<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD Journal Publishing with OASIS Tables v3.0 20080202//EN" "journalpub-oasis3.dtd">
<article xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:oasis="http://docs.oasis-open.org/ns/oasis-exchange/table" xml:lang="en" dtd-version="3.0">
  <front>
    <journal-meta><journal-id journal-id-type="publisher">NHESS</journal-id><journal-title-group>
    <journal-title>Natural Hazards and Earth System Sciences</journal-title>
    <abbrev-journal-title abbrev-type="publisher">NHESS</abbrev-journal-title><abbrev-journal-title abbrev-type="nlm-ta">Nat. Hazards Earth Syst. Sci.</abbrev-journal-title>
  </journal-title-group><issn pub-type="epub">1684-9981</issn><publisher>
    <publisher-name>Copernicus Publications</publisher-name>
    <publisher-loc>Göttingen, Germany</publisher-loc>
  </publisher></journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.5194/nhess-20-3135-2020</article-id><title-group><article-title>Multi-hazard risk assessment for roads: probabilistic <?xmltex \hack{\break}?> versus deterministic approaches</article-title><alt-title>Multi-hazard risk assessment for roads</alt-title>
      </title-group><?xmltex \runningtitle{Multi-hazard risk assessment for roads}?><?xmltex \runningauthor{S.~Oberndorfer et al.}?>
      <contrib-group>
        <contrib contrib-type="author" corresp="yes" rid="aff1 aff2">
          <name><surname>Oberndorfer</surname><given-names>Stefan</given-names></name>
          <email>office@oberndorfer-zt.at</email>
        <ext-link>https://orcid.org/0000-0002-0641-8251</ext-link></contrib>
        <contrib contrib-type="author" corresp="no" rid="aff3">
          <name><surname>Sander</surname><given-names>Philip</given-names></name>
          
        </contrib>
        <contrib contrib-type="author" corresp="no" rid="aff2">
          <name><surname>Fuchs</surname><given-names>Sven</given-names></name>
          
        <ext-link>https://orcid.org/0000-0002-0644-2876</ext-link></contrib>
        <aff id="aff1"><label>1</label><institution>Ziviltechnikerkanzlei Oberndorfer, Ecking 57, 5771 Leogang, Austria</institution>
        </aff>
        <aff id="aff2"><label>2</label><institution>Institute of Mountain Risk Engineering, University of Natural
Resources and Life Sciences, Vienna, <?xmltex \hack{\break}?> Peter-Jordan-Straße 82, 1190 Vienna, Austria</institution>
        </aff>
        <aff id="aff3"><label>3</label><institution>Institute of Construction Management, Bundeswehr University Munich,
<?xmltex \hack{\break}?> Werner-Heisenberg-Weg 39, 85577 Neubiberg, Germany</institution>
        </aff>
      </contrib-group>
      <author-notes><corresp id="corr1">Stefan Oberndorfer (office@oberndorfer-zt.at)</corresp></author-notes><pub-date><day>27</day><month>November</month><year>2020</year></pub-date>
      
      <volume>20</volume>
      <issue>11</issue>
      <fpage>3135</fpage><lpage>3160</lpage>
      <history>
        <date date-type="received"><day>1</day><month>March</month><year>2020</year></date>
           <date date-type="rev-request"><day>10</day><month>March</month><year>2020</year></date>
           <date date-type="rev-recd"><day>20</day><month>September</month><year>2020</year></date>
           <date date-type="accepted"><day>10</day><month>October</month><year>2020</year></date>
      </history>
      <permissions>
        <copyright-statement>Copyright: © 2020 Stefan Oberndorfer et al.</copyright-statement>
        <copyright-year>2020</copyright-year>
      <license license-type="open-access"><license-p>This work is licensed under the Creative Commons Attribution 4.0 International License. To view a copy of this licence, visit <ext-link ext-link-type="uri" xlink:href="https://creativecommons.org/licenses/by/4.0/">https://creativecommons.org/licenses/by/4.0/</ext-link></license-p></license></permissions><self-uri xlink:href="https://nhess.copernicus.org/articles/20/3135/2020/nhess-20-3135-2020.html">This article is available from https://nhess.copernicus.org/articles/20/3135/2020/nhess-20-3135-2020.html</self-uri><self-uri xlink:href="https://nhess.copernicus.org/articles/20/3135/2020/nhess-20-3135-2020.pdf">The full text article is available as a PDF file from https://nhess.copernicus.org/articles/20/3135/2020/nhess-20-3135-2020.pdf</self-uri>
      <abstract><title>Abstract</title>
    <p id="d1e117">Mountain hazard risk analysis for transport infrastructure is regularly based on deterministic approaches. Standard risk assessment approaches for roads need a variety of variables and data for risk computation, however without considering potential uncertainty in the input data. Consequently, input data needed for risk assessment are normally processed as discrete mean values without scatter or as an individual deterministic value from expert judgement if no statistical data are available. To overcome this gap, we used a probabilistic approach to analyse the effect of input data uncertainty on the results, taking a mountain road in the Eastern European Alps as a case study. The uncertainty of the input data are expressed with potential bandwidths using two different distribution functions. The risk assessment included risk for persons, property risk and risk for non-operational availability exposed to a multi-hazard environment
(torrent processes, snow avalanches and rockfall). The study focuses on the
epistemic uncertainty of the risk terms (exposure situations, vulnerability
factors and monetary values), ignoring potential sources of variation in the
hazard analysis. As a result, reliable quantiles of the calculated probability density distributions attributed to the aggregated road risk due to the impact of multiple mountain hazards were compared to the
deterministic outcome from the standard guidelines on road safety. The
results based on our case study demonstrate that with common deterministic
approaches risk might be underestimated in comparison to a probabilistic
risk modelling setup, mainly due to epistemic uncertainties of the input
data. The study provides added value to further develop standardized road
safety guidelines and may therefore be of particular importance for road
authorities and political decision-makers.</p>
  </abstract>
    </article-meta>
  </front>
<body>
      

<sec id="Ch1.S1" sec-type="intro">
  <label>1</label><title>Introduction</title>
      <p id="d1e129">Mountain roads are particularly prone to natural hazards, and consequently,
risk assessment for road infrastructure focused on a range of different
hazard processes, such as landslides (Benn, 2005; Schlögl et al., 2019),
rockfall (Bunce et al., 1997; Hungr and Beckie, 1998; Roberds, 2005; Ferlisi
et al., 2012; Michoud et al., 2012; Unterrader et al., 2018) and snow
avalanches (Schaerer, 1989; Kristensen et al., 2003; Margreth et al., 2003;
Zischg et al., 2005; Hendrikx and Owens, 2008; Rheinberger et al., 2009;
Wastl et al., 2011). These studies have in common that they exclusively
address the interaction of individual hazards with values at risk of the
built environment and/or of society and use qualitative, semi-quantitative
and/or quantitative approaches. However, there is still a gap in
multi-hazard risk assessments for road infrastructure. The article provides
a comparison of a standard (deterministic) risk assessment approach for road
infrastructure exposed to a multi-hazard environment with a probabilistic
risk analysis method to show the potential bias in the results. The
multi-hazard scope of the study is based on a spatially oriented approach to
include all relevant hazards within our study area. Using this approach, we
address the consequences of multi-hazard impact on road<?pagebreak page3136?> infrastructure
and compare the monetary loss of the different hazard types. The standard
framework from ASTRA (2012) for road risk assessment is based on a
deterministic approach and computes road risk based on a variety of input
variables. Data are generally addressed with single values without
considering potential input data uncertainty. We used this standardized
framework for operational risk assessment for roads and transportation
networks and supplemented this well-established deterministic method with a
probabilistic framework for risk calculation (Fig. 1). A probabilistic
approach enables the quantification of epistemic uncertainty and uses
probability distributions to characterize data uncertainty of the input
variables, while a deterministic computation uses single values with discrete
values without uncertainty representation. While the former calculates risk
with constant or discrete values, ignoring the epistemic uncertainty of the
variables, the latter enables the consideration of the potential range of
parameter values by using different distributions to characterize the input
data uncertainty. Our study focuses on the epistemic uncertainty of the risk
terms (exposure situations, vulnerability factors and monetary values), ignoring
potential sources of variation within hazard analysis. Thus, the probability
of occurrence of the hazard event was not assessed in a probabilistic way.
Since deriving the likelihood of occurrence as part of the hazard analysis
is crucial for risk analysis, a large source of uncertainty is attributed to
this factor (Schaub and Bründl, 2010).</p>

