights Division, NSW Department of Planning
and Environment, Australia</institution>
        </aff>
        <aff id="aff3"><label>3</label><institution>School of Earth Atmospheric and Life Sciences, University of
Wollongong, North Wollongong, NSW, Australia</institution>
        </aff>
      </contrib-group>
      <author-notes><corresp id="corr1">David P. Callaghan (dave.callaghan@uq.edu.au, davepcallaghan@gmail.com)</corresp></author-notes><pub-date><day>1</day><month>August</month><year>2022</year></pub-date>
      
      <volume>22</volume>
      <issue>8</issue>
      <fpage>2459</fpage><lpage>2472</lpage>
      <history>
        <date date-type="received"><day>7</day><month>March</month><year>2022</year></date>
           <date date-type="rev-request"><day>5</day><month>April</month><year>2022</year></date>
           <date date-type="rev-recd"><day>5</day><month>July</month><year>2022</year></date>
           <date date-type="accepted"><day>8</day><month>July</month><year>2022</year></date>
      </history>
      <permissions>
        <copyright-statement>Copyright: © 2022 David P. Callaghan</copyright-statement>
        <copyright-year>2022</copyright-year>
      <license license-type="open-access"><license-p>This work is licensed under the Creative Commons Attribution 4.0 International License. To view a copy of this licence, visit <ext-link ext-link-type="uri" xlink:href="https://creativecommons.org/licenses/by/4.0/">https://creativecommons.org/licenses/by/4.0/</ext-link></license-p></license></permissions><self-uri xlink:href="https://nhess.copernicus.org/articles/22/2459/2022/nhess-22-2459-2022.html">This article is available from https://nhess.copernicus.org/articles/22/2459/2022/nhess-22-2459-2022.html</self-uri><self-uri xlink:href="https://nhess.copernicus.org/articles/22/2459/2022/nhess-22-2459-2022.pdf">The full text article is available as a PDF file from https://nhess.copernicus.org/articles/22/2459/2022/nhess-22-2459-2022.pdf</self-uri>
      <abstract><title>Abstract</title>

      <p id="d1e103">A modelling framework for using regional climate projections to assess
flooding hazard has been developed and applied to the Gwydir River
(catchment 26 600 km<inline-formula><mml:math id="M1" display="inline"><mml:msup><mml:mi/><mml:mn mathvariant="normal">2</mml:mn></mml:msup></mml:math></inline-formula> and floodplain 8100 km<inline-formula><mml:math id="M2" display="inline"><mml:mrow><mml:msup><mml:mi/><mml:mn mathvariant="normal">2</mml:mn></mml:msup><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula>, NSW, Australia.
The model framework uses NSW and ACT Regional Climate Modelling version 1.5
projections combined with computationally efficient hydrologic and hydraulic
models. Although it required model management and high-performance computing
resources, the modelling framework successfully processed 18 regional
climate projections into flood projections. Specifically, a six-member set
of climate model combinations simulating a historical period (1951–2005) and
a future period (2006–2100) under two global emission pathways (RCP4.5 and
RP8.5) were used to predict flood depth and speed. In total,
1470 continuous years were simulated at hourly time steps. These flood
(depth and speed) projections were analysed to assess the flood hazard
changes under future climate scenarios by estimating changes in the annual
probability of occurrence of a range of flood hazard classes. The six-member
ensemble indicates that the flood hazard in the Gwydir Valley will decrease in the
short, medium and long term. There are also cases within the ensemble, which
includes increases in all non-safe flood hazard classifications while
decreasing the safe flood hazard classification.</p>
  </abstract>
    </article-meta>
  </front>
<body>
      

<sec id="Ch1.S1" sec-type="intro">
  <label>1</label><title>Introduction</title>
      <p id="d1e136">Climate change potentially includes changes in temperature, evaporation,
rainfall, and their seasonal patterns. Changes in rainfall patterns
translate to changes in flooding extent, duration, and strength (i.e. flood
hazard). Preparing for potential future changes in flood hazard can require
significant lead times; thus, it is critical to incorporate climate change
information into flood hazard risk assessment and adaptation planning. One
way of investigating the nature of potential future flooding involves climate
model outputs being converted to hydrodynamic outputs (flow depth and speed
as a function of time), but this is not a trivial task and there is no
general agreement on an approach. For example, future climate-related
changes in the fitted distributions to channel discharge estimates have been
evaluated using stochastic methods, water balance modelling and change
factors (Delgado et al., 2014; Hirabayashi et al., 2013; Smith et al.,
2014a). On the other hand, the direct application of climate model outputs
has been discouraged by some (Cloke et al., 2013; Prudhomme et al.,
2010). Nevertheless, some accelerated models for converting discharge into
floodplain inundation show promise for converting regional-scale climate
model outputs into continuous flood dynamics for hazard assessment on large
and complex floodplains (e.g. Bates et al., 2010; Falter et al., 2013;
Ghimire et al., 2013; Lhomme et al., 2009).</p>
      <p id="d1e139">Assessing the future flood hazard under climate change directly (i.e. from
hazard <inline-formula><mml:math id="M3" display="inline"><mml:mo>=</mml:mo></mml:math></inline-formula> depth <inline-formula><mml:math id="M4" display="inline"><mml:mo>×</mml:mo></mml:math></inline-formula> speed) at regional or jurisdictional scales
requires the ability to simulate river discharge and floodplain inundation
at hourly (or better) time scales over many decades and across large areas.
The necessary computational efficiency can potentially be achieved by a
variety of physics-based approaches including dynamic wave, partial inertial
wave, diffusive wave and kinematic wave models (e.g. Montanari et al.,
2009; Bates et al., 2010; De Roo et al., 2000; Miller, 1984). These involve
simplifying the physics that are simulated together with a reduction in
detail for one or two of the flow dimensions. For example, the
computationally efficient LISFLOOD-FP offers options to implement such as dynamic
wave, partial inertial wave or kinematic wave depending on what the
environment being modelled demands (Lhomme et al., 2010; Bates et al.,
2010, 2005). Decisions are therefore required on which
physical processes can safely be ignored in the river environment of
interest. Alternatively, there are computationally efficient rules-based
models that involve a set of rules that mimic continuity and kinematic
limits (e.g. Guidolin et al., 2016). The best choice
of these two model approaches for undertaking a flood hazard assessment
under future climate change optimizes the trade-off between model accuracy
and computational effort with obtaining the necessary flood outputs to
calculate hazard.</p>
      <p id="d1e156">Performing hazard risk assessments and developing adaptation strategies for
hazards under future climate change generally requires regional-scale (or
better) climate projections. This involves refinement of global climate
models through either statistical down-scaling (e.g. Wilby et al., 1998;
Schmidli et al., 2006; Timbal and Jones, 2008) or dynamical down-scaling
(e.g. Laprise, 2008; Giorgi, 2006; Ekström et al., 2015). The
Australian NSW and ACT Regional Climate Model (NARCliM) is one example of
this approach and used dynamical downscaling of a global 50 km model grid to
a regional 10 km model grid (Evans et al., 2014; Nishant et al., 2021).
Climate models represent the distribution of weather and as such,
comparisons between climate model projections and historical measurements
are possible by comparing their distributions but not by comparing specific
historical events. Comparing distributions requires a balance between a
measurement and model record long enough for such distributions to be
appropriately defined while being short enough to limit non-stationary
impacts from the changing climate. For parameters such as daily temperature
or average rainfall, a 20-year period is suitable given that there are many
rainfall events per year and every day has a maximum temperature (near
continuous variable). For parameters with rarer occurrences, such as
floodplain inundation, defining their distribution becomes increasingly more
marginal. For example, defining changes in flood inundation that is exceeded
every 100 years using a 20-year simulation period comes with considerable
uncertainty. However, we may be able to usefully compare relevant
measurements and model projections for more frequent events, such as the
annual flood hazard classes.</p>
      <p id="d1e159">Recent work investigating projected changes in flood risk under plausible
climate futures includes Shrestha and Lohpaisankrit (2017) who
forced a rainfall runoff model to estimate changes in discharges in the
streamwise direction, allowing evaluation of changes in future risk.
Moreover, Janizadeh et al. (2021) trained a machine-learning
model to convert basin geometry and rainfall into risk, which was used with
climate projections to evaluate future risk changes. Finally, Ryu et al. (2022) analysed adjusted rainfall projections using flood frequency
methods to assess risk changes at the basin level. The method here seeks to
extend these by using a physics-based model to convert runoff into spatially
explicit water surface levels and speeds across the entire floodplain and
throughout the entire climate projection period. This objective overcomes
issues around data-poor regions (i.e. where machine-learning methods are
not possible), provides flood projections at consistent spatial and temporal
resolutions across the full extents of the model (both streamwise and
cross-stream), and permits application to river systems with complex
hydraulics and discharge patterns (e.g. multiple and parallel channels),
which rainfall-runoff models are unable to reasonably simulate.</p>
      <p id="d1e163">The purpose of this paper is to describe the successful application of a
modelling framework developed to convert climate model projections to
hydrodynamic outputs, which were then used to assess future changes to
present-day regional flood hazard. We demonstrate the utility of the
approach by applying it to the Gwydir River, a large valley-floodplain
system located in the northern Murray-Darling Basin, Australia. After
reviewing candidate numerical models, a new method for driving a
hydrological flow-routing model and the LISFLOOD-FP hydraulic model with
climate projections for rainfall-runoff (or excess rainfall) was applied
using the NARCliM1.5 climate projections, as an example. Rather than using
the climate projections to determine key or design events for simulation, we
simulate river floodplain hydraulics for the full climate projection time
series. Projected future regional flood inundation extents and the spatial
distribution of flood hazard are presented for two global emission pathways
(RCP4.5 and RCP8.5). Challenges associated with spatial and temporal
sparsity in floodplain inundation and applying conventional extreme value
distributions to evaluate future flood exceedance probabilities are
discussed. These confound efforts to answer the question – will present-day
flood hazards change under future climate projections? We provide a new
approach to answering that question.</p>
</sec>
<sec id="Ch1.S2">
  <label>2</label><title>Methods</title>
      <p id="d1e174">The objectives in converting climate model outputs to inundation estimates
were: (i) develop a method for manipulating NARCliM 1.5 hydrological
variables for application in rainfall-runoff routing models that use
rainfall minus the water that infiltrates the soil and is thus not available for runoff, (ii) review the literature to
identify potential flood models suited to application over large spatial and
temporal scales, and (iii) identify the most suitable flood model and apply
to a large river valley. To successfully achieve these objectives, a series
of principles were adopted to guide an iterative development of the model
framework, which was then stress-tested on the Gwydir River floodplain, New
South Wales (NSW), Australia. These principles, in no particular order are:
(i) use NARCliM 1.5 outputs to force models suitable for flood inundation
estimation; (ii) maximize benefit from inundation estimates by simulating the
entire NARCliM 1.5 set of projections; (iii) use open datasets, methods,
models and mostly automatic approaches; (iv) design the framework for
implementation on high-performance computing resources; and (v) the
historical period, constrained by measurements, determines parameter values
applied to the forecast period. The modelling framework that achieves our
aim (Fig. 1) and is consistent with these
principles constrains both hydrologic and hydraulic models, takes boundary
conditions from climate model outputs, simulates them entirely by breaking
them into 4-year windows with a 2-month overlap for warming up the
hydraulic model, develops initial conditions based on low flow conditions,
simulated in parallel on high-performance computing resources and has data
management to limit the file size associated with saving inundation depth
and speed by storing the daily maximum inundated depth and associated flow
speed. The various segments are then combined (removing the 2-month
overlap) and stored in compressed netCDF files
(<ext-link xlink:href="https://doi.org/10.48610/d7b1654" ext-link-type="DOI">10.48610/d7b1654</ext-link>, Callaghan, 2022). The hydrologic and hydraulic methods
used in this framework are discussed in Sect. 2.1 and 2.2.</p>

      <?xmltex \floatpos{t}?><fig id="Ch1.F1" specific-use="star"><?xmltex \currentcnt{1}?><?xmltex \def\figurename{Figure}?><label>Figure 1</label><caption><p id="d1e182">Proposed framework for converting climate model outputs to flood
model outputs.</p></caption>
        <?xmltex \igopts{width=369.885827pt}?><graphic xlink:href="https://nhess.copernicus.org/articles/22/2459/2022/nhess-22-2459-2022-f01.png"/>

      </fig>

<sec id="Ch1.S2.SS1">
  <label>2.1</label><title>Evaluation of climate model outputs and hydrological model theory</title>
      <p id="d1e198">The NARCliM 1.5 climate model ensemble includes three global climate models
(CCCma-CanESM2, CSIRO-BOM-ACCESS 1-0 and 1-3) with two regional climate
models (UNSW-WRF360 J and K) resulting in a set of six model combinations
(Nishant et al., 2021). Projections for two epochs
(historical 1951 to 2005 and projections 2006 to 2100) using two global
emission pathway scenarios (RCP 4.5 and 8.5) are available, and include
hourly variables of precipitation and total run off, and bias-corrected
daily precipitation (corrected to observed precipitation
distribution; see for example Evans et al., 2021). Although NARCliM 1.0 selected CMIP3
GCMs, NARCliM 1.5 selected CMIP5 GCMs from the unsampled space within
NARCliM 1.0, all with similar temperature increases but spanning the range
of precipitation changes from no change to moderate decrease to large
decrease (Nishant et al., 2021).</p>
      <p id="d1e201">NARCliM 1.5 was applied by matching, as much as possible, measured and
modelled climate statistics. For catchment runoff, this was done at
Gravesend on the Gwydir River, where the measured distribution of annual
maximum discharge was used to calibrate the hydrologic model. Gravesend
(Fig. 2) is the last gauging station before the
conversion between water level and river discharge becomes significantly
uncertain (tailwater and inundation feedbacks leading to significant
hysteresis). Each of the historical river discharge projections were
calibrated using the measured distribution of annual maximum discharge at
Gravesend. The hydrologic model used the excess precipitation (excess
rainfall) obtained from NARCliM 1.5 (“total run off” code named mrro) in the
following manner. The bias-corrected daily rainfall was used to bias correct
daily total run off (or excess daily rainfall), and this was interpolated
onto an hourly timeframe using the NARCliM 1.5 hourly precipitation for
shape. That is
            <disp-formula id="Ch1.E1" content-type="numbered"><label>1</label><mml:math id="M5" display="block"><mml:mtable rowspacing="0.2ex" class="split" displaystyle="true" columnalign="right left"><mml:mtr><mml:mtd/><mml:mtd><mml:mrow><mml:mi mathvariant="normal">daily</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">runoff</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">corrected</mml:mi><mml:mo>=</mml:mo><mml:mi mathvariant="normal">daily</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">runoff</mml:mi></mml:mrow></mml:mtd></mml:mtr><mml:mtr><mml:mtd/><mml:mtd><mml:mrow><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mo>×</mml:mo><mml:mstyle displaystyle="true"><mml:mfrac style="display"><mml:mrow><mml:mi mathvariant="normal">bias</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi mathvariant="normal">corrected</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi mathvariant="normal">daily</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">precipitation</mml:mi></mml:mrow><mml:mrow><mml:mi mathvariant="normal">daily</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">precipitation</mml:mi></mml:mrow></mml:mfrac></mml:mstyle></mml:mrow></mml:mtd></mml:mtr></mml:mtable></mml:math></disp-formula>
          and
            <disp-formula id="Ch1.E2" content-type="numbered"><label>2</label><mml:math id="M6" display="block"><mml:mrow><mml:mtable class="split" rowspacing="0.2ex" displaystyle="true" columnalign="right left"><mml:mtr><mml:mtd/><mml:mtd><mml:mrow><mml:mi mathvariant="normal">hourly</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">runoff</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">on</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi mathvariant="normal">day</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi>t</mml:mi><mml:mo>=</mml:mo><mml:mi mathvariant="normal">daily</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi mathvariant="normal">runoff</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">corrected</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi mathvariant="normal">on</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">day</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi>t</mml:mi></mml:mrow></mml:mtd></mml:mtr><mml:mtr><mml:mtd/><mml:mtd><mml:mrow><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mo>×</mml:mo><mml:mstyle displaystyle="true"><mml:mfrac style="display"><mml:mrow><mml:mi mathvariant="normal">hourly</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">rainfall</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">on</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">day</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi>t</mml:mi></mml:mrow><mml:mrow><mml:munder><mml:mo movablelimits="false">∑</mml:mo><mml:mrow><mml:mi mathvariant="normal">day</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi>t</mml:mi></mml:mrow></mml:munder><mml:mi mathvariant="normal">hourly</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi mathvariant="normal">rainfal</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">on</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mi mathvariant="normal">day</mml:mi><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mi>t</mml:mi></mml:mrow></mml:mfrac></mml:mstyle></mml:mrow></mml:mtd></mml:mtr></mml:mtable><mml:mo>,</mml:mo></mml:mrow></mml:math></disp-formula>
          where the last term in Eq. (2) ranges from zero to unity.</p>