      <?xmltex \floatpos{t}?><fig id="Ch1.F1" specific-use="star"><?xmltex \currentcnt{1}?><label>Figure 1</label><caption><p id="d1e134">Exemplified flowchart for the risk assessment method
following the standard approach (deterministic risk model) from ASTRA (2012),
which was supplemented with the probabilistic risk model in the present study.
In the deterministic approach each risk variable is addressed with single
values, and the specific risk situations are summed up to risk categories for
each hazard process class and scenario (probability of occurrence of the
hazard process) and finally to the collective risk, whereas the
probabilistic setup uses a probability distributions to characterize each
risk variable and further aggregates risk by stochastic simulation to the
total risk (et seqq.: et sequentes).</p></caption>
        <?xmltex \igopts{width=497.923228pt}?><graphic xlink:href="https://nhess.copernicus.org/articles/20/3135/2020/nhess-20-3135-2020-f01.png"/>

      </fig>

</sec>
<sec id="Ch1.S2">
  <label>2</label><title>Background</title>
<sec id="Ch1.S2.SS1">
  <label>2.1</label><title>Multi-hazard risk assessment</title>
      <p id="d1e158">According to Kappes et al. (2012a), two approaches to multi-hazard risk
analysis can be distinguished, a spatially oriented and a
thematically defined method. While the first aims to include all relevant
hazards and associated loss in an area, the latter deals with the influence
or interaction of one hazard process on another hazard, frequently addressed
as hazard chains or cascading hazards, meaning that the occurrence of one
hazard is triggering one or several second-order (successive) hazards. One
of the major issues in multi-hazard risk analysis – see Kappes et al. (2012a) for a comprehensive overview – lies in the different process
characteristics which lead to challenges for a sound comparison of the
resulting risk level among different hazard types due to different reference
units. Standardization by a classification scheme for frequency and
intensity thresholds of different hazard types resulting in
semi-quantitative classes or ranges allows for a comparison among different
hazard types, such as that shown in Table 2. Therefore, the analysis of risk for
transport infrastructure is often focused on an assessment of different
hazard types affecting a defined road section rather than on hazard chains
or cascades (Schlögl et al., 2019). Following this approach,
hazard-specific vulnerability can be assessed either in terms of loss
estimates (e.g. Papathoma-Köhle et al., 2011; Fuchs et al., 2019) or in
terms of other socioeconomic variables, such as limited access in the case of
road blockage or interruption (Schlögl et al., 2019). Focusing on the
first and neglecting any type of hazard chains, our study demonstrates the
application of risk to a specific road section in the Eastern European Alps
and shows the sensitivity of the results using deterministic and
probabilistic risk approaches.</p>
</sec>
<sec id="Ch1.S2.SS2">
  <label>2.2</label><title>Deterministic risk concept</title>
      <p id="d1e169">Quantitative risk analyses for natural hazards are regularly based on
deterministic approaches, and the temporal and spatial occurrence
probability of a hazard process with a given magnitude is multiplied by the
expected consequences, the latter defined by values at risk times
vulnerability (Varnes, 1984; International Organization for Standardization, 2009). A universal definition of risk relates the likelihood of an event with the expected consequences, thus manifesting risk as a function of hazards times consequences (UNISDR, 2004; International Organization for Standardization, 2009). Depending on the spatial and temporal scale, values at risk include exposed elements, such as buildings (Fuchs et al., 2015, 2017), infrastructure systems (Guikema et al., 2015) and people at risk (Fuchs et al., 2013). These elements at risk are linked to potential loss using vulnerability functions, indices or indicators
(Papathoma-Köhle, 2017) and can be expressed in terms of direct and
indirect, as well as tangible and intangible, loss (Markantonis et al., 2012;
Meyer et al., 2013). While direct loss occurs immediately due to the
physical impact of the hazard, indirect loss occurs with a certain time lag
after an event (Merz et al., 2004, 2010). Furthermore, the distinction
between tangible or intangible loss depends on whether or not the
consequences can be assessed in monetary terms. In this context,
vulnerability is defined as the degree of loss given to an element of risk
as a result from the occurrence of a natural phenomenon of a given
intensity, ranging between 0 (no damage) and 1 (total loss) (UNDRO, 1979;
Fell et al., 2008a; Fuchs, 2009). This definition highlights a physical
approach to vulnerability within the domain of natural sciences, neglecting
any societal dimension of risk. However, the expression of vulnerability due
to the impact of a threat on the element at risk considerably differs among
hazard types (Papathoma-Köhle et al., 2011).</p>
      <?pagebreak page3137?><p id="d1e172">Using a deterministic approach, the calculation of risk has repeatedly been
conceptualized by Eq. (1) (e.g. Fuchs et al. 2007; Oberndorfer et al., 2007; Bründl et al. 2009) and is dependent on a variety of variables, all of which are subject to uncertainties (Grêt-Regamey and Straub, 2006).
            <disp-formula id="Ch1.E1" content-type="numbered"><label>1</label><mml:math id="M1" display="block"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mrow><mml:mi>i</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub><mml:mo>=</mml:mo><mml:mi>f</mml:mi><mml:mfenced close=")" open="("><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi>j</mml:mi></mml:msub><mml:mo>,</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mrow><mml:mi>i</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub><mml:mo>,</mml:mo><mml:msub><mml:mi>A</mml:mi><mml:mi>i</mml:mi></mml:msub><mml:mo>,</mml:mo><mml:msub><mml:mi>v</mml:mi><mml:mrow><mml:mi>i</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:mfenced><mml:mo>,</mml:mo></mml:mrow></mml:math></disp-formula>
          where <inline-formula><mml:math id="M2" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mrow><mml:mi>i</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula> is the risk dependent of object <inline-formula><mml:math id="M3" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula> and scenario <inline-formula><mml:math id="M4" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula>,
<inline-formula><mml:math id="M5" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi>j</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> is the probability of defined scenario <inline-formula><mml:math id="M6" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M7" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mrow><mml:mi>i</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula> is the probability of exposure of object <inline-formula><mml:math id="M8" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula> to scenario <inline-formula><mml:math id="M9" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M10" display="inline"><mml:mrow><mml:msub><mml:mi>A</mml:mi><mml:mi>i</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> is the value of object <inline-formula><mml:math id="M11" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula> (the value at risk affected by scenario <inline-formula><mml:math id="M12" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula>), and <inline-formula><mml:math id="M13" display="inline"><mml:mrow><mml:msub><mml:mi>v</mml:mi><mml:mrow><mml:mi>i</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula> is the vulnerability of object <inline-formula><mml:math id="M14" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula> in dependence on scenario <inline-formula><mml:math id="M15" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula>.</p>
      <p id="d1e370">With respect to mountain hazard risk assessment, standardized approaches are
available, such as IUGS (1997), Dai et al. (2002), Bell and Glade (2004),
and Fell et al. (2008a, b) for landslides; Bründl et al. (2010) for snow
avalanches; and Bründl (2009) or ASTRA (2012) for a multi-hazard
environment. These approaches, however, usually neglect the inherent
uncertainties of involved variables. In particular, they ignore the
probability distributions of the variables (Grêt-Regamey and Straub,
2006) by obtaining the results with constant input parameters, which may
lead to bias (over- and underestimation dependent on the scale of input
variables) in the results. Therefore, loss assessment for natural hazard
risk is associated with high uncertainty (Špačková et al., 2014; Špačková, 2016), and studies quantifying uncertainties of the
expected consequences are underrepresented (Grêt-Regamey and Straub,
2006), especially regarding natural hazard impacts on roads (Schlögl et
al., 2019). For the assessment of an optimal mitigation strategy for an
avalanche-prone road Rheinberger et al. (2009) consider parameter
uncertainty by assuming a joint (symmetric) deviation of <inline-formula><mml:math id="M16" display="inline"><mml:mrow><mml:mo>±</mml:mo><mml:mn mathvariant="normal">5</mml:mn></mml:mrow></mml:math></inline-formula> % for
all input values to construct a confidence interval for the baseline risk.
The assessment of uncertainty of natural hazard risk is therefore frequently
represented by sensitivity analyses to show the sensitivity through a shift
in input values on the results. Thus, the use of confidence intervals allows
for a discrete calculation of risk with different model setups. In our study, we
quantify the potential uncertainties within road risk assessment using a
stochastic risk assessment approach under consideration of the probability
distribution of input data.</p>
</sec>
<sec id="Ch1.S2.SS3">
  <label>2.3</label><title>Uncertainties within risk assessment</title>
      <p id="d1e391">Since the computation of risk for roads requires a variety of auxiliary
calculations, a broad range of input data are used, such as the spatial and
temporal probability of occurrence of specific design events. These
auxiliary calculations subsequently provide variables necessary for risk
computation of the respective system under investigation. Individual
contributing variables are often characterized either as the mean value of the
potential spectrum from a statistical dataset or, as a consequence of
incomplete data, as a single value from expert judgement. Expert information
is frequently processed with semi-quantitative probability classes and
therefore subjected to considerable uncertainties.<?pagebreak page3138?> Consequently, they serve
as rough qualitative appraisals encompassing a high degree of uncertainty.</p>
      <p id="d1e394">The use of vulnerability parameters or lethality values as a function of
process-specific intensities is often based on incomplete or insufficient
statistical data resulting from missing event documentation (Fuchs et al.,
2013). As discussed in Kappes et al. (2012a), Papathoma-Köhle et al. (2011, 2017), and Ciurean et al. (2017) with respect to mountain hazards,
potential sources of uncertainty in vulnerability assessment are independent
of the applied assessment method. The amplitude in data is not only considerably high
in continuous vulnerability curves or functions but also in discrete
(minimum and maximum) vulnerability values referred to as matrices
(coefficients) and in indicator- and index-based methods used to calculate the cumulative probability of loss. With regard to the uncertainty in vulnerability matrices, Ciurean et al. (2017) suggested a fully
probabilistic simulation in order to quantify the propagation of errors
between the different stages of analysis by substituting the range of
minimum–maximum values with a probability distribution for each variable in
the model.</p>
      <p id="d1e397">Grêt-Regamey and Straub (2006) listed potential sources of uncertainties
in risk assessment models and classified uncertainties into aleatory and
epistemic uncertainties. The first is considered as inherent to a system
associated with the natural variability over space and time (Winter et al.,
2018) and the variability of underlying random or stochastic processes (Merz
and Thieken, 2005, 2009), which cannot be further reduced by an increase in
knowledge, information or data. The latter results from incomplete knowledge
and can be reduced with an increase of cognition or better information of
the system under investigation (Merz and Thieken, 2005, 2009;
Grêt-Regamey and Straub, 2006). Particularly referring to deterministic
risk analysis, epistemic uncertainty is associated with a lack of knowledge
about quantities of fixed but poorly known values (Merz and Thieken, 2009).
Špačková (2016) pointed out the importance of interactions
(correlations) between uncertainties which may affect the final results, an
issue that was also discussed in the framework of multi-hazard risk
assessments (Kappes, 2012a, b). Therefore, uncertainties should be included
in the analysis by their upper and lower credible limits or by integrating
confidence intervals reflecting the incertitude of input data; for an
in-depth discussion see e.g. Apel et al. (2004), Merz and Thieken (2005,
2009), Bründl et al. (2009), and Winter et al. (2018).</p>
</sec>
<sec id="Ch1.S2.SS4">
  <label>2.4</label><title>Deterministic versus probabilistic risk</title>
      <p id="d1e408">Deterministic and probabilistic methods for risk analysis differ
significantly in approach. Deterministic methods generally use a defined
value (point value) for probability and for the impact (consequence) and
consider risk by multiplying the probability of occurrence with the
potential consequences. The result is an “expected value” of risk. If
multiple risks e.g. with varying frequencies are addressed, the total risk
is expressed as the simple sum of single risks resulting in an expected
annual average loss. However, information about probability or best- and/or
worst-case scenarios are often excluded. In particular, the following
shortcomings of deterministic approaches can be summarized (Tecklenburg,
2003), which in turn leads us to a recommendation of probability-based risk
approaches:</p>
      <p id="d1e411">A deterministic method gives equal weight to those risks that have a low
probability of occurrence and high impact and to those risks that have a
high probability of occurrence and low impact by using a simple
multiplication of probability and impact, a topic which is also known as
the risk aversion effect and is controversially discussed in the literature
(e.g. Wachinger et al., 2013; Lechowska, 2018).</p>
      <p id="d1e414">By multiplying the two elements of probability and impact, these values are
no longer independent. Therefore, this method is not adequate for
aggregation of risks where both probability and impact information need to
remain available. Due to multiplication, the only information that remains
is the mean value.</p>
      <p id="d1e417">The actual impact will definitely deviate from the deterministic value
(i.e. the mean).</p>
      <p id="d1e421">Without the value-at-risk (VaR) information, there is no way to determine
how reliable the mean value is and how likely it might be exceeded. The VaR
is a measure of risk in economics and describes the probability of loss
within a time unit, which is expressed as a specified quantile of the loss
distribution (Cottin and Döhler, 2013).</p>
      <p id="d1e424">In this context, deterministic systems are perfectly predictable, and the
state of the parameters to describe the system behaviour are fixed (single)
values associated with total determination following an entirely known
rule, whereas probabilistic systems include some degree of uncertainty and
the variables and/or parameters to describe the state of the system are therefore
random (Kirchsteiger, 1999). The variables and/or parameters in probabilistic
systems are described with probability distributions due to incomplete
knowledge, rather than with a discrete single or point value which is
assumed to be totally certain. Probabilistic risk modelling uses stochastic
simulation with a defined distribution function to generate random results
within the setting of the boundary conditions. The deterministic variable is
usually included within the input distribution. In Table 1 the two different
methods are compared.</p>

<?xmltex \floatpos{t}?><table-wrap id="Ch1.T1" specific-use="star"><?xmltex \currentcnt{1}?><label>Table 1</label><caption><p id="d1e430">Deterministic versus probabilistic method for risk analysis adjusted and compiled from Sander et al. (2015) and Kirchsteiger (1999).</p></caption><oasis:table frame="topbot"><oasis:tgroup cols="3">
     <oasis:colspec colnum="1" colname="col1" align="left"/>
     <oasis:colspec colnum="2" colname="col2" align="left"/>
     <oasis:colspec colnum="3" colname="col3" align="left"/>
     <oasis:thead>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">Deterministic method</oasis:entry>
         <oasis:entry colname="col3">Probabilistic method</oasis:entry>
       </oasis:row>
     </oasis:thead>
     <oasis:tbody>
       <oasis:row>
         <oasis:entry colname="col1">Input</oasis:entry>
         <oasis:entry colname="col2">The deterministic risk assessment uses</oasis:entry>
         <oasis:entry colname="col3">The probabilistic assessment of risk requires at least</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">a single number for consequence as a</oasis:entry>
         <oasis:entry colname="col3">one number or – for an entirely probabilistic</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">descriptive statement including conservative</oasis:entry>
         <oasis:entry colname="col3">modelling – a PDF for the probability of occurrence</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">assumptions, and risk is expressed by</oasis:entry>
         <oasis:entry colname="col3">and several values for the impact (e.g. minimum,</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">the probability of occurance multiplied</oasis:entry>
         <oasis:entry colname="col3">most likely and maximum) expressed as distribution</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">by the impact of the particular hazard.</oasis:entry>
         <oasis:entry colname="col3">functions, therefore including uncertainty.</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1">Result</oasis:entry>
         <oasis:entry colname="col2">A simple mathematical addition yields the</oasis:entry>
         <oasis:entry colname="col3">Simulation methods e.g. Monte Carlo simulation</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">aggregated consequence for all risks (point</oasis:entry>
         <oasis:entry colname="col3">produce a bandwidth (range) of aggregated natural</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">value calculation). This results in an expected</oasis:entry>
         <oasis:entry colname="col3">hazard risks as a probability distribution based on</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">consequence for the aggregated risks but does</oasis:entry>
         <oasis:entry colname="col3">thousands of coincidental but realistic scenarios</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">not adequately represent the bandwidth</oasis:entry>
         <oasis:entry colname="col3">(depiction of realistic risk combinations). The</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">(range) of the aggregated consequences. The</oasis:entry>
         <oasis:entry colname="col3">method allows for an explicit consideration and</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">deterministic calculation can be supplemented</oasis:entry>
         <oasis:entry colname="col3">treatment of all types of reducible uncertainty.</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">with upper and lower bounds (different model</oasis:entry>
         <oasis:entry colname="col3"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">setups) to show the sensitivity of the input on</oasis:entry>
         <oasis:entry colname="col3"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">the results using a sensitivity analysis, which</oasis:entry>
         <oasis:entry colname="col3"/>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">are per se separate deterministic calculations.</oasis:entry>
         <oasis:entry colname="col3"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1">Qualification</oasis:entry>
         <oasis:entry colname="col2">Results (monetary value or fatality per time</oasis:entry>
         <oasis:entry colname="col3">Results are displayed using probability</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">unit) are displayed as a single sharp number,</oasis:entry>
         <oasis:entry colname="col3">distributions, which allow for a value-at-risk (VaR)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">which, in itself, does not have an associated</oasis:entry>
         <oasis:entry colname="col3">interpretation for each value within the bandwidth</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">probability.</oasis:entry>
         <oasis:entry colname="col3">(range).</oasis:entry>
       </oasis:row>
     </oasis:tbody>
   </oasis:tgroup></oasis:table></table-wrap>