      <?xmltex \floatpos{t}?><fig id="Ch1.F2" specific-use="star"><?xmltex \currentcnt{2}?><?xmltex \def\figurename{Figure}?><label>Figure 2</label><caption><p id="d1e357">Catchments and waterways flowing through the Gwydir Valley with the
location within New South Wales (NSW), Australia shown in the bottom left
inserts. Hydraulic model extents shown by colour-shaded area representing
ground elevation in metres above mean sea level (colour bar) with the main
source of inflows from the Gwydir River, which has a gauging station at
Gravesend (black dot). The 133 watershed boundaries within the hydraulic model and
sub-catchments within each waterway are not shown for clarity. The white areas
within the hydraulic model grid are areas surrounded by levees and are
unavailable to convey water.</p></caption>
          <?xmltex \igopts{width=341.433071pt}?><graphic xlink:href="https://nhess.copernicus.org/articles/22/2459/2022/nhess-22-2459-2022-f02.png"/>

        </fig>

      <p id="d1e367">The excess precipitation was routed through catchment models following the
method proposed by Mein et al. (1974), which is referred to as a
ROR-style model with two free parameters, <inline-formula><mml:math id="M7" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula> and <inline-formula><mml:math id="M8" display="inline"><mml:mi>k</mml:mi></mml:math></inline-formula>, that are nominally for
discharge shape and storage, but experience with this model indicates that their
theoretical basis is weak and they are used as free calibration parameters.
The external catchments draining to the hydraulic model
(Fig. 2) come from Gwydir River, Boggy Creek,
Waterloo Creek, Curley Creek, Tycannah Creek, Mosquito Creek, North Creek
and an unnamed watershed. Each catchment was broken into between five and 13
sub-catchments, yielding an outflow suitable for use in the hydraulic model.
The hydraulic model covers a significant area (9621 km<inline-formula><mml:math id="M9" display="inline"><mml:mrow><mml:msup><mml:mi/><mml:mn mathvariant="normal">2</mml:mn></mml:msup><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> and
consequently, runoff onto the hydraulic model is included by associating
sub-catchments with model grid locations. The climate projections have more
than one grid cell within sub-catchments in many places, with these
contributions reduced by the area of each cell from the climate projection
overlaps each sub-catchment, with these contributions allocated in
proportion to the grid cell overlap on the sub-catchment.</p>
      <p id="d1e396">Comparisons with measurements of river discharge at Gravesend, on a
distribution basis, indicated that using NARCliM 1.5 to provide excess
rainfall and a ROR-style runoff routing model with no losses (initial or
continuing) leads to overestimates of frequent events and underestimates of
infrequent events. This indicates that there is not enough loss of water
volume during lighter rainfall events compared with heavier rainfall events
within NARCliM 1.5. There are many on-farm water storages not included in
the NARCliM 1.5 or catchment hydrologic models used to this point. To
include them, we extended the hydrology models by adjusting the excess
precipitation before it is used for runoff routing. The excess precipitation
was routed through a storage of maximum depth <inline-formula><mml:math id="M10" display="inline"><mml:mrow><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">max</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, a surface area of
<inline-formula><mml:math id="M11" display="inline"><mml:mrow><mml:mi>f</mml:mi><mml:mi>A</mml:mi></mml:mrow></mml:math></inline-formula> (where <inline-formula><mml:math id="M12" display="inline"><mml:mi>A</mml:mi></mml:math></inline-formula> is the catchment area) whereas water within that storage was
evaporated using a monthly mean of measured evaporation rates and a usage rate
to model farm use. The storages were initially started at half full. If the
storage does not overflow during a time step, there will be no excess
rainfall. If the storage does overflow, then there will be excess rainfall,
<inline-formula><mml:math id="M13" display="inline"><mml:mrow><mml:msub><mml:mi>P</mml:mi><mml:mi mathvariant="normal">r</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, to yield runoff. Mathematically, if <inline-formula><mml:math id="M14" display="inline"><mml:mi>h</mml:mi></mml:math></inline-formula> is the depth of water in the
storage, then it will change by
            <disp-formula id="Ch1.E3" content-type="numbered"><label>3</label><mml:math id="M15" display="block"><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>h</mml:mi><mml:mi>f</mml:mi><mml:mo>=</mml:mo><mml:mo>(</mml:mo><mml:mi>P</mml:mi><mml:mo>-</mml:mo><mml:mo>(</mml:mo><mml:mi>e</mml:mi><mml:mo>+</mml:mo><mml:mi>u</mml:mi><mml:mo>)</mml:mo><mml:mi>f</mml:mi><mml:mo>)</mml:mo><mml:mo>×</mml:mo><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>t</mml:mi><mml:mo>,</mml:mo></mml:mrow></mml:math></disp-formula>
          where <inline-formula><mml:math id="M16" display="inline"><mml:mi>P</mml:mi></mml:math></inline-formula> is the NARCliM 1.5 excess precipitation, <inline-formula><mml:math id="M17" display="inline"><mml:mi>e</mml:mi></mml:math></inline-formula> and <inline-formula><mml:math id="M18" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula> are evaporation and
usage rates and <inline-formula><mml:math id="M19" display="inline"><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>t</mml:mi></mml:mrow></mml:math></inline-formula> is the time increment. This adjustment was applied
as follows:
            <disp-formula id="Ch1.Ex1"><mml:math id="M20" display="block"><mml:mrow><mml:mi>h</mml:mi><mml:mfenced close=")" open="("><mml:mi>t</mml:mi></mml:mfenced><mml:mi>f</mml:mi><mml:mo>+</mml:mo><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>h</mml:mi><mml:mi>f</mml:mi><mml:mo>&gt;</mml:mo><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">max</mml:mi></mml:msub><mml:mi>f</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mfenced open="{" close=""><mml:mrow><mml:mtable class="array" columnalign="left"><mml:mtr><mml:mtd><mml:mrow><mml:msub><mml:mi>P</mml:mi><mml:mi mathvariant="normal">r</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mstyle displaystyle="false"><mml:mstyle displaystyle="false"><mml:mfrac style="text"><mml:mrow><mml:mi>f</mml:mi><mml:mi>h</mml:mi><mml:mo>+</mml:mo><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>h</mml:mi><mml:mi>f</mml:mi><mml:mo>-</mml:mo><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">max</mml:mi></mml:msub><mml:mi>f</mml:mi></mml:mrow><mml:mrow><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>t</mml:mi></mml:mrow></mml:mfrac></mml:mstyle></mml:mstyle></mml:mrow></mml:mtd></mml:mtr><mml:mtr><mml:mtd><mml:mrow><mml:mi>h</mml:mi><mml:mfenced close=")" open="("><mml:mrow><mml:mi>t</mml:mi><mml:mo>+</mml:mo><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>t</mml:mi></mml:mrow></mml:mfenced><mml:mi>f</mml:mi><mml:mo>=</mml:mo><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">max</mml:mi></mml:msub><mml:mi>f</mml:mi></mml:mrow></mml:mtd></mml:mtr></mml:mtable><mml:mo>,</mml:mo></mml:mrow></mml:mfenced></mml:mrow></mml:math></disp-formula>
          <?xmltex \hack{\vspace*{-2mm}}?>
            <disp-formula id="Ch1.Ex2"><mml:math id="M21" display="block"><mml:mrow><mml:mn mathvariant="normal">0</mml:mn><mml:mo>≤</mml:mo><mml:mi>h</mml:mi><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mi>f</mml:mi><mml:mo>+</mml:mo><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>h</mml:mi><mml:mi>f</mml:mi><mml:mo>≤</mml:mo><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">max</mml:mi></mml:msub><mml:mi>f</mml:mi><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mfenced close="" open="{"><mml:mrow><mml:mtable class="array" columnalign="left"><mml:mtr><mml:mtd><mml:mrow><mml:msub><mml:mi>P</mml:mi><mml:mi mathvariant="normal">r</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0</mml:mn></mml:mrow></mml:mtd></mml:mtr><mml:mtr><mml:mtd><mml:mrow><mml:mi>h</mml:mi><mml:mfenced open="(" close=")"><mml:mrow><mml:mi>t</mml:mi><mml:mo>+</mml:mo><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>t</mml:mi></mml:mrow></mml:mfenced><mml:mi>f</mml:mi><mml:mo>=</mml:mo><mml:mi>h</mml:mi><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mi>f</mml:mi><mml:mo>+</mml:mo><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>h</mml:mi><mml:mi>f</mml:mi></mml:mrow></mml:mtd></mml:mtr></mml:mtable><mml:mo>,</mml:mo></mml:mrow></mml:mfenced></mml:mrow></mml:math></disp-formula>
          <?xmltex \hack{\vspace*{-2mm}}?>
            <disp-formula id="Ch1.E4" content-type="numbered"><label>4</label><mml:math id="M22" display="block"><mml:mrow><mml:mi>h</mml:mi><mml:mo>(</mml:mo><mml:mi>t</mml:mi><mml:mo>)</mml:mo><mml:mi>f</mml:mi><mml:mo>+</mml:mo><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>h</mml:mi><mml:mi>f</mml:mi><mml:mo>&lt;</mml:mo><mml:mn mathvariant="normal">0</mml:mn><mml:mspace width="0.25em" linebreak="nobreak"/><mml:mspace linebreak="nobreak" width="0.25em"/><mml:mfenced close="" open="{"><mml:mrow><mml:mtable class="array" columnalign="left"><mml:mtr><mml:mtd><mml:mrow><mml:msub><mml:mi>P</mml:mi><mml:mi mathvariant="normal">r</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0</mml:mn></mml:mrow></mml:mtd></mml:mtr><mml:mtr><mml:mtd><mml:mrow><mml:mi>h</mml:mi><mml:mfenced close=")" open="("><mml:mrow><mml:mi>t</mml:mi><mml:mo>+</mml:mo><mml:mi mathvariant="normal">Δ</mml:mi><mml:mi>t</mml:mi></mml:mrow></mml:mfenced><mml:mi>f</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0</mml:mn></mml:mrow></mml:mtd></mml:mtr></mml:mtable><mml:mo>,</mml:mo></mml:mrow></mml:mfenced></mml:mrow></mml:math></disp-formula>
          and if <inline-formula><mml:math id="M23" display="inline"><mml:mrow><mml:mi>f</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0</mml:mn></mml:mrow></mml:math></inline-formula>, then the model simplifies to <inline-formula><mml:math id="M24" display="inline"><mml:mrow><mml:msub><mml:mi>P</mml:mi><mml:mi mathvariant="normal">r</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mi>P</mml:mi></mml:mrow></mml:math></inline-formula>.</p>
</sec>
<sec id="Ch1.S2.SS2">
  <label>2.2</label><title>Selection of hydraulic theory and code</title>
      <p id="d1e829">Climate change evaluation at regional scale or larger for flooding hazard
and other applications requires fast and accurate enough flood modelling.
This review seeks to identify hydrodynamic models with proven track records
to achieve this evaluation in a timely manner with limited human resources
(automated processes). This assessment is separated into physics-based
models and rules-based models.</p>
      <p id="d1e832">Physics-based models typically follow Newton II and in particular, the
shallow water equation or dynamic wave equation, applied in either one or
two horizontal dimensions (e.g. 1D or 2DH), to solve for temporal and
spatial variation in flow depth and speed. There are several well-known
approximations of the dynamic wave equation, with kinematic, diffusive and
partial inertial-wave (or long-wave) approximations possibly the best known.
All physically based methods except dynamic wave exclude convective
acceleration and hence, momentum changes required to change flow direction.
Consequently, forces from water-surface gradients required to get flow
through geometry changes (road embankments across a floodplain) is reduced
when compared with including convective acceleration. These terms have been
found to be essential in ocean models where mean water-level gradients are
exceedingly small and flow mass exceedingly large (mean ocean depth is ca. 4 km).</p>
      <p id="d1e835">There are too many examples of successful dynamic-wave application in two
dimensions or a combination of one and two dimensions to list them all;
however, the following subset (e.g. Montanari et al., 2009; Ahmadisharaf
et al., 2018) highlight methods aimed at accelerating applications for flood
management including graphics processing unit implementations through to
careful use of 1D/2DH modelling (resulting in global-scale continuous
simulations). This approach remains the benchmark theory for flood
modelling.</p>
      <p id="d1e838">Examples of successfully applied partial inertial wave models are numerous
(e.g. Rajib et al., 2020; Sampson et al., 2015; Bates et al., 2010) and
this approach has a proven track record of: statistical evaluations, hazard
mapping or Monte Carlo risk evaluations including damage estimations with
velocity and depth contributions (e.g. Hoch et al., 2017; Neal et al.,
2013), large spatial and temporal scale assessments where channels were
sub-grid features (O'Loughlin et al., 2020; Schumann et al., 2013),
multi-channel assessments (Altenau et al., 2017), temporal
scales from minutes to years (e.g. O'Loughlin et al., 2020; Neal et al.,
2011) and on to geological scales (Coulthard et al.,
2013), coastal storm surge inundation (Lewis et al., 2011),
coastal tidal dynamics (Skinner et al., 2015), and flooding
in urban, rural, remote and limited data applications (e.g. Amarnath et
al., 2015; Bates et al., 2010; Fewtrell et al., 2011; O'Loughlin et al.,
2020). Although there are notes of caution with this approach at large scale
(Schumann et al., 2012) and other authors advocating for the
diffusive wave (Dottori and Todini, 2013) over the partial inertial
wave, it has the best track record after the dynamic-wave equation while
being exceptionally quick. The partial inertial-wave equation has a
theoretical limit in that at either high velocity (Froude number exceeding
1) or low frictional force, the momentum equation becomes unstable. This
well-known issue has been noted in the recent literature with respect to
LISFLOOD.</p>
      <p id="d1e842">The diffusive wave equation has a long track record dating back to when
hydraulic modelling using numerical methods in two dimensions started in the
1970's. However, in more recent times where it has been revisited for its
light computing load (e.g. Mason et al., 2009; Apel et al., 2009; De Roo
et al., 2000), it has been the reason for shifting to the partial-inertial wave
equation (Neal et al., 2012), with only one reference found arguing
diffusion over partial inertial wave (Dottori and Todini, 2013) for
accelerated flood assessments. Further, there is evidence that a diffusive
wave does not handle urban environments (Costabile et al., 2017)
but away from these areas and with enhancements, it is accurate enough
(Jamieson et al., 2012). The diffusive-wave model links forces
to motion exclusively through the friction model whereas the partial inertia-wave model has a combination of friction and temporal acceleration. This
fixed link through the adopted friction model means that uncertainties in the
friction model and spatial and temporal parameter variations are more
significant in diffusive-wave estimations. As the earlier
engineers/scientists knew, applying diffusive wave theory to subcritical
flow on a two-dimensional horizontal grid is often numerically unstable
leading to the checkerboard predictions. Although some recent authors were
seeking to address this numerical stability issue using careful spatial and
temporal selections and flux gradient limiters, ultimately the decision to
include the additional temporal acceleration (inertial) term resolved their
numerical issues almost entirely. From the balance of evidence and theoretical
arguments, it is proposed that the diffusive-wave model is an unacceptable approach
when trading off between accuracy and speed.</p>
      <p id="d1e845">The kinematic-wave equation has a long track record in modelling
supercritical flows (Miller, 1984) with more limited application to
subcritical flow modelling of prismatic channels (Zheng et al., 2020).
When the continuity equation is combined with the kinematic-wave equation,
predictions exclude flow attenuation and actually increase discharge and
water surface slopes (Miller, 1984, p. 18). In the case of
prismatic channels, the water depth and discharge are fixed or <inline-formula><mml:math id="M25" display="inline"><mml:mrow><mml:mi>Q</mml:mi><mml:mo>=</mml:mo><mml:mi>Q</mml:mi><mml:mo>(</mml:mo><mml:mi>h</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula>, where <inline-formula><mml:math id="M26" display="inline"><mml:mi>Q</mml:mi></mml:math></inline-formula> is discharge (Henderson, 1966, p. 367) and yet
numerical models of prismatic channels rarely achieve this and degrade to
<inline-formula><mml:math id="M27" display="inline"><mml:mi>Q</mml:mi></mml:math></inline-formula> increasing with both time (<inline-formula><mml:math id="M28" display="inline"><mml:mi>t</mml:mi></mml:math></inline-formula>) and position. Miller (1984, p. 20)
further indicates that for a successful kinematic-wave application, ad hoc
modifications in how this equation is solved are required and then only on
the rising limb. Consequently, large errors are expected when using the
kinematic-wave equation in non-prismatic channel systems. The balance of
evidence and theoretical arguments indicates that kinematic wave equation is
an unacceptable approach when trading off between accuracy and speed.</p>
      <p id="d1e887">The impact cell method is based on rules around how floodplains fill with
water during flooding either over defences or by defence failure. They use a
dynamic-wave equation one-dimensional model to drive the floodplain filling
and although they appear to be temporal, they are quasi-steady (Lhomme et
al., 2009; Gouldby et al., 2008; Hall et al., 2003). The major drawback is
model development in that it involves a combination of physical and
probabilistic inputs, which have no apparent automatic techniques for their
estimation. There is a lack of a track record around estimating velocities
from the water-level gradients that this style of model predicts.</p>
      <p id="d1e890">The cellular automata method is based on a set of rules that mimic
continuity and kinematic limits, which from limited testing (e.g. Jamali
et al., 2019; Guidolin et al., 2016; Nicholas et al., 2006) is able to
simulate urban areas, multi-channel systems and hydraulic structures within
a gridded domain. Various versions do include storage attenuation. There is,
however, no track record around estimating velocities from the water-level
gradients that this style of model predicts.</p>
      <p id="d1e893">There are other rules-based methods, including rating curve geographic information system models
(e.g. Zheng et al., 2018; Apel et al., 2008) through to dynamic and rule-based combined models (Bernini and Franchini, 2013; Jamieson et al.,
2012). These have not been considered as they exclude flow routing.</p>
      <p id="d1e896">The trade-off between accuracy and computational effort and seeking flood
hazard information thereby requiring reasonable flow speed estimates leads
to the selection of the partial inertial-wave equation (LISFLOOD) and the
cellular automata (WCAD2D). These two hydraulic models were compared in both
steady and unsteady tests and evaluated for speed. Although estimates of flood
levels from the two models were similar, LISFLOOD was found to be 2 to 2.5
times faster when tested on large floodplains such as the Gwydir River. This
led to the selection of LISFLOOD.</p>
</sec>
<sec id="Ch1.S2.SS3">
  <label>2.3</label><title>Implementation of the LISFLOOD hydraulic model</title>
      <p id="d1e907">The LISFLOOD model was limited to the region covering the Gwydir River
Floodplain of 8100 km<inline-formula><mml:math id="M29" display="inline"><mml:msup><mml:mi/><mml:mn mathvariant="normal">2</mml:mn></mml:msup></mml:math></inline-formula>. LISFLOOD could have been applied across the
entire catchment, removing the need for including a hydrology model. Although
this may be useful in particular situations, for the present case study that
would require a LISFLOOD model grid covering 2.8 times more area,
unnecessarily increasing the burden on computational resources.
Consequently, the ROR-style hydrology model with flow routing provides a
trade-off between computational resources and framework complexity.</p>
      <p id="d1e919">Surface roughness (using Manning's <inline-formula><mml:math id="M30" display="inline"><mml:mi>n</mml:mi></mml:math></inline-formula>) for the LISFLOOD model developed here
was obtained from existing calibrated hydraulic models for the Gwydir River.
There are three models forming the NSW Department of Planning and
Environment Gwydir River hydraulic model with 1D links (channel links
without hydraulic structures) and 2D grids with resolutions from 20 to 50 m using MIKE FLOOD (Anonymous, 2015). After balancing resolution with file
size and run times, a 100 m resolution was selected. These three models were
combined to develop the 100 m digital elevation model (DEM) with extents to enclose Binniguy to Moree,
Moree to Barwon and Thalaba Creek MIKE FLOOD hydraulic models (colour-shaded
area in Fig. 2). The origin was set so that the
100 m DEM collocated with every second grid point of the Moree to Barwon
model. Crest features (usually roads, but any feature that could either act
as a weir or a dam that changes discharge distributions) were extracted out of
Binniguy to Moree, Moree to Barwon and Thalaba Creek DEMs, and put onto the
100 m DEM. This was achieved in a two-step process: first, a smooth version
of each existing DEM was subtracted from the new 100 m DEM and differences
below 0.2 m removed. The resulting features showed crests as well as other
differences related to waterways. The crest features alignments were then
determined, and the crests extracted. Waterways removed from Binniguy to
Moree were put back in using survey DEM, missing areas were filled in using
Shuttle Radar Topography Mission data and finally, streams were
hydraulically connected (Fig. 2).</p>
      <p id="d1e929">The three hydraulic models forming the Gwydir River hydraulic model by NSW
government was used to constrain (to previously calibrated hydraulic models)
the LISFLOOD model, using their 2012 calibration runs, performed in MIKE
FLOOD. There are complications in that those NSW government models included
1D elements, had finer resolution (20 and 50 m) and were separated into
three domains, one run in steady state (southern region) and the other two
using dynamic simulations with varying simulation periods, compared with the
one encompassing LISFLOOD model, which had a coarser resolution (100 m) and
no 1D elements. To rationalize these comparisons, locations where the NSW
government models had reported inundation were used to constrain the
LISFLOOD model. The first calibration series ran 100 incremental model
topographies from largest main channels possible from survey to no channels,
and inflows taken directly from the NSW government models. The channel
geometry was selected to obtain the best match to these calibrated models.</p>
</sec>
<sec id="Ch1.S2.SS4">
  <label>2.4</label><title>Climate projection to flood simulations</title>
      <p id="d1e940">NARCliM 1.5 includes six historical projections and 12 future projections,
providing 18 periods for simulation, covering a total physical time of 1470
years. The historical projections run from the start of 1951 to the end of 2005,
which is 55 years each and a total of 330 years. The future projections from
the start of 2006 to the end of 2100, which is 95 years each, total 1140
years. Consequently, the total from historical and future projections is
1470 years. Such simulations require high-performance resources and careful
selection of outputs and model resolution to ensure that simulations are obtained
within a reasonable timeframe. Within storage resources available, output
from LISFLOOD was hourly and then post-processed to daily information of
maximum inundation depth and the flow speed at that maximum depth. This,
with several storage techniques to minimize file sizes (netCDF with
compression and finite data resolution), reduced required storage from ca.
10 TB to 100 GB. Applications involving steeper catchments and floodplains
may warrant storage of hourly rather than daily outputs. To further enhance
model throughput, simulations were broken into 4-year segments, with an
additional 2-month warm-up period using initial conditions taken from a low-flow simulation developed from measurements and average evaporation. It was confirmed that the
2-month warm-up period did not have an impact on projections by comparing
projections from the end of a segment with the projections (after warm-up) at
the start of the following segment. The model grid was selected after
initial testing of four resolutions of 50, 75, 100 and 150 m. These
tests indicated that simulation times, from finest to coarsest grids, were 55,
16, 7 and 2.5 d per decade respectively, whereas mean biases from the 50 m
resolution were 1, 5 and 12 cm for the 75, 100 and 150 m
resolutions grids. The 100 m grid was a reasonable balance between output
size, simulation speed and model performance for resources available. That
is, a reasonable balance between loss of accuracy of 50 and 75 m
resolution when compared with eight- and two-fold decrease in computational
resources. The LISFLOOD version implemented was the latest available at the
time (February 2021), compiled with the 2018 version of Intel C<inline-formula><mml:math id="M31" display="inline"><mml:mrow><mml:mo>+</mml:mo><mml:mo>+</mml:mo></mml:mrow></mml:math></inline-formula> and
ran on CentOS version 7. These simulations took several weeks using high
performance computing resources where between 160 and 480 threads were
available.</p>
</sec>
<sec id="Ch1.S2.SS5">
  <label>2.5</label><title>Flood hazard classes</title>
      <p id="d1e961">The flood hazard classification shown in Fig. 3
(Smith et al., 2014b) is recommended for use in emergency planning
and management within Australia (Ball et al., 2019) and has
been applied here. The classification has six classes, starting with the
safe classification H1 (generally safe for vehicles, people and buildings)
through to H6 (unsafe for vehicles and people and all building types
considered vulnerable to failure). In applying these flood hazard
classifications, one additional hazard classification was added to capture
flood hazards exceeding the maximum class (H6). Additionally, regions with
no inundated areas over the analysis period were assigned to the safe hazard
class H1.</p>

      <?xmltex \floatpos{t}?><fig id="Ch1.F3" specific-use="star"><?xmltex \currentcnt{3}?><?xmltex \def\figurename{Figure}?><label>Figure 3</label><caption><p id="d1e966">A flood hazard classification scheme from H1 (safe) to H6
(dangerous) recommended for use in Australia. Flood hazard class H7 is
additional to the recommended classifications.</p></caption>
          <?xmltex \igopts{width=341.433071pt}?><graphic xlink:href="https://nhess.copernicus.org/articles/22/2459/2022/nhess-22-2459-2022-f03.png"/>

        </fig>

</sec>
<sec id="Ch1.S2.SS6">
  <label>2.6</label><title>Bernoulli's trial to assess flood hazard class changes</title>
      <p id="d1e983">The assessment of climate changes on flood hazard classification had to deal
with a range of climate model projections spanning dry through to wet, which
have significantly different flood projections and associated flood hazards.
Consequently, each flood hazard classification was treated separately, and
assessments were done on an annual basis for a historical epoch of 1980 to
1999, and projected epochs of 2020–2039 for near-term, 2050–2069 for medium-term
and 2080–2099 for long-term comparisons. These future epochs correspond to
those typically used for near, mid and far future horizons in government
planning. The occurrences of each flood hazard classification are then the
number of times it occurs divided by 20, the number of years within these
epochs, which is a maximum likelihood estimate of the occurrence probability
given 20 independent binomial (Bernoulli's) trials. Once the occurrence
probabilities are known for each epoch in each flood projection, they are
averaged or ensembled across the flood projections from the six climate
model combinations before estimating changes between epochs.</p>
</sec>
</sec>
<sec id="Ch1.S3">
  <label>3</label><title>Results</title>
<sec id="Ch1.S3.SS1">
  <label>3.1</label><title>Calibration of the hydrologic model</title>
      <p id="d1e1002">The hydrologic model calibration to annual maximum discharge at Gravesend
(Fig. 4) was achieved using the same <inline-formula><mml:math id="M32" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula> (nominally
stream shape, which is expected) and different <inline-formula><mml:math id="M33" display="inline"><mml:mrow><mml:msub><mml:mi>k</mml:mi><mml:mi mathvariant="normal">c</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> (channel storages) and
the same small catchment storage parameters
(<inline-formula><mml:math id="M34" display="inline"><mml:mrow><mml:mi>f</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0.0005</mml:mn></mml:mrow></mml:math></inline-formula>, <inline-formula><mml:math id="M35" display="inline"><mml:mrow><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">max</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0.2</mml:mn></mml:mrow></mml:math></inline-formula> m and <inline-formula><mml:math id="M36" display="inline"><mml:mrow><mml:mi>u</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">80</mml:mn></mml:mrow></mml:math></inline-formula> mm d<inline-formula><mml:math id="M37" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula>) across the six
historical climate projections available in NARCliM 1.5. Uncertainty remains
with the adopted calibration, which is minimized for inundation hazard
assessment by focusing calibration on rarer events.</p>