      <p id="d1e694">In our study we present an probabilistic design for loss calculation in
order to compute the potential spectrum of input data with simple
distribution functions and further aggregate the intermediate data of
exposure situations as well as hazard- and scenario-related modules to the probability density function (PDF) of the total collective risk <inline-formula><mml:math id="M17" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> by means of stochastic simulation (Fig. 1). Consequently, damage induced by natural hazard impact to road infrastructure as well as to traffic are represented by a range of monetary values as<?pagebreak page3139?> a prognostic distribution of the expected annual average loss instead of an individual amount.</p>
</sec>
</sec>
<sec id="Ch1.S3">
  <label>3</label><title>Case study</title>
      <p id="d1e717">The study area is located in the Eastern European Alps, within the federal
state of Salzburg, Austria (Fig. 2). The case study is a road segment of the
federal highway B99 with an overall length of 2 km ranging from
km 52.8 to km 54.8 and is endangered by multiple types of natural hazards.
The road segment was chosen to demonstrate the advantages of using
probabilistic risk approaches in comparison to traditional deterministic
methods. The mountain road under examination is part of a north–south
traverse over the main ridge of the Eastern European Alps and is therefore
an important regional transit route. Furthermore, the road provides access
to the ski resort of Obertauern.</p>
      <p id="d1e720">As shown in Fig. 2, the road segment is affected by three avalanche paths,
four torrent catchments and one rockfall area. The four torrent catchments
have steep alluvial fans on the valley basin. The road segment is located at
the base of these fans or the road is slightly notched in the torrential
cone and passes the channels either with bridges or with culverts. The
rockfall area is situated in the western part of the road segment.
Approximately two-thirds of the study area is affected from rockfall
processes either as single blocks or by multiple blocks.</p>
      <p id="d1e723"><?xmltex \hack{\newpage}?>The road is frequently used for individual traffic from both sides of the
alpine pass. Hence, a mean daily traffic (MDT) of 3600 cars is observed.
This constant frequency represents the standard situation for the
potentially exposed elements at risk. However, especially in the winter
months the average daily traffic can considerably increase up to an amount
of about 7000 cars. Thus, the traffic data underlie short-term daily and
longer-term seasonal fluctuations with peaks up to double of the mean
value. The importance of dynamic risk computation needed for traffic
corridors was also discussed earlier by Zischg et al. (2005) and Fuchs et
al. (2013) with respect to the spatiotemporal shifts in elements at risk.
Besides its use as a regional transit route, the road is also a central
bypass for one of the main transit routes through the Eastern European Alps.
Hence, any closure of this main transit route (A10 Tauern motorway) results
in a significant increase of daily traffic frequency up to a total of 19 650 cars. The evaluation of the dataset in terms of the bandwidth of the traffic data is shown in Table A6.</p>

      <?xmltex \floatpos{t}?><fig id="Ch1.F2" specific-use="star"><?xmltex \currentcnt{2}?><label>Figure 2</label><caption><p id="d1e730">Overview of the case study area and location of the natural hazards along the road segment (Source base map: © BEV 2020 – Federal Office of Metrology and Surveying, Austria, with permission N2020/69708).</p></caption>
        <?xmltex \igopts{width=398.338583pt}?><graphic xlink:href="https://nhess.copernicus.org/articles/20/3135/2020/nhess-20-3135-2020-f02.png"/>

      </fig>

</sec>
<sec id="Ch1.S4">
  <label>4</label><title>Methods</title>
<sec id="Ch1.S4.SS1">
  <label>4.1</label><title>Hazard analysis</title>
      <p id="d1e754">The hazard analysis was part of technical studies undertaken for the road
authority of the federal state of Salzburg (Geoconsult, 2016; Oberndorfer,
2016). The results regarding the spatial impact of the hazard processes on
the elements at risk<?pagebreak page3140?> and the corresponding hazard intensities were used for
the loss assessment in this research. The hazard assessment included the
steps of hazard disposition analysis to detect potential hazard sources
within the perimeter of the road followed by a detailed numerical hazard
analysis. Therefore, these analyses considered approaches for
hazard-specific impact assessment according to the engineering guidelines of
e.g. Bründl (2009), ASTRA (2012) and Bründl et al. (2015) and
relevant engineering standards and technical regulations (Austrian Standards
Organisation, 2009, 2010, 2017). The physical impact parameters of the
hazard processes were calculated using numerical simulation software, such
as Flow-2D for flash floods and debris flows (Flow-2D Software, 2017),
SamosAT (Snow Avalanche MOdelling and Simulation – Advanced Technology) for dense-snow and powder-snow avalanches (Sampl, 2007), and Rockyfor3D for rockfall (Dorren, 2012). The hazard analyses were executed without probabilistic calculations; thus, the generated results were integrated as constant input in the risk analysis.</p>
      <p id="d1e757">For the multi-hazard purpose three hazard types were evaluated: (1) hydrological hazards (torrential floods, flash floods and debris flows), (2) geological hazards (rockfall and landslides) and (3) snow avalanches (dense-snow and powder-snow avalanches). For each hazard type, intensity maps for the affected road segment were computed. The intensity maps specify for a
specific hazard scenario the spatial extent of a certain physical impact
(e.g. pressure, velocity or inundation depth) during a reference period
(Bründl et al., 2009). In order to transfer the physical impact to
object-specific vulnerability values for further use in the risk assessment,
three process-specific intensity classes were distinguished (Table 2). These
intensity classes were based on the underlying technical guidelines
(Bründl, 2009; ASTRA, 2012; Bründl et al., 2015) and were slightly
adapted to comply with the regulatory framework in Austria (Republik
Österreich, 1975, 1976; BMLFUW, 2011). Table 2 represents the intensity
classes which correspond to the affiliated object-specific vulnerability and
lethality values (mean damage values) in Tables A7 and A8.</p>