      <?xmltex \floatpos{t}?><fig id="Ch1.F4" specific-use="star"><?xmltex \currentcnt{4}?><?xmltex \def\figurename{Figure}?><label>Figure 4</label><caption><p id="d1e1077">Comparisons between modelled discharge at Gravesend
(Fig. 2) with measurements for all global (rows)
and regional (columns) climate model combinations. Model discharges includes
additional evaporation via local storages (<inline-formula><mml:math id="M38" display="inline"><mml:mrow><mml:mi>f</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0.0005</mml:mn></mml:mrow></mml:math></inline-formula>, <inline-formula><mml:math id="M39" display="inline"><mml:mrow><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">max</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0.2</mml:mn></mml:mrow></mml:math></inline-formula> m
and <inline-formula><mml:math id="M40" display="inline"><mml:mrow><mml:mi>u</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">80</mml:mn></mml:mrow></mml:math></inline-formula> mm d<inline-formula><mml:math id="M41" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula>). Hydrology model parameter <inline-formula><mml:math id="M42" display="inline"><mml:mrow><mml:mi>m</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0.5</mml:mn></mml:mrow></mml:math></inline-formula> for all cases and
<inline-formula><mml:math id="M43" display="inline"><mml:mrow><mml:msub><mml:mi>k</mml:mi><mml:mi mathvariant="normal">c</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> is indicated in each panel. Black lines indicate perfect
agreement, solid coloured lines and corresponding shaded regions are mean
and 95 % confidence of measured distribution when resampled to compare
with modelled discharges; different colours indicate different <inline-formula><mml:math id="M44" display="inline"><mml:mrow><mml:msub><mml:mi>k</mml:mi><mml:mi mathvariant="normal">c</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>.</p></caption>
          <?xmltex \igopts{width=398.338583pt}?><graphic xlink:href="https://nhess.copernicus.org/articles/22/2459/2022/nhess-22-2459-2022-f04.png"/>

        </fig>

<?xmltex \hack{\newpage}?>
</sec>
<sec id="Ch1.S3.SS2">
  <label>3.2</label><title>Calibration of the hydraulic model</title>
      <p id="d1e1182">The hydraulic model, LISFLOOD, was calibrated by varying the main channel
depths until it matched previous models, MIKE FLOOD, that had been
calibrated to historical floods. The hydraulic model with channel depth at
19 % of the maximum channel depth had mean flood level differences of less
than 1 mm (Fig. 5, top left panel) while also
being near the lowest standard deviation of flood level difference. As the
LISFLOOD and MIKE FLOOD models had different resolutions and consequently
different ground surface elevations, comparing depths bring in two changes,
one related to hydraulic performance and another related to ground surface
elevation interpolation differences (Fig. 5,
bottom left panel). Alternatively, comparing water surface levels
(Fig. 5, top right panel) removes this ground
surface elevation interpolation aspect; however, for models with large
vertical variation (e.g. Gwydir River has 100 m vertical change over its
167 km length), this vertical variation overpowers water level differences
when plotted. Nevertheless, comparing differences in both depth and water
surface level together with an overall water-level difference map
(Fig. 5, bottom right panel), provides a visual
assessment of model calibration.</p>

      <?xmltex \floatpos{t}?><fig id="Ch1.F5" specific-use="star"><?xmltex \currentcnt{5}?><?xmltex \def\figurename{Figure}?><label>Figure 5</label><caption><p id="d1e1187">Gwydir River hydraulic model (LISFLOOD) calibration to existing
MIKE FLOOD hydraulic models by NSW Environment &amp; Heritage. <bold>(a)</bold> Selection of schematized channel depth (zero means no channels and
100 % means largest main channels possible from survey) with the black
lines showing selected channel depth. <bold>(b)</bold> A comparison between
flood levels across the entire model (blue dots) with perfect fit (black
line). <bold>(c)</bold> A comparison between flood depth across the entire
model. <bold>(d)</bold> Difference map between models.</p></caption>
          <?xmltex \igopts{width=355.659449pt}?><graphic xlink:href="https://nhess.copernicus.org/articles/22/2459/2022/nhess-22-2459-2022-f05.png"/>

        </fig>

</sec>
<sec id="Ch1.S3.SS3">
  <label>3.3</label><title>Flood hazard classification and changes under RCP 4.5 and RCP 8.5</title>
      <p id="d1e1216">The occurrence probabilities under both RCP 4.5 and 8.5
(Fig. 6, Table S1) for flood-hazard classification
H1 (generally safe for people, vehicles and buildings) are predicted to
increase whereas higher hazard classifications (generally dangerous for
people, vehicles and buildings) are predicted to decrease in the long term
(comparing 2080–2099 with 1980–1999) for the NARCliM 1.5 ensemble.
Within this ensemble, the H1 occurrence probability changes for RCP 4.5 vary
from no change to an increase of 0.3 and for the RCP 8.5 increases from 0.06
to 0.39 (Figs. S1–S6), indicating a high likelihood of a reduction in flood
hazard at the valley scale. This longer-term assessment outcome does not
apply to the near or medium term (2020–2039 or 2050–2069, Table S1).
The change expected in the near term is very slight (increase in H1 by 0.01
to 0.02) but the ensemble includes projections where the H1 occurrence
probability is reduced by 0.09. These decreases in H1 come with increases in
H2 through to H4 of between 0.03 to 0.13. The medium-term comparison period
is a transition between the other two, with RCP 8.5 always increasing H1 and
decreasing H2 through to H4 and RCP 4.5 having both increases and decreases
in H1 through to H4 within the ensemble.</p>

      <?xmltex \floatpos{t}?><fig id="Ch1.F6" specific-use="star"><?xmltex \currentcnt{6}?><?xmltex \def\figurename{Figure}?><label>Figure 6</label><caption><p id="d1e1221">Gwydir Valley flood hazard historical (1980–1999) classification
occurrences and their changes under RCP 4.5 and RCP 8.5 (2080–2099) for
the NARCliM 1.5 ensemble. The mean of occurrence probability changes,
<inline-formula><mml:math id="M45" display="inline"><mml:mi mathvariant="italic">δ</mml:mi></mml:math></inline-formula>, shown in each panel. For brevity, flood hazard historical
classifications H5 to H7 are not shown as they are limited to within river
and creek channels.</p></caption>
          <?xmltex \igopts{width=384.112205pt}?><graphic xlink:href="https://nhess.copernicus.org/articles/22/2459/2022/nhess-22-2459-2022-f06.png"/>

        </fig>

</sec>
</sec>
<sec id="Ch1.S4">
  <label>4</label><title>Discussion</title>
      <p id="d1e1246">The increases in H1 occurrence coupled with decreases in H2–H4
(Fig. 6, Table S1 and Figs. S1–S6) indicates
that flood hazard is decreasing in the long term under projected climate
changes (all cases in the ensemble and both RCP 4.5 and 8.5) in the region
modelled (Fig. 2). The near-term changes are more
uncertain as there are cases in the ensemble that both increase and decrease
flood hazard (Table S1). Comparing the near, medium and long-term, RCP 8.5
shows a more certain decrease in flood hazard compared with RCP 4.5; however,
in both scenarios, the most likely outcome is a decrease in flood hazard,
with all members of the ensemble forecasting this.</p>
      <p id="d1e1249">The inference that flood hazard is decreasing in this region with projected
climate change comes with several key limitations. Hydrology models were
calibrated to best represent infrequent events across the historical period.
Consequently, these models overestimate the catchment runoff from frequent
events by different amounts for each member of the ensemble
(Fig. 4). These differences come from the climate
models themselves, where the rainfall runoff is estimated using different
approaches, leading to different outcomes across the one historical period.
That is, the distribution of runoff of each member of the ensemble for the
historical period, in the absence of epistemic uncertainty, should be
similar. Although these distributions are different and consequently, add to
the uncertainty of inundation depth and speed projections, both are used to
assess flood hazards. The hydraulic model, which was constrained reasonably
given the differences between resolution and modelling approaches
(Fig. 5), is less of an issue than
hydrologic uncertainty. However, there are still differences between
estimates (Fig. 5) from various flood projections
that may lead to different conclusions spatially. Finally, when estimating
changes in flood hazard, this would usually involve estimates of flood
hazard under extreme conditions. However, the assessment provided used an
alternative method for reasons discussed in the following paragraphs.</p>
      <p id="d1e1252">Conventional extreme value analysis for flood hazard assessments involves
establishing a link between flow discharges and exceedance probabilities.
This relationship can then be used to assign exceedance probabilities either
to historical events or synthetic events that represent historical events,
which are simulated, and the spatially varied maximum flood hazard obtained.
This approach would work for systems that are driven by one major inflow and
have flooded areas that are relatively small compared with the rainfall systems that
excite flooding. However, the floodplain being assessed has a large
catchment area compared with the spatial size of rainfall events and although it
has one major inflow, there are several others, and those combined with the
floodplain itself, make breaking continuous simulations into a series of
events where the probability is constant across the floodplain-inundated
area a subjective (or arbitrary) assessment.</p>
      <p id="d1e1255">Another issue in using conventional extreme value analysis for flood hazard
assessments is the balance between the projection period and the ability to
establish reasonable extreme value estimates. For example, one can do a
simple numerical experiment in which the two distributions are constructed
with a fixed increase in all extremes (simplest case), and then draw one
sample; the estimated extreme values, obtained from fitting to this sample,
can be both an increase and a decrease compared with that assumed and this is
due to sampling error when the analysis period is shorter than the extreme
value return period being estimated. To robustly estimate an extreme value,
using a one-off sample, the analysis period usually needs to be many times
its return period (rule-of-thumb, 10 or more). Without this, the sampling
error overwhelms any changes and thus any changes that are within the
confidence limits are statistically insignificant.</p>
      <p id="d1e1259">The final issue in using conventional extreme value analysis comes from the
differences in inundation extents and frequency across the climate model
projections that span dry through to wet conditions. This led to significant
areas that were inundated in the wettest projections that remained dry in
the driest projection. Consequently, the members within the ensemble would
vary spatially, making uncertainties difficult to understand and
communicate.</p>
      <p id="d1e1262">Applying extreme value theory to individual grid inundation flood hazard
(i.e. linking exceedance probability directly to flood hazard, after
applying either block maxima or the peak-over-threshold approach to independent
and identical distributed events to determine extreme events), as opposed to
the conventional method of linking probabilities through event peak
discharge, means that the number of extreme events changes from many events
along deep watercourses to approaching zero near the edge of maximum
inundation. This variation in the number of extreme events led to reasonably
consistent spatial projections along deep watercourses to inconsistent
spatial projections across the floodplain where the number of extreme events
approaches zero at the edge of inundation. These spatially inconsistent
projections were obtained for a range of extreme-value approaches and
fitting methods. Furthermore, near the edge of maximum inundation, the
extreme value models themselves broke down as the number of events
approached zero, the net result being very limited consistency in linking
exceedance probabilities to flood hazard across the floodplains,
particularly near the edge of maximum inundation.</p>
      <p id="d1e1265">Our approach (Sect. 2.5 and 2.6), where we estimate changes in the annual
probability of the occurrence of flood hazard classes overcomes issues with
conventional and grid-based extreme value analysis.</p>
</sec>
<sec id="Ch1.S5" sec-type="conclusions">
  <label>5</label><title>Summary</title>
      <p id="d1e1277">A modelling framework for estimating projected flood hazards from regional
climate model projections has been presented, including a different approach
to assessing flood hazard changes. The modelling framework was applied to
Gwydir River (Australia) using New South Wales and Australian Capital
Territory Regional Climate Modelling version 1.5 projections with
computationally efficient hydrologic and hydraulic models. This included six
historical and 12 future regional climate projections occupying the
plausible future climate space with similar temperature and drier
conditions. This included 6 historical and 12 future regional climate projections occupying the plausible future climate space with warmer temperature and drier conditions than in the history. The simulations were continuous and totalled 1470 years,
requiring high-performance computing resources for timely completion. The
climate projections included spatially varied rainfall runoff, allowing the
implementation of a hydrological modelling approach that only required flow
routing, as soil dynamics were included in the regional climate models. The
hydrology model was constrained by measured distributions of runoff. The
hydraulic modelling approach was selected after an extensive evaluation and
testing phase of modelling types with proven track records of computational
efficiency, leading to the selection of the partial inertial-wave equation
as implemented in LISFLOOD over the other family of efficient approaches
under the cellular automata umbrella. This hydraulic model was constrained
by modifying the main channel geometry until it matched more detailed and
calibrated hydraulic models using the dynamic wave equation. The simulations
resulted in spatially varied daily maximum flow depth and flow speeds at
those depths across the 18 regional climate projections, allowing flood
hazard assessments.</p>
      <p id="d1e1280">Changes in flooding hazard were assessed by estimating changes in the annual
probability of occurrence of a range of flood hazard classes, with the first
class, H1, being a safe class and all other classes having various levels of
flooding hazard. This approach was taken to overcome several barriers in
using conventional flood hazard assessment techniques where flooding hazards
are estimated at various extreme values. These barriers included a variable
number of hazard events across the floodplain, the ability to determine an
extreme value where the underlying processes are changing, through to
regional climate projections ranging from dry to wet, leading to significant
differences in inundation extents. Changes in annual probability of
occurrence in the long term are consistent, across the ensemble for both
RCP 4.5 and 8.5, indicating a reduction of flooding hazard across Gwydir
River region modelled for the climate futures evaluated. This was
demonstrated as an increased probability of occurrence of the safe class (H1)
and decreased probability in all the unsafe classes. The outcomes are more
mixed in the near term, with the ensemble indicating minor decreases in
flooding hazard albeit with ensemble members having both increases and
decreases. The medium-term projections are transitional between the near
and long term; however, there remain ensemble members with an increased
flooding hazard.</p>
</sec>

      
      </body>
    <back><notes notes-type="dataavailability"><title>Data availability</title>

      <p id="d1e1287">Simulation data are stored at the University of Queensland Data Collection and are freely available at <ext-link xlink:href="https://doi.org/10.48610/d7b1654" ext-link-type="DOI">10.48610/d7b1654</ext-link> (Callaghan, 2022).</p>
  </notes><app-group>
        <supplementary-material position="anchor"><p id="d1e1293">The supplement related to this article is available online at: <inline-supplementary-material xlink:href="https://doi.org/10.5194/nhess-22-2459-2022-supplement" xlink:title="pdf">https://doi.org/10.5194/nhess-22-2459-2022-supplement</inline-supplementary-material>.</p></supplementary-material>
        </app-group><notes notes-type="authorcontribution"><title>Author contributions</title>

      <p id="d1e1302">DPC led methodology, software development, model validations and
visualization, and formal analysis with substantive contributions in each of
these by MGH. MGH led conceptualization, resources (climate model forcing),
project administration and project funding acquisition. DPC and MGH
contributed to writing, original draft preparation, reviewing and
editing.</p>
  </notes><notes notes-type="competinginterests"><title>Competing interests</title>

      <p id="d1e1308">The contact author has declared that neither of the authors has any competing interests.</p>
  </notes><notes notes-type="disclaimer"><title>Disclaimer</title>

      <p id="d1e1314">Publisher’s note: Copernicus Publications remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.</p>
  </notes><ack><title>Acknowledgements</title><p id="d1e1320">The high-performance computing was supported by Queensland Cyber
Infrastructure Foundation and The University of Queensland. The support from
Matthew Riley and Tim Pritchard in initiating the project is greatly
appreciated.</p></ack><notes notes-type="financialsupport"><title>Financial support</title>

      <p id="d1e1325">This research has been supported by the New South Wales Government (grant no. 4500812695).</p>
  </notes><notes notes-type="reviewstatement"><title>Review statement</title>

      <p id="d1e1331">This paper was edited by Brunella Bonaccorso and reviewed by Jesper Neilsen and one anonymous referee.</p>
  </notes><ref-list>
    <title>References</title>

      <ref id="bib1.bib1"><label>1</label><?label 1?><mixed-citation>Ahmadisharaf, E., Kalyanapu, A. J., and Bates, P. D.: A probabilistic
framework for floodplain mapping using hydrological modeling and unsteady
hydraulic modeling, Hydrol. Sci. J., 63, 1759–1775,
<ext-link xlink:href="https://doi.org/10.1080/02626667.2018.1525615" ext-link-type="DOI">10.1080/02626667.2018.1525615</ext-link>, 2018.</mixed-citation></ref>
      <ref id="bib1.bib2"><label>2</label><?label 1?><mixed-citation>Altenau, E. H., Pavelsky, T. M., Bates, P. D., and Neal, J. C.: The effects
of spatial resolution and dimensionality on modeling regional-scale
hydraulics in a multichannel river, Water Resour. Res., 53, 1683–1701,
<ext-link xlink:href="https://doi.org/10.1002/2016wr019396" ext-link-type="DOI">10.1002/2016wr019396</ext-link>, 2017.</mixed-citation></ref>
      <ref id="bib1.bib3"><label>3</label><?label 1?><mixed-citation>Amarnath, G., Umer, Y. M., Alahacoon, N., and Inada, Y.: Modelling the flood-risk extent using LISFLOOD-FP in a complex watershed: case study of Mundeni Aru River Basin, Sri Lanka, Proc. IAHS, 370, 131–138, <ext-link xlink:href="https://doi.org/10.5194/piahs-370-131-2015" ext-link-type="DOI">10.5194/piahs-370-131-2015</ext-link>, 2015.</mixed-citation></ref>
      <ref id="bib1.bib4"><label>4</label><?label 1?><mixed-citation>Anonymous: Rural floodplain management plans: Background document to the
floodplain management plan for the Gwydir Valley Floodplain, NSW Department
of Primary Industries: Water, ISBN 978-1-74256-821-8, <uri>https://www.industry.nsw.gov.au/__data/assets/pdf_file/0018/146052/gwydir-fmp-background-document.pdf</uri> (last access: 1 July 2021), 2015.</mixed-citation></ref>
      <ref id="bib1.bib5"><label>5</label><?label 1?><mixed-citation>Apel, H., Merz, B., and Thieken, A. H.: Quantification of uncertainties in
flood risk assessments, International Journal of River Basin Management, 6,
149–162, <ext-link xlink:href="https://doi.org/10.1080/15715124.2008.9635344" ext-link-type="DOI">10.1080/15715124.2008.9635344</ext-link>, 2008.</mixed-citation></ref>
      <ref id="bib1.bib6"><label>6</label><?label 1?><mixed-citation>Apel, H., Aronica, G. T., Kreibich, H., and Thieken, A. H.: Flood risk
analyses-how detailed do we need to be?, Nat. Hazards, 49, 79–98,
<ext-link xlink:href="https://doi.org/10.1007/s11069-008-9277-8" ext-link-type="DOI">10.1007/s11069-008-9277-8</ext-link>, 2009.</mixed-citation></ref>
      <ref id="bib1.bib7"><label>7</label><?label 1?><mixed-citation>Ball, J., Babister, M., Nathan, R., Weeks, W., Weinmann, E., Retallick, M.,
and Testoni, I.: Australian Rainfall and Runoff: A Guide to Flood
Estimation, <uri>http://www.arr-software.org/arrdocs.html</uri> (last access: 26 July 2022), 2019.</mixed-citation></ref>
      <ref id="bib1.bib8"><label>8</label><?label 1?><mixed-citation>Bates, P. D., Dawson, R. J., Hall, J. W., Matthew, S. H. F., Nicholls, R.
J., Wicks, J., and Hassan, M.: Simplified two-dimensional numerical
modelling of coastal flooding and example applications, Coast. Eng., 52,
793–810, <ext-link xlink:href="https://doi.org/10.1016/j.coastaleng.2005.06.001" ext-link-type="DOI">10.1016/j.coastaleng.2005.06.001</ext-link>, 2005.</mixed-citation></ref>
      <ref id="bib1.bib9"><label>9</label><?label 1?><mixed-citation>Bates, P. D., Horritt, M. S., and Fewtrell, T. J.: A simple inertial
formulation of the shallow water equations for efficient two-dimensional
flood inundation modelling, J. Hydrol., 387, 33–45,
<ext-link xlink:href="https://doi.org/10.1016/j.jhydrol.2010.03.027" ext-link-type="DOI">10.1016/j.jhydrol.2010.03.027</ext-link>, 2010.</mixed-citation></ref>
      <ref id="bib1.bib10"><label>10</label><?label 1?><mixed-citation>Bernini, A. and Franchini, M.: A Rapid Model for Delimiting Flooded Areas,
Water Resour. Manag., 27, 3825–3846, <ext-link xlink:href="https://doi.org/10.1007/s11269-013-0383-3" ext-link-type="DOI">10.1007/s11269-013-0383-3</ext-link>, 2013.</mixed-citation></ref>
      <ref id="bib1.bib11"><label>11</label><?label 1?><mixed-citation>Callaghan, D.: Gwydir River hydraulic model results using regional climate projections,  The University of Queensland Data Collection [data set], <ext-link xlink:href="https://doi.org/10.48610/d7b1654" ext-link-type="DOI">10.48610/d7b1654</ext-link>, 2022.</mixed-citation></ref>
      <ref id="bib1.bib12"><label>12</label><?label 1?><mixed-citation>Cloke, H. L., Wetterhall, F., He, Y., Freer, J. E., and Pappenberger, F.:
Modelling climate impact on floods with ensemble climate projections,
Q. J. Roy. Meteorol. Soc., 139, 282–297,
<ext-link xlink:href="https://doi.org/10.1002/qj.1998" ext-link-type="DOI">10.1002/qj.1998</ext-link>, 2013.</mixed-citation></ref>
      <ref id="bib1.bib13"><label>13</label><?label 1?><mixed-citation>Costabile, P., Costanzo, C., and Macchione, F.: Performances and limitations
of the diffusive approximation of the 2-d shallow water equations for flood
simulation in urban and rural areas, Appl. Numer. Math., 116,
141–156, <ext-link xlink:href="https://doi.org/10.1016/j.apnum.2016.07.003" ext-link-type="DOI">10.1016/j.apnum.2016.07.003</ext-link>, 2017.</mixed-citation></ref>
      <ref id="bib1.bib14"><label>14</label><?label 1?><mixed-citation>Coulthard, T. J., Neal, J. C., Bates, P. D., Ramirez, J., de Almeida, G. A.
M., and Hancock, G. R.: Integrating the LISFLOOD-FP 2D hydrodynamic model
with the CAESAR model: implications for modelling landscape evolution, Earth
Surf. Proc. Land., 38, 1897–1906, <ext-link xlink:href="https://doi.org/10.1002/esp.3478" ext-link-type="DOI">10.1002/esp.3478</ext-link>, 2013.</mixed-citation></ref>
      <ref id="bib1.bib15"><label>15</label><?label 1?><mixed-citation>Delgado, J. M., Merz, B., and Apel, H.: Projecting flood hazard under climate change: an alternative approach to model chains, Nat. Hazards Earth Syst. Sci., 14, 1579–1589, <ext-link xlink:href="https://doi.org/10.5194/nhess-14-1579-2014" ext-link-type="DOI">10.5194/nhess-14-1579-2014</ext-link>, 2014.</mixed-citation></ref>
      <ref id="bib1.bib16"><label>16</label><?label 1?><mixed-citation>De Roo, A. P. J., Wesseling, C. G., and Van Deursen, W. P. A.: Physically
based river basin modelling within a GIS: the LISFLOOD model, Hydrol.
Process., 14, 1981–1992, <ext-link xlink:href="https://doi.org/10.1002/1099-1085(20000815/30)14:11/12&lt;1981::Aid-hyp49&gt;3.0.Co;2-f" ext-link-type="DOI">10.1002/1099-1085(20000815/30)14:11/12&lt;1981::Aid-hyp49&gt;3.0.Co;2-f</ext-link>, 2000.</mixed-citation></ref>
      <ref id="bib1.bib17"><label>17</label><?label 1?><mixed-citation>Dottori, F. and Todini, E.: Testing a simple 2D hydraulic model in an urban
flood experiment, Hydrol. Process., 27, 1301–1320, <ext-link xlink:href="https://doi.org/10.1002/hyp.9370" ext-link-type="DOI">10.1002/hyp.9370</ext-link>, 2013.</mixed-citation></ref>
      <ref id="bib1.bib18"><label>18</label><?label 1?><mixed-citation>Ekström, M., Grose, M. R., and Whetton, P. H.: An appraisal of
downscaling methods used in climate change research, WIREs Climate Change,
6, 301–319, <ext-link xlink:href="https://doi.org/10.1002/wcc.339" ext-link-type="DOI">10.1002/wcc.339</ext-link>, 2015.</mixed-citation></ref>
      <ref id="bib1.bib19"><label>19</label><?label 1?><mixed-citation>Evans, J. P., Ji, F., Lee, C., Smith, P., Argüeso, D., and Fita, L.: Design of a regional climate modelling projection ensemble experiment – NARCliM, Geosci. Model Dev., 7, 621–629, <ext-link xlink:href="https://doi.org/10.5194/gmd-7-621-2014" ext-link-type="DOI">10.5194/gmd-7-621-2014</ext-link>, 2014.</mixed-citation></ref>
      <ref id="bib1.bib20"><label>20</label><?label 1?><mixed-citation>Evans, J. P., Di Virgilio, G., Hirsch, A. L., Hoffmann, P., Remedio, A. R.,
Ji, F., Rockel, B., and Coppola, E.: The CORDEX-Australasia ensemble:
evaluation and future projections, Clim. Dynam., 57, 1385–1401,
<ext-link xlink:href="https://doi.org/10.1007/s00382-020-05459-0" ext-link-type="DOI">10.1007/s00382-020-05459-0</ext-link>, 2021.</mixed-citation></ref>
      <ref id="bib1.bib21"><label>21</label><?label 1?><mixed-citation>Falter, D., Vorogushyn, S., Lhomme, J., Apel, H., Gouldby, B., and Merz, B.:
Hydraulic model evaluation for large-scale flood risk assessments, Hydrol.
Process., 27, 1331–1340, <ext-link xlink:href="https://doi.org/10.1002/hyp.9553" ext-link-type="DOI">10.1002/hyp.9553</ext-link>, 2013.</mixed-citation></ref>
      <ref id="bib1.bib22"><label>22</label><?label 1?><mixed-citation>Fewtrell, T. J., Duncan, A., Sampson, C. C., Neal, J. C., and Bates, P. D.:
Benchmarking urban flood models of varying complexity and scale using high
resolution terrestrial LiDAR data, Phys. Chem. Earth, 36, 281–291,
<ext-link xlink:href="https://doi.org/10.1016/j.pce.2010.12.011" ext-link-type="DOI">10.1016/j.pce.2010.12.011</ext-link>, 2011.</mixed-citation></ref>
      <ref id="bib1.bib23"><label>23</label><?label 1?><mixed-citation>Ghimire, B., Chen, A. S., Guidolin, M., Keedwell, E. C., Djordjevic, S., and
Savic, D. A.: Formulation of a fast 2D urban pluvial flood model using a
cellular automata approach, J. Hydroinform., 15, 676–686,
<ext-link xlink:href="https://doi.org/10.2166/hydro.2012.245" ext-link-type="DOI">10.2166/hydro.2012.245</ext-link>, 2013.</mixed-citation></ref>
      <ref id="bib1.bib24"><label>24</label><?label 1?><mixed-citation>Giorgi, F.: Climate change hot-spots, Geophys. Res. Lett., 33,  L08707, <ext-link xlink:href="https://doi.org/10.1029/2006GL025734" ext-link-type="DOI">10.1029/2006GL025734</ext-link>, 2006.</mixed-citation></ref>
      <ref id="bib1.bib25"><label>25</label><?label 1?><mixed-citation>Gouldby, B., Sayers, P., Mulet-Marti, J., Hassan, M., and Benwell, D.: A
methodology for regional-scale flood risk assessment, Proceedings of the
Institution of Civil Engineers-Water Management, 161, 169–182,
<ext-link xlink:href="https://doi.org/10.1680/wama.2008.161.3.169" ext-link-type="DOI">10.1680/wama.2008.161.3.169</ext-link>, 2008.</mixed-citation></ref>
      <ref id="bib1.bib26"><label>26</label><?label 1?><mixed-citation>Guidolin, M., Chen, A. S., Ghimire, B., Keedwell, E. C., Djordjevic, S., and
Savic, D. A.: A weighted cellular automata 2D inundation model for rapid
flood analysis, Environ. Model. Softw., 84, 378–394,
<ext-link xlink:href="https://doi.org/10.1016/j.envsoft.2016.07.008" ext-link-type="DOI">10.1016/j.envsoft.2016.07.008</ext-link>, 2016.</mixed-citation></ref>
      <ref id="bib1.bib27"><label>27</label><?label 1?><mixed-citation>Hall, J. W., Dawson, R. J., Sayers, P. B., Rosu, C., Chatterton, J. B., and
Deakin, R.: A methodology for national-scale flood risk assessment,
Proceedings of the Institution of Civil Engineers-Water and Maritime
Engineering, 156, 235–247, <ext-link xlink:href="https://doi.org/10.1680/wame.2003.156.3.235" ext-link-type="DOI">10.1680/wame.2003.156.3.235</ext-link>, 2003.</mixed-citation></ref>
      <ref id="bib1.bib28"><label>28</label><?label 1?><mixed-citation>Henderson, F. M.: Open channel flow, Macmillan series in civil engineering,
Macmillan, New York, 522 pp., ISBN 0023535105, 1966.</mixed-citation></ref>
      <ref id="bib1.bib29"><label>29</label><?label 1?><mixed-citation>Hirabayashi, Y., Mahendran, R., Koirala, S., Konoshima, L., Yamazaki, D.,
Watanabe, S., Kim, H., and Kanae, S.: Global flood risk under climate
change, Nat. Clim. Chang., 3, 816–821, <ext-link xlink:href="https://doi.org/10.1038/nclimate1911" ext-link-type="DOI">10.1038/nclimate1911</ext-link>, 2013.</mixed-citation></ref>
      <ref id="bib1.bib30"><label>30</label><?label 1?><mixed-citation>Hoch, J. M., Neal, J. C., Baart, F., van Beek, R., Winsemius, H. C., Bates, P. D., and Bierkens, M. F. P.: GLOFRIM v1.0 – A globally applicable computational framework for integrated hydrological–hydrodynamic modelling, Geosci. Model Dev., 10, 3913–3929, <ext-link xlink:href="https://doi.org/10.5194/gmd-10-3913-2017" ext-link-type="DOI">10.5194/gmd-10-3913-2017</ext-link>, 2017.</mixed-citation></ref>
      <ref id="bib1.bib31"><label>31</label><?label 1?><mixed-citation>Jamali, B., Bach, P. M., Cunningham, L., and Deletic, A.: A Cellular
Automata Fast Flood Evaluation (CA-ffe) Model, Water Resour. Res., 55,
4936–4953, <ext-link xlink:href="https://doi.org/10.1029/2018wr023679" ext-link-type="DOI">10.1029/2018wr023679</ext-link>, 2019.</mixed-citation></ref>