<?xmltex \floatpos{t}?><table-wrap id="Ch1.T2" specific-use="star"><?xmltex \currentcnt{2}?><label>Table 2</label><caption><p id="d1e763">Process-specific intensity classes with pressure <inline-formula><mml:math id="M18" display="inline"><mml:mi>p</mml:mi></mml:math></inline-formula>, height <inline-formula><mml:math id="M19" display="inline"><mml:mi>h</mml:mi></mml:math></inline-formula> (suffix <inline-formula><mml:math id="M20" display="inline"><mml:mrow><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">ws</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> refers to water and solids), velocity <inline-formula><mml:math id="M21" display="inline"><mml:mi>v</mml:mi></mml:math></inline-formula>, depth <inline-formula><mml:math id="M22" display="inline"><mml:mi>d</mml:mi></mml:math></inline-formula> and energy <inline-formula><mml:math id="M23" display="inline"><mml:mi>E</mml:mi></mml:math></inline-formula>. These are compiled and adapted from Bründl (2009), ASTRA (2012) and Republik Österreich (1975) in conjunction with Republik Österreich (1976) and BMLFUW (2011). The low intensity class for debris flow has the same intensity indicators as for inundation because it was assumed that low intensity debris flow events have the same characteristics as hydrological processes.</p></caption><oasis:table frame="topbot"><oasis:tgroup cols="4">
     <oasis:colspec colnum="1" colname="col1" align="left"/>
     <oasis:colspec colnum="2" colname="col2" align="left"/>
     <oasis:colspec colnum="3" colname="col3" align="left"/>
     <oasis:colspec colnum="4" colname="col4" align="left"/>
     <oasis:thead>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1">Hazard type</oasis:entry>
         <oasis:entry colname="col2">Low intensity</oasis:entry>
         <oasis:entry colname="col3">Medium intensity</oasis:entry>
         <oasis:entry colname="col4">High intensity</oasis:entry>
       </oasis:row>
     </oasis:thead>
     <oasis:tbody>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1">Snow avalanche</oasis:entry>
         <oasis:entry colname="col2"><inline-formula><mml:math id="M24" display="inline"><mml:mrow><mml:mn mathvariant="normal">1</mml:mn><mml:mo>&lt;</mml:mo><mml:mi>p</mml:mi><mml:mo>&lt;</mml:mo><mml:mn mathvariant="normal">3</mml:mn></mml:mrow></mml:math></inline-formula> kN m<inline-formula><mml:math id="M25" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">2</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M26" display="inline"><mml:mrow><mml:mn mathvariant="normal">3</mml:mn><mml:mo>&lt;</mml:mo><mml:mi>p</mml:mi><mml:mo>&lt;</mml:mo><mml:mn mathvariant="normal">10</mml:mn></mml:mrow></mml:math></inline-formula> kN m<inline-formula><mml:math id="M27" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">2</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col4"><inline-formula><mml:math id="M28" display="inline"><mml:mrow><mml:mi>p</mml:mi><mml:mo>&gt;</mml:mo><mml:mn mathvariant="normal">10</mml:mn></mml:mrow></mml:math></inline-formula> kN m<inline-formula><mml:math id="M29" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">2</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1">Inundation</oasis:entry>
         <oasis:entry colname="col2"><inline-formula><mml:math id="M30" display="inline"><mml:mrow><mml:mi>h</mml:mi><mml:mo>&lt;</mml:mo><mml:mn mathvariant="normal">0.5</mml:mn></mml:mrow></mml:math></inline-formula> m</oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M31" display="inline"><mml:mrow><mml:mn mathvariant="normal">0.5</mml:mn><mml:mo>&lt;</mml:mo><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">ws</mml:mi></mml:msub><mml:mo>&lt;</mml:mo><mml:mn mathvariant="normal">1.5</mml:mn></mml:mrow></mml:math></inline-formula> m</oasis:entry>
         <oasis:entry colname="col4"><inline-formula><mml:math id="M32" display="inline"><mml:mrow><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">ws</mml:mi></mml:msub><mml:mo>&gt;</mml:mo><mml:mn mathvariant="normal">1.5</mml:mn></mml:mrow></mml:math></inline-formula> m</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">or</oasis:entry>
         <oasis:entry colname="col3">or</oasis:entry>
         <oasis:entry colname="col4">or</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"><inline-formula><mml:math id="M33" display="inline"><mml:mrow><mml:mi>v</mml:mi><mml:mo>×</mml:mo><mml:mi>h</mml:mi><mml:mo>&lt;</mml:mo><mml:mn mathvariant="normal">0.5</mml:mn></mml:mrow></mml:math></inline-formula> m<inline-formula><mml:math id="M34" display="inline"><mml:msup><mml:mi/><mml:mn mathvariant="normal">2</mml:mn></mml:msup></mml:math></inline-formula> s<inline-formula><mml:math id="M35" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M36" display="inline"><mml:mrow><mml:mn mathvariant="normal">0.5</mml:mn><mml:mo>&lt;</mml:mo><mml:mi>v</mml:mi><mml:mo>×</mml:mo><mml:mi>h</mml:mi><mml:mo>&lt;</mml:mo><mml:mn mathvariant="normal">1.5</mml:mn></mml:mrow></mml:math></inline-formula> m<inline-formula><mml:math id="M37" display="inline"><mml:msup><mml:mi/><mml:mn mathvariant="normal">2</mml:mn></mml:msup></mml:math></inline-formula> s<inline-formula><mml:math id="M38" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col4"><inline-formula><mml:math id="M39" display="inline"><mml:mrow><mml:mi>v</mml:mi><mml:mo>×</mml:mo><mml:mi>h</mml:mi><mml:mo>&gt;</mml:mo><mml:mn mathvariant="normal">1.5</mml:mn></mml:mrow></mml:math></inline-formula> m<inline-formula><mml:math id="M40" display="inline"><mml:msup><mml:mi/><mml:mn mathvariant="normal">2</mml:mn></mml:msup></mml:math></inline-formula> s<inline-formula><mml:math id="M41" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1">Debris (bed load)</oasis:entry>
         <oasis:entry colname="col2"><inline-formula><mml:math id="M42" display="inline"><mml:mrow><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">ws</mml:mi></mml:msub><mml:mo>&lt;</mml:mo><mml:mn mathvariant="normal">0.5</mml:mn></mml:mrow></mml:math></inline-formula> m</oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M43" display="inline"><mml:mrow><mml:mn mathvariant="normal">0.5</mml:mn><mml:mo>&lt;</mml:mo><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">s</mml:mi></mml:msub><mml:mo>&lt;</mml:mo><mml:mn mathvariant="normal">0.7</mml:mn></mml:mrow></mml:math></inline-formula> m</oasis:entry>
         <oasis:entry colname="col4"><inline-formula><mml:math id="M44" display="inline"><mml:mrow><mml:msub><mml:mi>h</mml:mi><mml:mi mathvariant="normal">s</mml:mi></mml:msub><mml:mo>&gt;</mml:mo><mml:mn mathvariant="normal">0.7</mml:mn></mml:mrow></mml:math></inline-formula> m</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1">deposit</oasis:entry>
         <oasis:entry colname="col2">or</oasis:entry>
         <oasis:entry colname="col3">or</oasis:entry>
         <oasis:entry colname="col4">and</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"><inline-formula><mml:math id="M45" display="inline"><mml:mrow><mml:mi>v</mml:mi><mml:mo>×</mml:mo><mml:mi>h</mml:mi><mml:mo>&lt;</mml:mo><mml:mn mathvariant="normal">0.5</mml:mn></mml:mrow></mml:math></inline-formula> m<inline-formula><mml:math id="M46" display="inline"><mml:msup><mml:mi/><mml:mn mathvariant="normal">2</mml:mn></mml:msup></mml:math></inline-formula> s<inline-formula><mml:math id="M47" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M48" display="inline"><mml:mrow><mml:mi>v</mml:mi><mml:mo>&lt;</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:math></inline-formula> m s<inline-formula><mml:math id="M49" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col4"><inline-formula><mml:math id="M50" display="inline"><mml:mrow><mml:mi>v</mml:mi><mml:mo>&gt;</mml:mo><mml:mn mathvariant="normal">1.0</mml:mn></mml:mrow></mml:math></inline-formula> m s<inline-formula><mml:math id="M51" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1">Erosion</oasis:entry>
         <oasis:entry colname="col2">–</oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M52" display="inline"><mml:mrow><mml:mi>d</mml:mi><mml:mo>&lt;</mml:mo><mml:mn mathvariant="normal">1.5</mml:mn></mml:mrow></mml:math></inline-formula> m</oasis:entry>
         <oasis:entry colname="col4"><inline-formula><mml:math id="M53" display="inline"><mml:mrow><mml:mi>d</mml:mi><mml:mo>&gt;</mml:mo><mml:mn mathvariant="normal">1.5</mml:mn></mml:mrow></mml:math></inline-formula> m</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3">or top edge of the erosion</oasis:entry>
         <oasis:entry colname="col4">or top edge of the erosion</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1">Rockfall</oasis:entry>
         <oasis:entry colname="col2"><inline-formula><mml:math id="M54" display="inline"><mml:mrow><mml:mi>E</mml:mi><mml:mo>&lt;</mml:mo><mml:mn mathvariant="normal">30</mml:mn></mml:mrow></mml:math></inline-formula> kJ</oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M55" display="inline"><mml:mrow><mml:mn mathvariant="normal">30</mml:mn><mml:mo>&lt;</mml:mo><mml:mi>E</mml:mi><mml:mo>&lt;</mml:mo><mml:mn mathvariant="normal">300</mml:mn></mml:mrow></mml:math></inline-formula> kJ</oasis:entry>
         <oasis:entry colname="col4"><inline-formula><mml:math id="M56" display="inline"><mml:mrow><mml:mi>E</mml:mi><mml:mo>&gt;</mml:mo><mml:mn mathvariant="normal">300</mml:mn></mml:mrow></mml:math></inline-formula> kJ</oasis:entry>
       </oasis:row>
     </oasis:tbody>
   </oasis:tgroup></oasis:table></table-wrap>