      <ref id="bib1.bib32"><label>32</label><?label 1?><mixed-citation>Jamieson, S. R., Lhomme, J., Wright, G., and Gouldby, B.: A highly efficient
2D flood model with sub-element topography, Proceedings of the Institution
of Civil Engineers-Water Management, 165, 581–595, <ext-link xlink:href="https://doi.org/10.1680/wama.12.00021" ext-link-type="DOI">10.1680/wama.12.00021</ext-link>,
2012.</mixed-citation></ref>
      <ref id="bib1.bib33"><label>33</label><?label 1?><mixed-citation>Janizadeh, S., Chandra Pal, S., Saha, A., Chowdhuri, I., Ahmadi, K.,
Mirzaei, S., Mosavi, A. H., and Tiefenbacher, J. P.: Mapping the spatial and
temporal variability of flood hazard affected by climate and land-use
changes in the future, J. Environ. Manag., 298, 113551,
<ext-link xlink:href="https://doi.org/10.1016/j.jenvman.2021.113551" ext-link-type="DOI">10.1016/j.jenvman.2021.113551</ext-link>, 2021.</mixed-citation></ref>
      <ref id="bib1.bib34"><label>34</label><?label 1?><mixed-citation>Laprise, R.: Regional climate modelling, J. Comput. Phys.,
227, 3641–3666, <ext-link xlink:href="https://doi.org/10.1016/j.jcp.2006.10.024" ext-link-type="DOI">10.1016/j.jcp.2006.10.024</ext-link>,
2008.</mixed-citation></ref>
      <ref id="bib1.bib35"><label>35</label><?label 1?><mixed-citation>Lewis, M., Horsburgh, K., Bates, P., and Smith, R.: Quantifying the
Uncertainty in Future Coastal Flood Risk Estimates for the UK, J.
Coast. Res., 27, 870–881, <ext-link xlink:href="https://doi.org/10.2112/jcoastres-d-10-00147.1" ext-link-type="DOI">10.2112/jcoastres-d-10-00147.1</ext-link>, 2011.</mixed-citation></ref>
      <ref id="bib1.bib36"><label>36</label><?label 1?><mixed-citation>Lhomme, J., Sayers, P., Gouldby, B., Samuels, P., Wills, M., and Mulet-Marti, J.: Recent development and application of a rapid 5 flood spreading method, in: Flood Risk Management: Research and Practice (CD-ROM), edited by: Samuels, P., Huntington, S., Allsop, W., and Harrop, J., Taylor &amp; Francis Group, London, ISBN 978-0-415-48507-4, 2009.</mixed-citation></ref>
      <ref id="bib1.bib37"><label>37</label><?label 1?><mixed-citation>Lhomme, J., Gutierrez-Andres, J., Weisgerber, A., Davison, M., Mulet-Marti,
J., Cooper, A., and Gouldby, B.: Testing a new two-dimensional flood
modelling system: analytical tests and application to a flood event,
J. Flood Risk Manag., 3, 33–51, <ext-link xlink:href="https://doi.org/10.1111/j.1753-318X.2009.01053.x" ext-link-type="DOI">10.1111/j.1753-318X.2009.01053.x</ext-link>, 2010.</mixed-citation></ref>
      <ref id="bib1.bib38"><label>38</label><?label 1?><mixed-citation>Mason, D. C., Bates, P. D., and Amico, J. T. D.: Calibration of uncertain
flood inundation models using remotely sensed water levels, J. Hydrol., 368,
224–236, <ext-link xlink:href="https://doi.org/10.1016/j.jhydrol.2009.02.034" ext-link-type="DOI">10.1016/j.jhydrol.2009.02.034</ext-link>, 2009.</mixed-citation></ref>
      <ref id="bib1.bib39"><label>39</label><?label 1?><mixed-citation>
Mein, R. G., Laurenson, E. M., and McMahon, T. A.: Simple nonlinear model
for flood estimation, Journal of the Hydraulics Division, Proceedings of the
American Society of Civil Engineers, 100, 1507–1518, 1974.</mixed-citation></ref>
      <ref id="bib1.bib40"><label>40</label><?label 1?><mixed-citation>
Miller, J. E.: Basic Concepts of Kinematic-Wave Models, U. S. Geological
Survey, Washington, USA, 36, 1984.</mixed-citation></ref>
      <ref id="bib1.bib41"><label>41</label><?label 1?><mixed-citation>Montanari, M., Hostache, R., Matgen, P., Schumann, G., Pfister, L., and Hoffmann, L.: Calibration and sequential updating of a coupled hydrologic-hydraulic model using remote sensing-derived water stages, Hydrol. Earth Syst. Sci., 13, 367–380, <ext-link xlink:href="https://doi.org/10.5194/hess-13-367-2009" ext-link-type="DOI">10.5194/hess-13-367-2009</ext-link>, 2009.</mixed-citation></ref>
      <ref id="bib1.bib42"><label>42</label><?label 1?><mixed-citation>Neal, J., Schumann, G., Fewtrell, T., Budimir, M., Bates, P., and Mason, D.:
Evaluating a new LISFLOOD-FP formulation with data from the summer 2007
floods in Tewkesbury, UK, J. Flood Risk Manag., 4, 88–95,
<ext-link xlink:href="https://doi.org/10.1111/j.1753-318X.2011.01093.x" ext-link-type="DOI">10.1111/j.1753-318X.2011.01093.x</ext-link>, 2011.</mixed-citation></ref>
      <ref id="bib1.bib43"><label>43</label><?label 1?><mixed-citation>Neal, J., Villanueva, I., Wright, N., Willis, T., Fewtrell, T., and Bates,
P.: How much physical complexity is needed to model flood inundation?,
Hydrol. Process., 26, 2264–2282, <ext-link xlink:href="https://doi.org/10.1002/hyp.8339" ext-link-type="DOI">10.1002/hyp.8339</ext-link>, 2012.</mixed-citation></ref>
      <ref id="bib1.bib44"><label>44</label><?label 1?><mixed-citation>Neal, J., Keef, C., Bates, P., Beven, K., and Leedal, D.: Probabilistic
flood risk mapping including spatial dependence, Hydrol. Process., 27,
1349–1363, <ext-link xlink:href="https://doi.org/10.1002/hyp.9572" ext-link-type="DOI">10.1002/hyp.9572</ext-link>, 2013.</mixed-citation></ref>
      <ref id="bib1.bib45"><label>45</label><?label 1?><mixed-citation>Nicholas, A. P., Thomas, R., and Quine, T. A.: Cellular modelling of braided
river form and process, in: Braided Rivers: Process, Deposits, Ecology and
Management, edited by: Smith, G. H. S., Best, J. L., Bristow, C. S., and
Petts, G. E., Special Publications of the International Association of
Sedimentologists, 137–151, <ext-link xlink:href="https://doi.org/10.1002/9781444304374.ch6" ext-link-type="DOI">10.1002/9781444304374.ch6</ext-link>, 2006.</mixed-citation></ref>
      <ref id="bib1.bib46"><label>46</label><?label 1?><mixed-citation>Nishant, N., Evans, J. P., Di Virgilio, G., Downes, S. M., Ji, F., Cheung,
K. K. W., Tam, E., Miller, J., Beyer, K., and Riley, M. L.: Introducing
NARCliM1.5: Evaluating the Performance of Regional Climate Projections for
Southeast Australia for 1950–2100, Earth's Future, 9, e2020EF001833,
<ext-link xlink:href="https://doi.org/10.1029/2020EF001833" ext-link-type="DOI">10.1029/2020EF001833</ext-link>, 2021.</mixed-citation></ref>
      <ref id="bib1.bib47"><label>47</label><?label 1?><mixed-citation>O'Loughlin, F. E., Neal, J., Schumann, G. J. P., Beighley, E., and Bates, P.
D.: A LISFLOOD-FP hydraulic model of the middle reach of the Congo, J.
Hydrol., 580, 124203, <ext-link xlink:href="https://doi.org/10.1016/j.jhydrol.2019.124203" ext-link-type="DOI">10.1016/j.jhydrol.2019.124203</ext-link>, 2020.</mixed-citation></ref>
      <ref id="bib1.bib48"><label>48</label><?label 1?><mixed-citation>Prudhomme, C., Wilby, R. L., Crooks, S., Kay, A. L., and Reynard, N. S.:
Scenario-neutral approach to climate change impact studies: Application to
flood risk, J. Hydrol., 390, 198–209,
<ext-link xlink:href="https://doi.org/10.1016/j.jhydrol.2010.06.043" ext-link-type="DOI">10.1016/j.jhydrol.2010.06.043</ext-link>, 2010.</mixed-citation></ref>
      <ref id="bib1.bib49"><label>49</label><?label 1?><mixed-citation>Rajib, A., Liu, Z., Merwade, V., Tavakoly, A. A., and Follum, M. L.: Towards
a large-scale locally relevant flood inundation modeling framework using
SWAT and LISFLOOD-FP, J. Hydrol., 581, 124406, <ext-link xlink:href="https://doi.org/10.1016/j.jhydrol.2019.124406" ext-link-type="DOI">10.1016/j.jhydrol.2019.124406</ext-link>, 2020.</mixed-citation></ref>
      <ref id="bib1.bib50"><label>50</label><?label 1?><mixed-citation>Ryu, J.-H., Kim, J.-E., Lee, J.-Y., Kwon, H.-H., and Kim, T.-W.: Estimating
Optimal Design Frequency and Future Hydrological Risk in Local River Basins
According to RCP Scenarios, Water, 14,  945, <ext-link xlink:href="https://doi.org/10.3390/w14060945" ext-link-type="DOI">10.3390/w14060945</ext-link>, 2022.</mixed-citation></ref>
      <ref id="bib1.bib51"><label>51</label><?label 1?><mixed-citation>Sampson, C. C., Smith, A. M., Bates, P. B., Neal, J. C., Alfieri, L., and
Freer, J. E.: A high-resolution global flood hazard model, Water Resour.
Res., 51, 7358–7381, <ext-link xlink:href="https://doi.org/10.1002/2015wr016954" ext-link-type="DOI">10.1002/2015wr016954</ext-link>, 2015.</mixed-citation></ref>
      <ref id="bib1.bib52"><label>52</label><?label 1?><mixed-citation>Schmidli, J., Frei, C., and Vidale, P. L.: Downscaling from GCM
precipitation: a benchmark for dynamical and statistical downscaling
methods, Int. J. Climatol., 26, 679–689, <ext-link xlink:href="https://doi.org/10.1002/joc.1287" ext-link-type="DOI">10.1002/joc.1287</ext-link>, 2006.</mixed-citation></ref>
      <ref id="bib1.bib53"><label>53</label><?label 1?><mixed-citation>
Schumann, G. J. P., Neal, J. C., and Bates, P. D.: Global scale simulation
of flood plain inundation with low resolution space-borne data, in: Remote
Sensing and Hydrology, edited by: Neale, C. M. U., and Cosh, M. H., IAHS
Publication, 464–467, 2012.</mixed-citation></ref>
      <ref id="bib1.bib54"><label>54</label><?label 1?><mixed-citation>Schumann, G. J. P., Neal, J. C., Voisin, N., Andreadis, K. M., Pappenberger,
F., Phanthuwongpakdee, N., Hall, A. C., and Bates, P. D.: A first
large-scale flood inundation forecasting model, Water Resour. Res., 49,
6248–6257, <ext-link xlink:href="https://doi.org/10.1002/wrcr.20521" ext-link-type="DOI">10.1002/wrcr.20521</ext-link>, 2013.</mixed-citation></ref>
      <ref id="bib1.bib55"><label>55</label><?label 1?><mixed-citation>Shrestha, S. and Lohpaisankrit, W.: Flood hazard assessment under climate
change scenarios in the Yang River Basin, Thailand,
International Journal of Sustainable Built Environment, 6, 285–298, <ext-link xlink:href="https://doi.org/10.1016/j.ijsbe.2016.09.006" ext-link-type="DOI">10.1016/j.ijsbe.2016.09.006</ext-link>, 2017.</mixed-citation></ref>
      <ref id="bib1.bib56"><label>56</label><?label 1?><mixed-citation>Skinner, C. J., Coulthard, T. J., Parsons, D. R., Ramirez, J. A., Mullen,
L., and Manson, S.: Simulating tidal and storm surge hydraulics with a
simple 2D inertia based model, in the Humber Estuary, U.K, Estuar. Coast. Shelf Sci., 155, 126–136, <ext-link xlink:href="https://doi.org/10.1016/j.ecss.2015.01.019" ext-link-type="DOI">10.1016/j.ecss.2015.01.019</ext-link>, 2015.</mixed-citation></ref>
      <ref id="bib1.bib57"><label>57</label><?label 1?><mixed-citation>Smith, A., Bates, P., Freer, J., and Wetterhall, F.: Investigating the
application of climate models in flood projection across the UK, Hydrol.
Process., 28, 2810–2823, <ext-link xlink:href="https://doi.org/10.1002/hyp.9815" ext-link-type="DOI">10.1002/hyp.9815</ext-link>, 2014a.</mixed-citation></ref>
      <ref id="bib1.bib58"><label>58</label><?label 1?><mixed-citation>Smith, G. P., Davey, E. K., and Cox, R. J.: Flood Hazard, Water Research
Laboratory, The University of New South Wales, Sydney, AustraliaWRL
Technical Report 2014/07, 59, 2014b.</mixed-citation></ref>
      <ref id="bib1.bib59"><label>59</label><?label 1?><mixed-citation>Timbal, B. and Jones, D. A.: Future projections of winter rainfall in
southeast Australia using a statistical downscaling technique, Climatic
Change, 86, 165–187, <ext-link xlink:href="https://doi.org/10.1007/s10584-007-9279-7" ext-link-type="DOI">10.1007/s10584-007-9279-7</ext-link>, 2008.</mixed-citation></ref>
      <ref id="bib1.bib60"><label>60</label><?label 1?><mixed-citation>Wilby, R. L., Wigley, T. M. L., Conway, D., Jones, P. D., Hewitson, B. C.,
Main, J., and Wilks, D. S.: Statistical downscaling of general circulation
model output: A comparison of methods, Water Resour. Res., 34, 2995–3008,
<ext-link xlink:href="https://doi.org/10.1029/98WR02577" ext-link-type="DOI">10.1029/98WR02577</ext-link>, 1998.</mixed-citation></ref>
      <ref id="bib1.bib61"><label>61</label><?label 1?><mixed-citation>Zheng, H., Huang, E., and Luo, M.: Applicability of Kinematic Wave Model for
Flood Routing under Unsteady Inflow, Water, 12, 2528, <ext-link xlink:href="https://doi.org/10.3390/w12092528" ext-link-type="DOI">10.3390/w12092528</ext-link>, 2020.</mixed-citation></ref>
      <ref id="bib1.bib62"><label>62</label><?label 1?><mixed-citation>Zheng, X., Maidment, D. R., Tarboton, D. G., Liu, Y. Y., and Passalacqua,
P.: GeoFlood: Large-Scale Flood Inundation Mapping Based on High-Resolution
Terrain Analysis, Water Resour. Res., 54, 10013–10033, <ext-link xlink:href="https://doi.org/10.1029/2018wr023457" ext-link-type="DOI">10.1029/2018wr023457</ext-link>,
2018.</mixed-citation></ref>