      <p id="d1e1405">To determine the intensities of individual hazard processes, two different
return periods were selected, a 1-in-10-year and a 1-in-30-year event
(probability of occurrence <inline-formula><mml:math id="M57" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mn mathvariant="normal">10</mml:mn></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0.1</mml:mn></mml:mrow></mml:math></inline-formula> and <inline-formula><mml:math id="M58" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mn mathvariant="normal">30</mml:mn></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0.033</mml:mn></mml:mrow></mml:math></inline-formula>). All
three snow avalanches can either develop as powder-snow avalanches or as
dense-snow avalanches, depending on the meteorological and/or snowpack
conditions. Due to the catchment characteristics of the torrents two
different indicator processes were assigned for assessing the hazard effect,
depending on the two occurrence intervals. Therefore, the occurrence
interval served as a proxy for the process type, since we assumed for the
frequently occurring events (<inline-formula><mml:math id="M59" display="inline"><mml:mrow><mml:mi>p</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0.1</mml:mn></mml:mrow></mml:math></inline-formula>) the hazard type “flash floods with
sediment transport” and for the medium-scale recurrence intervals
(<inline-formula><mml:math id="M60" display="inline"><mml:mrow><mml:mi>p</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0.033</mml:mn></mml:mrow></mml:math></inline-formula>) debris flow processes.</p>
</sec>
<?pagebreak page3141?><sec id="Ch1.S4.SS2">
  <label>4.2</label><title>Standard guideline for risk assessment</title>
      <p id="d1e1470">The method to calculate road risk for our case study followed the
deterministic standard framework of the ASTRA (2012) guideline for
operational road risk assessment. The identification of elements at risk
regarding their quantity, characteristics and value as well as their
temporal and spatial variability was assessed through an exposure analysis.
The assessment of the vulnerability of objects (affected road segment,
culverts, bridges, etc.) and the lethality of persons was carried out by a
consequence analysis to characterize the extent of potential losses. The
finally resulting collective risk <inline-formula><mml:math id="M61" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> (Eq. 2) as a sum of all hazard types over all object classes and scenarios – under the assumption that the occurrence of the individual hazards is independent of each other – was expressed in monetary terms per year as a prognostic value. <inline-formula><mml:math id="M62" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> is therefore defined as the expected annual damage caused by certain hazards and is frequently used as a risk indicator (Merz et al., 2009; Špačková et al., 2014). Hence, <inline-formula><mml:math id="M63" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> was calculated based on Eq. (1) by summing up the partial risk over all scenarios <inline-formula><mml:math id="M64" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula> and objects <inline-formula><mml:math id="M65" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula> (Bründl et al., 2009, 2015; Bründl, 2009; ASTRA, 2012):
            <disp-formula id="Ch1.E2" content-type="numbered"><label>2</label><mml:math id="M66" display="block"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:munderover><mml:mo movablelimits="false">∑</mml:mo><mml:mrow><mml:mi>j</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow><mml:mi>n</mml:mi></mml:munderover><mml:msub><mml:mi>R</mml:mi><mml:mrow><mml:mi mathvariant="normal">C</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub><mml:mo>,</mml:mo></mml:mrow></mml:math></disp-formula>
          where <inline-formula><mml:math id="M67" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mrow><mml:mi mathvariant="normal">C</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula> is the total collective risk of scenario <inline-formula><mml:math id="M68" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula> and objects <inline-formula><mml:math id="M69" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula> <inline-formula><mml:math id="M70" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mrow><mml:mi mathvariant="normal">C</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub><mml:mo>=</mml:mo><mml:munderover><mml:mo movablelimits="false">∑</mml:mo><mml:mrow><mml:mi>i</mml:mi><mml:mo>=</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow><mml:mi>n</mml:mi></mml:munderover><mml:msub><mml:mi>r</mml:mi><mml:mrow><mml:mi>i</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula>.</p>
      <p id="d1e1628">According to the ASTRA (2012) guideline, the collective risk <inline-formula><mml:math id="M71" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> is divided into three main risk groups: (1) risk for persons <inline-formula><mml:math id="M72" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, (2) property or asset risk <inline-formula><mml:math id="M73" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, and (3) risk of non-operational availability or disposability <inline-formula><mml:math id="M74" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>.</p><?xmltex \hack{\newpage}?>
<sec id="Ch1.S4.SS2.SSS1">
  <label>4.2.1</label><?xmltex \opttitle{Risk for persons $R_{{\mathrm{P}}}$}?><title>Risk for persons <inline-formula><mml:math id="M75" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></title>
      <p id="d1e1694">The risk characterization for persons in terms of the direct impact of a
natural hazard on cars was distinguished in a standard situation for flowing
traffic and a situation during a traffic jam, which was seen as a specific
situation leading to a significant increase of potentially endangered
persons. Additionally, another specific case was also included representing
a rear-end collision either on stagnant cars or on the process depositions
on the road in the case of the standard situation. The probability for a
rear-end collision depends on the characteristics of the road and is
influenced by a factor of e.g. the visual range, the winding and steepness
of the road, the velocity, and traffic density (ASTRA, 2012). Furthermore,
an additional specific scenario was explicitly considered in the case of the
road closure of the main transit route (A10 Tauern motorway) due to the
resulting temporal peak of the mean daily traffic. The statistical mean
daily traffic (MDT) was used as the mean quantity of persons <inline-formula><mml:math id="M76" display="inline"><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> travelling along the road (Table A7).</p>
      <p id="d1e1708">In order to compute <inline-formula><mml:math id="M77" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, the expected annual losses of persons travelling along the road segment under a defined hazard scenario <inline-formula><mml:math id="M78" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula> was calculated as a combination of the specific damage potential or potential damage extent of persons and the damage probability of the exposure situation <inline-formula><mml:math id="M79" display="inline"><mml:mi>k</mml:mi></mml:math></inline-formula> for persons using the road under investigation. The potential losses for persons were monetized by the cost for a statistical human life as published by the Austrian Federal Ministry of Transportation, Innovation and Technology (BMVIT, 2014). The published average national expenses of road accidents include material and immaterial costs (bodily injury, property damage and overhead expenses) of road accidents and are based on statistical
evaluations of the national database as well as on the willingness-to-pay
approach for human suffering. The monetized costs for a statistical human
life equal EUR 3 million. Thus, road risk for persons was calculated with three road-specific exposure situations <inline-formula><mml:math id="M80" display="inline"><mml:mi>k</mml:mi></mml:math></inline-formula> (Bründl et al., 2009):
<list list-type="order"><list-item>
      <p id="d1e1745">direct impact of the hazard event – standard situation (Eq. A1; Table A1),</p></list-item><list-item>
      <p id="d1e1749">direct impact of the hazard event – specific situation due to a traffic jam (Eq. A2; Table A2),</p></list-item><list-item>
      <p id="d1e1753">indirect effect – rear-end collision (Eq. A3; Table A3).</p></list-item></list>
The risk variables to assess <inline-formula><mml:math id="M81" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> are stated in Table A6 for the exposure situations and in Table A7.</p>
</sec>
<?pagebreak page3142?><sec id="Ch1.S4.SS2.SSS2">
  <label>4.2.2</label><?xmltex \opttitle{Property risk $R_{\mathrm{A}}$}?><title>Property risk <inline-formula><mml:math id="M82" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></title>
      <p id="d1e1789">The property risk due to the direct impact of the hazard process on physical
assets of the road infrastructure was calculated for each object <inline-formula><mml:math id="M83" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula> and
scenario <inline-formula><mml:math id="M84" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula> using Eq. (A4) with Table A4 under consideration of risk variables in Table A8. The damage probability was assumed to be equal to the frequency of the scenario <inline-formula><mml:math id="M85" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula>.</p>
      <p id="d1e1813">With respect to the potential direct tangible losses within the study area,
the physical assets including e.g. the road decking of the street segment,
culverts and bridges were expressed by the building costs of the assets
calculated from a reference price per unit (Table A8). The physical assets
of affected cars were not addressed as this damage type is not included in
the standard guideline due to the assumption of obligatory insurance
coverage. The monetized costs refer to replacement costs and reconstruction
costs, respectively, instead of depreciated values, which is strongly
recommended in risk analysis by Merz et al. (2010) due to the fact that
replacement cost systematically overestimates the damage. Since there is a
limitation of reliable or even available data on replacement costs, the
usage of reconstruction costs is a pragmatic procedure to calculate damage.</p>
</sec>
<sec id="Ch1.S4.SS2.SSS3">
  <label>4.2.3</label><?xmltex \opttitle{Risk due to non-operational availability~$R_{\mathrm{D}}$}?><title>Risk due to non-operational availability <inline-formula><mml:math id="M86" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></title>
      <p id="d1e1835">The risk due to non-operational availability can be generally separated into
economic losses due to (1) road closure after a hazard event or (2) as a
result of precautionary measures for road blockage. The former addresses the
mandatory reconditioning of the road, and interruption time depends on
the severity of the damage. For our case study, only the precautionary
non-operational availability was calculated with Eq. (A5), Table A5 and
variables in Table A9 because the village of Obertauern can be accessed from
both directions of the mountain pass road. Therefore, a general
accessibility of the village was supposed because it was assumed that events
only lead to a road closure on one side of the pass. Potential costs resulting from time delays for necessary detours or e.g. from an increase of environmental or other stresses were neglected. The maximum intensity of the process served as a proxy for the duration of the road closure.</p>
      <p id="d1e1838"><?xmltex \hack{\newpage}?>The direct intangible costs for non-operational availability of the road
were approximated from statistical data accounting for the business
interruption and the loss of profits of the tourism sector in the village of
Obertauern due to road closure (see Table A9). The village of Obertauern is