  </ref-list></back>
    <!--<article-title-html>Assessing flood hazard changes using climate model forcing</article-title-html>
<abstract-html/>
<ref-html id="bib1.bib1"><label>1</label><mixed-citation>
Ahmadisharaf, E., Kalyanapu, A. J., and Bates, P. D.: A probabilistic
framework for floodplain mapping using hydrological modeling and unsteady
hydraulic modeling, Hydrol. Sci. J., 63, 1759–1775,
<a href="https://doi.org/10.1080/02626667.2018.1525615" target="_blank">https://doi.org/10.1080/02626667.2018.1525615</a>, 2018.
</mixed-citation></ref-html>
<ref-html id="bib1.bib2"><label>2</label><mixed-citation>
Altenau, E. H., Pavelsky, T. M., Bates, P. D., and Neal, J. C.: The effects
of spatial resolution and dimensionality on modeling regional-scale
hydraulics in a multichannel river, Water Resour. Res., 53, 1683–1701,
<a href="https://doi.org/10.1002/2016wr019396" target="_blank">https://doi.org/10.1002/2016wr019396</a>, 2017.
</mixed-citation></ref-html>
<ref-html id="bib1.bib3"><label>3</label><mixed-citation>
Amarnath, G., Umer, Y. M., Alahacoon, N., and Inada, Y.: Modelling the flood-risk extent using LISFLOOD-FP in a complex watershed: case study of Mundeni Aru River Basin, Sri Lanka, Proc. IAHS, 370, 131–138, <a href="https://doi.org/10.5194/piahs-370-131-2015" target="_blank">https://doi.org/10.5194/piahs-370-131-2015</a>, 2015.
</mixed-citation></ref-html>
<ref-html id="bib1.bib4"><label>4</label><mixed-citation>Anonymous: Rural floodplain management plans: Background document to the
floodplain management plan for the Gwydir Valley Floodplain, NSW Department
of Primary Industries: Water, ISBN 978-1-74256-821-8, <a href="https://www.industry.nsw.gov.au/__data/assets/pdf_file/0018/146052/gwydir-fmp-background-document.pdf" target="_blank"/> (last access: 1 July 2021), 2015.
</mixed-citation></ref-html>
<ref-html id="bib1.bib5"><label>5</label><mixed-citation>Apel, H., Merz, B., and Thieken, A. H.: Quantification of uncertainties in
flood risk assessments, International Journal of River Basin Management, 6,
149–162, <a href="https://doi.org/10.1080/15715124.2008.9635344" target="_blank">https://doi.org/10.1080/15715124.2008.9635344</a>, 2008.
</mixed-citation></ref-html>
<ref-html id="bib1.bib6"><label>6</label><mixed-citation>Apel, H., Aronica, G. T., Kreibich, H., and Thieken, A. H.: Flood risk
analyses-how detailed do we need to be?, Nat. Hazards, 49, 79–98,
<a href="https://doi.org/10.1007/s11069-008-9277-8" target="_blank">https://doi.org/10.1007/s11069-008-9277-8</a>, 2009.
</mixed-citation></ref-html>
<ref-html id="bib1.bib7"><label>7</label><mixed-citation>Ball, J., Babister, M., Nathan, R., Weeks, W., Weinmann, E., Retallick, M.,
and Testoni, I.: Australian Rainfall and Runoff: A Guide to Flood
Estimation, <a href="http://www.arr-software.org/arrdocs.html" target="_blank"/> (last access: 26 July 2022), 2019.
</mixed-citation></ref-html>
<ref-html id="bib1.bib8"><label>8</label><mixed-citation>Bates, P. D., Dawson, R. J., Hall, J. W., Matthew, S. H. F., Nicholls, R.
J., Wicks, J., and Hassan, M.: Simplified two-dimensional numerical
modelling of coastal flooding and example applications, Coast. Eng., 52,
793–810, <a href="https://doi.org/10.1016/j.coastaleng.2005.06.001" target="_blank">https://doi.org/10.1016/j.coastaleng.2005.06.001</a>, 2005.
</mixed-citation></ref-html>
<ref-html id="bib1.bib9"><label>9</label><mixed-citation>
Bates, P. D., Horritt, M. S., and Fewtrell, T. J.: A simple inertial
formulation of the shallow water equations for efficient two-dimensional
flood inundation modelling, J. Hydrol., 387, 33–45,
<a href="https://doi.org/10.1016/j.jhydrol.2010.03.027" target="_blank">https://doi.org/10.1016/j.jhydrol.2010.03.027</a>, 2010.
</mixed-citation></ref-html>
<ref-html id="bib1.bib10"><label>10</label><mixed-citation>Bernini, A. and Franchini, M.: A Rapid Model for Delimiting Flooded Areas,
Water Resour. Manag., 27, 3825–3846, <a href="https://doi.org/10.1007/s11269-013-0383-3" target="_blank">https://doi.org/10.1007/s11269-013-0383-3</a>, 2013.
</mixed-citation></ref-html>
<ref-html id="bib1.bib11"><label>11</label><mixed-citation>
Callaghan, D.: Gwydir River hydraulic model results using regional climate projections,  The University of Queensland Data Collection [data set], <a href="https://doi.org/10.48610/d7b1654" target="_blank">https://doi.org/10.48610/d7b1654</a>, 2022.
</mixed-citation></ref-html>
<ref-html id="bib1.bib12"><label>12</label><mixed-citation>Cloke, H. L., Wetterhall, F., He, Y., Freer, J. E., and Pappenberger, F.:
Modelling climate impact on floods with ensemble climate projections,
Q. J. Roy. Meteorol. Soc., 139, 282–297,
<a href="https://doi.org/10.1002/qj.1998" target="_blank">https://doi.org/10.1002/qj.1998</a>, 2013.
</mixed-citation></ref-html>
<ref-html id="bib1.bib13"><label>13</label><mixed-citation>
Costabile, P., Costanzo, C., and Macchione, F.: Performances and limitations
of the diffusive approximation of the 2-d shallow water equations for flood
simulation in urban and rural areas, Appl. Numer. Math., 116,
141–156, <a href="https://doi.org/10.1016/j.apnum.2016.07.003" target="_blank">https://doi.org/10.1016/j.apnum.2016.07.003</a>, 2017.
</mixed-citation></ref-html>
<ref-html id="bib1.bib14"><label>14</label><mixed-citation>Coulthard, T. J., Neal, J. C., Bates, P. D., Ramirez, J., de Almeida, G. A.
M., and Hancock, G. R.: Integrating the LISFLOOD-FP 2D hydrodynamic model
with the CAESAR model: implications for modelling landscape evolution, Earth
Surf. Proc. Land., 38, 1897–1906, <a href="https://doi.org/10.1002/esp.3478" target="_blank">https://doi.org/10.1002/esp.3478</a>, 2013.
</mixed-citation></ref-html>
<ref-html id="bib1.bib15"><label>15</label><mixed-citation>
Delgado, J. M., Merz, B., and Apel, H.: Projecting flood hazard under climate change: an alternative approach to model chains, Nat. Hazards Earth Syst. Sci., 14, 1579–1589, <a href="https://doi.org/10.5194/nhess-14-1579-2014" target="_blank">https://doi.org/10.5194/nhess-14-1579-2014</a>, 2014.
</mixed-citation></ref-html>
<ref-html id="bib1.bib16"><label>16</label><mixed-citation>
De Roo, A. P. J., Wesseling, C. G., and Van Deursen, W. P. A.: Physically
based river basin modelling within a GIS: the LISFLOOD model, Hydrol.
Process., 14, 1981–1992, <a href="https://doi.org/10.1002/1099-1085(20000815/30)14:11/12&lt;1981::Aid-hyp49&gt;3.0.Co;2-f" target="_blank">https://doi.org/10.1002/1099-1085(20000815/30)14:11/12&lt;1981::Aid-hyp49&gt;3.0.Co;2-f</a>, 2000.
</mixed-citation></ref-html>
<ref-html id="bib1.bib17"><label>17</label><mixed-citation>
Dottori, F. and Todini, E.: Testing a simple 2D hydraulic model in an urban
flood experiment, Hydrol. Process., 27, 1301–1320, <a href="https://doi.org/10.1002/hyp.9370" target="_blank">https://doi.org/10.1002/hyp.9370</a>, 2013.
</mixed-citation></ref-html>
<ref-html id="bib1.bib18"><label>18</label><mixed-citation>
Ekström, M., Grose, M. R., and Whetton, P. H.: An appraisal of
downscaling methods used in climate change research, WIREs Climate Change,
6, 301–319, <a href="https://doi.org/10.1002/wcc.339" target="_blank">https://doi.org/10.1002/wcc.339</a>, 2015.
</mixed-citation></ref-html>
<ref-html id="bib1.bib19"><label>19</label><mixed-citation>
Evans, J. P., Ji, F., Lee, C., Smith, P., Argüeso, D., and Fita, L.: Design of a regional climate modelling projection ensemble experiment – NARCliM, Geosci. Model Dev., 7, 621–629, <a href="https://doi.org/10.5194/gmd-7-621-2014" target="_blank">https://doi.org/10.5194/gmd-7-621-2014</a>, 2014.
</mixed-citation></ref-html>
<ref-html id="bib1.bib20"><label>20</label><mixed-citation>Evans, J. P., Di Virgilio, G., Hirsch, A. L., Hoffmann, P., Remedio, A. R.,
Ji, F., Rockel, B., and Coppola, E.: The CORDEX-Australasia ensemble:
evaluation and future projections, Clim. Dynam., 57, 1385–1401,
<a href="https://doi.org/10.1007/s00382-020-05459-0" target="_blank">https://doi.org/10.1007/s00382-020-05459-0</a>, 2021.
</mixed-citation></ref-html>
<ref-html id="bib1.bib21"><label>21</label><mixed-citation>Falter, D., Vorogushyn, S., Lhomme, J., Apel, H., Gouldby, B., and Merz, B.:
Hydraulic model evaluation for large-scale flood risk assessments, Hydrol.
Process., 27, 1331–1340, <a href="https://doi.org/10.1002/hyp.9553" target="_blank">https://doi.org/10.1002/hyp.9553</a>, 2013.
</mixed-citation></ref-html>
<ref-html id="bib1.bib22"><label>22</label><mixed-citation>
Fewtrell, T. J., Duncan, A., Sampson, C. C., Neal, J. C., and Bates, P. D.:
Benchmarking urban flood models of varying complexity and scale using high
resolution terrestrial LiDAR data, Phys. Chem. Earth, 36, 281–291,
<a href="https://doi.org/10.1016/j.pce.2010.12.011" target="_blank">https://doi.org/10.1016/j.pce.2010.12.011</a>, 2011.
</mixed-citation></ref-html>
<ref-html id="bib1.bib23"><label>23</label><mixed-citation>Ghimire, B., Chen, A. S., Guidolin, M., Keedwell, E. C., Djordjevic, S., and
Savic, D. A.: Formulation of a fast 2D urban pluvial flood model using a
cellular automata approach, J. Hydroinform., 15, 676–686,
<a href="https://doi.org/10.2166/hydro.2012.245" target="_blank">https://doi.org/10.2166/hydro.2012.245</a>, 2013.
</mixed-citation></ref-html>
<ref-html id="bib1.bib24"><label>24</label><mixed-citation>
Giorgi, F.: Climate change hot-spots, Geophys. Res. Lett., 33,  L08707, <a href="https://doi.org/10.1029/2006GL025734" target="_blank">https://doi.org/10.1029/2006GL025734</a>, 2006.
</mixed-citation></ref-html>
<ref-html id="bib1.bib25"><label>25</label><mixed-citation>
Gouldby, B., Sayers, P., Mulet-Marti, J., Hassan, M., and Benwell, D.: A
methodology for regional-scale flood risk assessment, Proceedings of the
Institution of Civil Engineers-Water Management, 161, 169–182,
<a href="https://doi.org/10.1680/wama.2008.161.3.169" target="_blank">https://doi.org/10.1680/wama.2008.161.3.169</a>, 2008.
</mixed-citation></ref-html>
<ref-html id="bib1.bib26"><label>26</label><mixed-citation>
Guidolin, M., Chen, A. S., Ghimire, B., Keedwell, E. C., Djordjevic, S., and
Savic, D. A.: A weighted cellular automata 2D inundation model for rapid
flood analysis, Environ. Model. Softw., 84, 378–394,
<a href="https://doi.org/10.1016/j.envsoft.2016.07.008" target="_blank">https://doi.org/10.1016/j.envsoft.2016.07.008</a>, 2016.
</mixed-citation></ref-html>
<ref-html id="bib1.bib27"><label>27</label><mixed-citation>
Hall, J. W., Dawson, R. J., Sayers, P. B., Rosu, C., Chatterton, J. B., and
Deakin, R.: A methodology for national-scale flood risk assessment,
Proceedings of the Institution of Civil Engineers-Water and Maritime
Engineering, 156, 235–247, <a href="https://doi.org/10.1680/wame.2003.156.3.235" target="_blank">https://doi.org/10.1680/wame.2003.156.3.235</a>, 2003.
</mixed-citation></ref-html>
<ref-html id="bib1.bib28"><label>28</label><mixed-citation>Henderson, F. M.: Open channel flow, Macmillan series in civil engineering,
Macmillan, New York, 522 pp., ISBN 0023535105, 1966.
</mixed-citation></ref-html>
<ref-html id="bib1.bib29"><label>29</label><mixed-citation>
Hirabayashi, Y., Mahendran, R., Koirala, S., Konoshima, L., Yamazaki, D.,
Watanabe, S., Kim, H., and Kanae, S.: Global flood risk under climate
change, Nat. Clim. Chang., 3, 816–821, <a href="https://doi.org/10.1038/nclimate1911" target="_blank">https://doi.org/10.1038/nclimate1911</a>, 2013.
</mixed-citation></ref-html>
<ref-html id="bib1.bib30"><label>30</label><mixed-citation>Hoch, J. M., Neal, J. C., Baart, F., van Beek, R., Winsemius, H. C., Bates, P. D., and Bierkens, M. F. P.: GLOFRIM v1.0 – A globally applicable computational framework for integrated hydrological–hydrodynamic modelling, Geosci. Model Dev., 10, 3913–3929, <a href="https://doi.org/10.5194/gmd-10-3913-2017" target="_blank">https://doi.org/10.5194/gmd-10-3913-2017</a>, 2017.
</mixed-citation></ref-html>
<ref-html id="bib1.bib31"><label>31</label><mixed-citation>
Jamali, B., Bach, P. M., Cunningham, L., and Deletic, A.: A Cellular
Automata Fast Flood Evaluation (CA-ffe) Model, Water Resour. Res., 55,
4936–4953, <a href="https://doi.org/10.1029/2018wr023679" target="_blank">https://doi.org/10.1029/2018wr023679</a>, 2019.