a major regional tourism hot spot, and therefore the predominant income
revenues are based on tourism; thus other business divisions were neglected.
Regarding the precautionary expected losses only snow avalanches were
included, due to the obligatory legal implementation of monitoring by a
regional avalanche commission. Thus, a reliable procedure for a road closure
could be assumed.</p>
</sec>
</sec>
<sec id="Ch1.S4.SS3">
  <label>4.3</label><title>Risk computation</title>
      <p id="d1e1851">For the purpose of computing road risk, the risk Eqs. (A1) to (A5) from the
standard guideline (ASTRA, 2012), stated in the Appendix in conjunction with
Tables A1 to A5, were used without further modification both for the
deterministic and for the probabilistic calculation. Hence, the
probabilistic setup is based on the same equations as the standard approach,
but the variables were addressed with probability distributions instead of
single values. In a first step, the deterministic result was computed as a
base value for comparison with the results (probability density functions,
PDFs) of the two diverging probabilistic setups. In a second step, a
probabilistic model was integrated into the same calculation setup to
consider the bandwidth of the risk-contributing variables. Using this
probabilistic model, the individual risk variables were addressed with two
separate probability distributions. The flowchart in Fig. 1 illustrates the
risk assessment method and distinguishes between the deterministic and the
probabilistic risk model. The diagram exemplarily demonstrates the
calculation steps for both model setups. Whereas only the single value of
the input data was processed within the standard (deterministic) setup, the
probabilistic risk model utilized the bandwidth of each variable denoted in
Tables A6 to A9. These values were either defined from statistical data, expert judgement or existing literature. The range represents the assumed potential scatter of the variables including a minimum (lower bound <inline-formula><mml:math id="M87" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>), an expected or most likely value (<inline-formula><mml:math id="M88" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>) and a maximum value (upper bund <inline-formula><mml:math id="M89" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>). The deterministic setup was calculated with the expected value, which corresponds in most cases to the recommended input value of the guideline. The choice of the variable range in Tables A6 to A9 is case study specific and cannot be transferred to other studies without careful validation.</p>
<sec id="Ch1.S4.SS3.SSS1">
  <label>4.3.1</label><title>Probabilistic framework</title>
      <p id="d1e1882">Within the probabilistic risk modelling setup, the contributing variables
for computing the prognostic annual loss were calculated in a stochastic way
using their potential range. The probabilistic risk calculation was
conducted with the<?pagebreak page3143?> software package RIAAT – Risk Administration and
Analysis Tool (RiskConsult GmbH, 2015). The probabilistic setup comprised two
different and independent calculation runs each with two different
distribution functions to characterize the uncertainty of the input
variables. Hence, each variable was modelled using either (1) a triangular
or three-point distribution (TPD) or (2) a beta-PERT (programme evaluation and review technique) distribution (BPD)
within the probabilistic model, which generated two independent
probabilistic setups and results. The discrete risk calculation with two
different approaches of probability distributions facilitated a comparison
of the applicability and the sensitivity of the simple distribution
functions on the results. The expected annual monetary losses induced by the
three hazard types were aggregated and further compacted to the probability
density function (PDF) of the total risk caused by multi-hazard impact.
Finally, the two different PDFs from the stochastic risk assessment were
compared with the result from the deterministic method to show the potential
dynamics in the results.</p>
</sec>
<sec id="Ch1.S4.SS3.SSSx1" specific-use="unnumbered">
  <title>Triangular distribution (TPD)</title>
      <p id="d1e1891">The triangular distribution derives its statistical properties from the
geometry: it is defined by three parameters <inline-formula><mml:math id="M90" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula> for the lower bound, <inline-formula><mml:math id="M91" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula> for the most
likely value (the mode) and <inline-formula><mml:math id="M92" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula> for the upper bound. Whereas lower and upper bounds define on both edges the limited bandwidth, the most likely value indicates that values in the middle are more probable than the boundary values and also allows for the representation of skewness. The TPD is a popular distribution in the risk analysis field (Cottin and Döhler, 2013) for example to reproduce expert estimates. Especially if little or no
information about the actual distribution of the parameter or only an
estimate of the additional variables to fit the theoretical distribution is
feasible, a best possible approximation can be achieved using the TPD. If
there is no representative empirical data available as a basis for risk
prediction, complex analytical (theoretical) distributions, which are harder
to model and communicate, may not represent the reality better than a simple
triangular distribution (Sander, 2012).</p>
</sec>
<sec id="Ch1.S4.SS3.SSSx2" specific-use="unnumbered">
  <title>Beta-PERT distribution (BPD)</title>
      <p id="d1e1921">The beta-PERT distribution (programme evaluation and review technique) is a
simplification of the beta distribution with the advantage of an easier
modelling and application (Sander, 2012). It requires the same three
parameters as a triangular distribution: <inline-formula><mml:math id="M93" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula> for the lower bound, <inline-formula><mml:math id="M94" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula> for the most likely value (mode) and <inline-formula><mml:math id="M95" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula> for the upper bound. In contrast to the two parametric normal distribution <inline-formula><mml:math id="M96" display="inline"><mml:mrow><mml:mi>N</mml:mi><mml:mo>(</mml:mo><mml:mi mathvariant="italic">μ</mml:mi></mml:mrow></mml:math></inline-formula>, <inline-formula><mml:math id="M97" display="inline"><mml:mrow><mml:mi mathvariant="italic">σ</mml:mi><mml:mo>)</mml:mo></mml:mrow></mml:math></inline-formula> – <inline-formula><mml:math id="M98" display="inline"><mml:mi mathvariant="italic">μ</mml:mi></mml:math></inline-formula> for average and <inline-formula><mml:math id="M99" display="inline"><mml:mi mathvariant="italic">σ</mml:mi></mml:math></inline-formula> for standard deviation – the beta-PERT distribution is limited on the edges and allows for modelling asymmetric situations. Risk parameters commonly have a natural boundary, for example vulnerability factors ranging from 0 (no loss) to 1 (total loss). Therefore, estimating min–max values instead of standard deviation is more realistic or feasible, as there are in most cases no data available to express the mean variation. Moreover, BPD allows for smoother shapes, making it suitable to model a distribution that is actually an aggregation of several other distributions.</p>
      <p id="d1e1982">For a given number of risks, each with a probability of occurrence and an
individual probability distribution, the potential number of combinations
(scenarios) escalates nonlinearly. Especially if dependencies or correlations
between different risks are included and/or numerous partial risks are
aggregated to an overall risk the application of analytical methods have
computational restrictions. Stochastic simulations are better suited to work
on such complex models (Tecklenburg, 2003). Therefore, the aggregation of
the distributions were calculated by means of Latin hypercube sampling (LHS),
which is a stochastic simulation technique comparable to Monte Carlo
simulation (MCS) with the advantages of faster data processing, better
fitting on the theoretical input distribution and more efficient
calculation, as fewer iterations are needed to get equally good results
(Sander, 2012). LHS consistently produces values for the distribution's
statistics that are nearer to the theoretical values of the input
distribution than MCS. These advantages are possible because the real random
numbers used to select samples for the MCS tend to have local clusters,
which are only averaged out for a very large number of draws. Addressing
this issue using LHS can immediately improve the quality of the result by
splitting the probability distribution into <inline-formula><mml:math id="M100" display="inline"><mml:mi>n</mml:mi></mml:math></inline-formula> intervals of equal probability, where <inline-formula><mml:math id="M101" display="inline"><mml:mi>n</mml:mi></mml:math></inline-formula> is the number of iterations that are to be performed on the model. In the present study, 1 000 000 iterations where performed for every single simulation to get consistent results.</p>
</sec>
</sec>
</sec>
<sec id="Ch1.S5">
  <label>5</label><title>Results and discussion</title>
      <p id="d1e2010">In Table 3 the results for each risk group (<inline-formula><mml:math id="M102" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, <inline-formula><mml:math id="M103" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> and <inline-formula><mml:math id="M104" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>) as well as for the total multi-hazard risk <inline-formula><mml:math id="M105" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> calculated with the standard deterministic risk approach are shown and compared to those obtained by the two probabilistic setups using two different probability distributions (TPD and BPD). The results associated with the two distribution functions are displayed as a median value of the PDF to show their deviation to the outcome of the standard approach. Based on our case study, the road risk over all hazard types and scenarios (multi-hazard risk) with the deterministic
approach results in EUR 76.0 thousand per year. The results with the probabilistic approach referring to the median of the PDFs amounts to a monetary risk of EUR 105.6 thousand per year (TPD) and EUR 90.9 thousand per year (BPD), respectively. Compared to the standard approach the median of the PDFs equals an increase of 38 % (BPD) and 19 % (TPD), depending on the choice of probability distribution to model the uncertainties of the input variables. Focusing on the 95th percentile (<inline-formula><mml:math id="M106" display="inline"><mml:mrow><mml:msub><mml:mi>P</mml:mi><mml:mn mathvariant="normal">95</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula>) of the results – non-exceedance probability of 95 %, shown<?pagebreak page3144?> in Fig. 3 – an increase of 79 % (TPD) and 46 % (BPD) to the deterministic result can be observed. Figure 3 illustrates, based on the Lorenz curves for the two distributions (TPD and BPD), the scale of deviation of the total multi-hazard risk <inline-formula><mml:math id="M107" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> within the probabilistic risk modelling and compared to the standard outcome. The graphs show the potential uncertainties of the risk computation, which can be covered by a suitable choice of a value-at-risk (VaR) level. For example, with a benchmark of the 95th percentile (<inline-formula><mml:math id="M108" display="inline"><mml:mrow><mml:msub><mml:mi>P</mml:mi><mml:mn mathvariant="normal">95</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula>), 95 % of the potential uncertainties within the risk calculation can be covered by using a probabilistic risk assessment approach. However, a suitable VaR level depends on the general safety requirement of the system as well as on the degree of uncertainty of the input variables.</p>