</mixed-citation></ref-html>
<ref-html id="bib1.bib32"><label>32</label><mixed-citation>
Jamieson, S. R., Lhomme, J., Wright, G., and Gouldby, B.: A highly efficient
2D flood model with sub-element topography, Proceedings of the Institution
of Civil Engineers-Water Management, 165, 581–595, <a href="https://doi.org/10.1680/wama.12.00021" target="_blank">https://doi.org/10.1680/wama.12.00021</a>,
2012.
</mixed-citation></ref-html>
<ref-html id="bib1.bib33"><label>33</label><mixed-citation>
Janizadeh, S., Chandra Pal, S., Saha, A., Chowdhuri, I., Ahmadi, K.,
Mirzaei, S., Mosavi, A. H., and Tiefenbacher, J. P.: Mapping the spatial and
temporal variability of flood hazard affected by climate and land-use
changes in the future, J. Environ. Manag., 298, 113551,
<a href="https://doi.org/10.1016/j.jenvman.2021.113551" target="_blank">https://doi.org/10.1016/j.jenvman.2021.113551</a>, 2021.
</mixed-citation></ref-html>
<ref-html id="bib1.bib34"><label>34</label><mixed-citation>
Laprise, R.: Regional climate modelling, J. Comput. Phys.,
227, 3641–3666, <a href="https://doi.org/10.1016/j.jcp.2006.10.024" target="_blank">https://doi.org/10.1016/j.jcp.2006.10.024</a>,
2008.
</mixed-citation></ref-html>
<ref-html id="bib1.bib35"><label>35</label><mixed-citation>
Lewis, M., Horsburgh, K., Bates, P., and Smith, R.: Quantifying the
Uncertainty in Future Coastal Flood Risk Estimates for the UK, J.
Coast. Res., 27, 870–881, <a href="https://doi.org/10.2112/jcoastres-d-10-00147.1" target="_blank">https://doi.org/10.2112/jcoastres-d-10-00147.1</a>, 2011.
</mixed-citation></ref-html>
<ref-html id="bib1.bib36"><label>36</label><mixed-citation>Lhomme, J., Sayers, P., Gouldby, B., Samuels, P., Wills, M., and Mulet-Marti, J.: Recent development and application of a rapid 5 flood spreading method, in: Flood Risk Management: Research and Practice (CD-ROM), edited by: Samuels, P., Huntington, S., Allsop, W., and Harrop, J., Taylor &amp; Francis Group, London, ISBN 978-0-415-48507-4, 2009.
</mixed-citation></ref-html>
<ref-html id="bib1.bib37"><label>37</label><mixed-citation>
Lhomme, J., Gutierrez-Andres, J., Weisgerber, A., Davison, M., Mulet-Marti,
J., Cooper, A., and Gouldby, B.: Testing a new two-dimensional flood
modelling system: analytical tests and application to a flood event,
J. Flood Risk Manag., 3, 33–51, <a href="https://doi.org/10.1111/j.1753-318X.2009.01053.x" target="_blank">https://doi.org/10.1111/j.1753-318X.2009.01053.x</a>, 2010.
</mixed-citation></ref-html>
<ref-html id="bib1.bib38"><label>38</label><mixed-citation>Mason, D. C., Bates, P. D., and Amico, J. T. D.: Calibration of uncertain
flood inundation models using remotely sensed water levels, J. Hydrol., 368,
224–236, <a href="https://doi.org/10.1016/j.jhydrol.2009.02.034" target="_blank">https://doi.org/10.1016/j.jhydrol.2009.02.034</a>, 2009.
</mixed-citation></ref-html>
<ref-html id="bib1.bib39"><label>39</label><mixed-citation>
Mein, R. G., Laurenson, E. M., and McMahon, T. A.: Simple nonlinear model
for flood estimation, Journal of the Hydraulics Division, Proceedings of the
American Society of Civil Engineers, 100, 1507–1518, 1974.
</mixed-citation></ref-html>
<ref-html id="bib1.bib40"><label>40</label><mixed-citation>
Miller, J. E.: Basic Concepts of Kinematic-Wave Models, U. S. Geological
Survey, Washington, USA, 36, 1984.
</mixed-citation></ref-html>
<ref-html id="bib1.bib41"><label>41</label><mixed-citation>
Montanari, M., Hostache, R., Matgen, P., Schumann, G., Pfister, L., and Hoffmann, L.: Calibration and sequential updating of a coupled hydrologic-hydraulic model using remote sensing-derived water stages, Hydrol. Earth Syst. Sci., 13, 367–380, <a href="https://doi.org/10.5194/hess-13-367-2009" target="_blank">https://doi.org/10.5194/hess-13-367-2009</a>, 2009.
</mixed-citation></ref-html>
<ref-html id="bib1.bib42"><label>42</label><mixed-citation>
Neal, J., Schumann, G., Fewtrell, T., Budimir, M., Bates, P., and Mason, D.:
Evaluating a new LISFLOOD-FP formulation with data from the summer 2007
floods in Tewkesbury, UK, J. Flood Risk Manag., 4, 88–95,
<a href="https://doi.org/10.1111/j.1753-318X.2011.01093.x" target="_blank">https://doi.org/10.1111/j.1753-318X.2011.01093.x</a>, 2011.
</mixed-citation></ref-html>
<ref-html id="bib1.bib43"><label>43</label><mixed-citation>
Neal, J., Villanueva, I., Wright, N., Willis, T., Fewtrell, T., and Bates,
P.: How much physical complexity is needed to model flood inundation?,
Hydrol. Process., 26, 2264–2282, <a href="https://doi.org/10.1002/hyp.8339" target="_blank">https://doi.org/10.1002/hyp.8339</a>, 2012.
</mixed-citation></ref-html>
<ref-html id="bib1.bib44"><label>44</label><mixed-citation>
Neal, J., Keef, C., Bates, P., Beven, K., and Leedal, D.: Probabilistic
flood risk mapping including spatial dependence, Hydrol. Process., 27,
1349–1363, <a href="https://doi.org/10.1002/hyp.9572" target="_blank">https://doi.org/10.1002/hyp.9572</a>, 2013.
</mixed-citation></ref-html>
<ref-html id="bib1.bib45"><label>45</label><mixed-citation>
Nicholas, A. P., Thomas, R., and Quine, T. A.: Cellular modelling of braided
river form and process, in: Braided Rivers: Process, Deposits, Ecology and
Management, edited by: Smith, G. H. S., Best, J. L., Bristow, C. S., and
Petts, G. E., Special Publications of the International Association of
Sedimentologists, 137–151, <a href="https://doi.org/10.1002/9781444304374.ch6" target="_blank">https://doi.org/10.1002/9781444304374.ch6</a>, 2006.
</mixed-citation></ref-html>
<ref-html id="bib1.bib46"><label>46</label><mixed-citation>
Nishant, N., Evans, J. P., Di Virgilio, G., Downes, S. M., Ji, F., Cheung,
K. K. W., Tam, E., Miller, J., Beyer, K., and Riley, M. L.: Introducing
NARCliM1.5: Evaluating the Performance of Regional Climate Projections for
Southeast Australia for 1950–2100, Earth's Future, 9, e2020EF001833,
<a href="https://doi.org/10.1029/2020EF001833" target="_blank">https://doi.org/10.1029/2020EF001833</a>, 2021.
</mixed-citation></ref-html>
<ref-html id="bib1.bib47"><label>47</label><mixed-citation>
O'Loughlin, F. E., Neal, J., Schumann, G. J. P., Beighley, E., and Bates, P.
D.: A LISFLOOD-FP hydraulic model of the middle reach of the Congo, J.
Hydrol., 580, 124203, <a href="https://doi.org/10.1016/j.jhydrol.2019.124203" target="_blank">https://doi.org/10.1016/j.jhydrol.2019.124203</a>, 2020.
</mixed-citation></ref-html>
<ref-html id="bib1.bib48"><label>48</label><mixed-citation>
Prudhomme, C., Wilby, R. L., Crooks, S., Kay, A. L., and Reynard, N. S.:
Scenario-neutral approach to climate change impact studies: Application to
flood risk, J. Hydrol., 390, 198–209,
<a href="https://doi.org/10.1016/j.jhydrol.2010.06.043" target="_blank">https://doi.org/10.1016/j.jhydrol.2010.06.043</a>, 2010.
</mixed-citation></ref-html>
<ref-html id="bib1.bib49"><label>49</label><mixed-citation>
Rajib, A., Liu, Z., Merwade, V., Tavakoly, A. A., and Follum, M. L.: Towards
a large-scale locally relevant flood inundation modeling framework using
SWAT and LISFLOOD-FP, J. Hydrol., 581, 124406, <a href="https://doi.org/10.1016/j.jhydrol.2019.124406" target="_blank">https://doi.org/10.1016/j.jhydrol.2019.124406</a>, 2020.
</mixed-citation></ref-html>
<ref-html id="bib1.bib50"><label>50</label><mixed-citation>
Ryu, J.-H., Kim, J.-E., Lee, J.-Y., Kwon, H.-H., and Kim, T.-W.: Estimating
Optimal Design Frequency and Future Hydrological Risk in Local River Basins
According to RCP Scenarios, Water, 14,  945, <a href="https://doi.org/10.3390/w14060945" target="_blank">https://doi.org/10.3390/w14060945</a>, 2022.
</mixed-citation></ref-html>
<ref-html id="bib1.bib51"><label>51</label><mixed-citation>
Sampson, C. C., Smith, A. M., Bates, P. B., Neal, J. C., Alfieri, L., and
Freer, J. E.: A high-resolution global flood hazard model, Water Resour.
Res., 51, 7358–7381, <a href="https://doi.org/10.1002/2015wr016954" target="_blank">https://doi.org/10.1002/2015wr016954</a>, 2015.
</mixed-citation></ref-html>
<ref-html id="bib1.bib52"><label>52</label><mixed-citation>
Schmidli, J., Frei, C., and Vidale, P. L.: Downscaling from GCM
precipitation: a benchmark for dynamical and statistical downscaling
methods, Int. J. Climatol., 26, 679–689, <a href="https://doi.org/10.1002/joc.1287" target="_blank">https://doi.org/10.1002/joc.1287</a>, 2006.
</mixed-citation></ref-html>
<ref-html id="bib1.bib53"><label>53</label><mixed-citation>
Schumann, G. J. P., Neal, J. C., and Bates, P. D.: Global scale simulation
of flood plain inundation with low resolution space-borne data, in: Remote
Sensing and Hydrology, edited by: Neale, C. M. U., and Cosh, M. H., IAHS
Publication, 464–467, 2012.
</mixed-citation></ref-html>
<ref-html id="bib1.bib54"><label>54</label><mixed-citation>
Schumann, G. J. P., Neal, J. C., Voisin, N., Andreadis, K. M., Pappenberger,
F., Phanthuwongpakdee, N., Hall, A. C., and Bates, P. D.: A first
large-scale flood inundation forecasting model, Water Resour. Res., 49,
6248–6257, <a href="https://doi.org/10.1002/wrcr.20521" target="_blank">https://doi.org/10.1002/wrcr.20521</a>, 2013.
</mixed-citation></ref-html>
<ref-html id="bib1.bib55"><label>55</label><mixed-citation>Shrestha, S. and Lohpaisankrit, W.: Flood hazard assessment under climate
change scenarios in the Yang River Basin, Thailand,
International Journal of Sustainable Built Environment, 6, 285–298, <a href="https://doi.org/10.1016/j.ijsbe.2016.09.006" target="_blank">https://doi.org/10.1016/j.ijsbe.2016.09.006</a>, 2017.
</mixed-citation></ref-html>
<ref-html id="bib1.bib56"><label>56</label><mixed-citation>Skinner, C. J., Coulthard, T. J., Parsons, D. R., Ramirez, J. A., Mullen,
L., and Manson, S.: Simulating tidal and storm surge hydraulics with a
simple 2D inertia based model, in the Humber Estuary, U.K, Estuar. Coast. Shelf Sci., 155, 126–136, <a href="https://doi.org/10.1016/j.ecss.2015.01.019" target="_blank">https://doi.org/10.1016/j.ecss.2015.01.019</a>, 2015.
</mixed-citation></ref-html>
<ref-html id="bib1.bib57"><label>57</label><mixed-citation>
Smith, A., Bates, P., Freer, J., and Wetterhall, F.: Investigating the
application of climate models in flood projection across the UK, Hydrol.
Process., 28, 2810–2823, <a href="https://doi.org/10.1002/hyp.9815" target="_blank">https://doi.org/10.1002/hyp.9815</a>, 2014a.
</mixed-citation></ref-html>
<ref-html id="bib1.bib58"><label>58</label><mixed-citation>Smith, G. P., Davey, E. K., and Cox, R. J.: Flood Hazard, Water Research
Laboratory, The University of New South Wales, Sydney, AustraliaWRL
Technical Report 2014/07, 59, 2014b.
</mixed-citation></ref-html>
<ref-html id="bib1.bib59"><label>59</label><mixed-citation>
Timbal, B. and Jones, D. A.: Future projections of winter rainfall in
southeast Australia using a statistical downscaling technique, Climatic
Change, 86, 165–187, <a href="https://doi.org/10.1007/s10584-007-9279-7" target="_blank">https://doi.org/10.1007/s10584-007-9279-7</a>, 2008.
</mixed-citation></ref-html>
<ref-html id="bib1.bib60"><label>60</label><mixed-citation>
Wilby, R. L., Wigley, T. M. L., Conway, D., Jones, P. D., Hewitson, B. C.,
Main, J., and Wilks, D. S.: Statistical downscaling of general circulation
model output: A comparison of methods, Water Resour. Res., 34, 2995–3008,
<a href="https://doi.org/10.1029/98WR02577" target="_blank">https://doi.org/10.1029/98WR02577</a>, 1998.
</mixed-citation></ref-html>
<ref-html id="bib1.bib61"><label>61</label><mixed-citation>Zheng, H., Huang, E., and Luo, M.: Applicability of Kinematic Wave Model for
Flood Routing under Unsteady Inflow, Water, 12, 2528, <a href="https://doi.org/10.3390/w12092528" target="_blank">https://doi.org/10.3390/w12092528</a>, 2020.
</mixed-citation></ref-html>
<ref-html id="bib1.bib62"><label>62</label><mixed-citation>
Zheng, X., Maidment, D. R., Tarboton, D. G., Liu, Y. Y., and Passalacqua,
P.: GeoFlood: Large-Scale Flood Inundation Mapping Based on High-Resolution
Terrain Analysis, Water Resour. Res., 54, 10013–10033, <a href="https://doi.org/10.1029/2018wr023457" target="_blank">https://doi.org/10.1029/2018wr023457</a>,
2018.
</mixed-citation></ref-html>--></article>