      <?xmltex \floatpos{t}?><fig id="Ch1.F3"><?xmltex \currentcnt{3}?><label>Figure 3</label><caption><p id="d1e2093">Lorenz curves for a <bold>(a)</bold> triangular distribution and <bold>(b)</bold> beta-PERT distribution showing the scale of deviation of the total multi-hazard risk <inline-formula><mml:math id="M109" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> within the probabilistic risk modelling and compared to the deterministic result (in units of thousands of EUR per year).</p></caption>
        <?xmltex \igopts{width=236.157874pt}?><graphic xlink:href="https://nhess.copernicus.org/articles/20/3135/2020/nhess-20-3135-2020-f03.png"/>

      </fig>

      <p id="d1e2119">Geological hazards (rockfall) contribute with a fraction of 7.8 % to the
total risk (or, in absolute numbers, EUR 5.9 thousand, see Table 3) based on
the deterministic model, which can be attributed to the relatively small
importance in comparison to the other hazard types in the study area.
Hydrological hazards pose the highest risk (50.5 %, or, in absolute
numbers, EUR 38.4 thousand per year) previous to avalanche hazards (41.7 %, or, in absolute numbers, EUR 31.7 thousand per year). Overall, <inline-formula><mml:math id="M110" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> (44.9 %; EUR 34.1 thousand per year) has the highest share on the total multi-hazard risk narrowly followed by <inline-formula><mml:math id="M111" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> (38.9 %; EUR 29.6 thousand per year), both associated with direct damage. The hydrological hazards (predominantly debris flow processes) with a portion of 76.5 % or EUR 26.1 thousand per year have a disproportionately high share on <inline-formula><mml:math id="M112" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> due to the high-intensity hazard impact. Similarly, the semi-empirical lethality factors shown in Table A7 have high values (<inline-formula><mml:math id="M113" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">λ</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0.8</mml:mn></mml:mrow></mml:math></inline-formula>) just like the impact of rockfall on cars with a probability of death of <inline-formula><mml:math id="M114" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">λ</mml:mi><mml:mi mathvariant="normal">R</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">1.0</mml:mn></mml:mrow></mml:math></inline-formula>. Thus, these event types yield in high monetary losses in contrast to snow avalanches with a lethality factor for a high intensity of <inline-formula><mml:math id="M115" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">λ</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0.2</mml:mn></mml:mrow></mml:math></inline-formula>. By modelling the hazard-specific lethality with probability functions a wider scatter can be achieved, but the effect still remains due to the heavy weight around the most likely value <inline-formula><mml:math id="M116" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>. The indirect losses related to <inline-formula><mml:math id="M117" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> with a fraction of 16.3 %, or, in absolute numbers, EUR 12.4 thousand per year have a minor portion because this risk group is only relevant for snow
avalanches.</p>

<?xmltex \floatpos{t}?><table-wrap id="Ch1.T3" specific-use="star"><?xmltex \currentcnt{3}?><label>Table 3</label><caption><p id="d1e2223">Comparison of the deterministic versus probabilistic results for the three risk categories depending on the three hazard types and the total collective risk with risk for persons <inline-formula><mml:math id="M118" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, asset risk <inline-formula><mml:math id="M119" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, disposability risk <inline-formula><mml:math id="M120" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> and total collective risk <inline-formula><mml:math id="M121" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> with absolute values (in units of thousands of EUR per year) in the first row and as percentage in the second row. For the probabilistic data, the median value of the triangular or three-point distribution (TPD) and the beta-PERT distribution (BPD) functions are displayed. Note that risk-based aggregated losses do not equal the sum of the sub-components because probabilistic metrics such as <inline-formula><mml:math id="M122" display="inline"><mml:mrow><mml:msub><mml:mi>P</mml:mi><mml:mn mathvariant="normal">50</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula> are not additive. Thus, the computational sum as well as the percentage are slightly different.</p></caption><oasis:table frame="topbot"><?xmltex \begin{scaleboxenv}{.88}[.88]?><oasis:tgroup cols="17">
     <oasis:colspec colnum="1" colname="col1" align="left"/>
     <oasis:colspec colnum="2" colname="col2" align="left"/>
     <oasis:colspec colnum="3" colname="col3" align="right"/>
     <oasis:colspec colnum="4" colname="col4" align="right"/>
     <oasis:colspec colnum="5" colname="col5" align="right"/>
     <oasis:colspec colnum="6" colname="col6" align="left"/>
     <oasis:colspec colnum="7" colname="col7" align="right"/>
     <oasis:colspec colnum="8" colname="col8" align="right"/>
     <oasis:colspec colnum="9" colname="col9" align="right"/>
     <oasis:colspec colnum="10" colname="col10" align="left"/>
     <oasis:colspec colnum="11" colname="col11" align="right"/>
     <oasis:colspec colnum="12" colname="col12" align="right"/>
     <oasis:colspec colnum="13" colname="col13" align="right"/>
     <oasis:colspec colnum="14" colname="col14" align="left"/>
     <oasis:colspec colnum="15" colname="col15" align="right"/>
     <oasis:colspec colnum="16" colname="col16" align="right"/>
     <oasis:colspec colnum="17" colname="col17" align="right"/>
     <oasis:thead>
       <oasis:row>
         <oasis:entry colname="col1">Risk category</oasis:entry>
         <oasis:entry colname="col2"/>
         <oasis:entry rowsep="1" namest="col3" nameend="col5" align="center"><inline-formula><mml:math id="M123" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col6"/>
         <oasis:entry rowsep="1" namest="col7" nameend="col9" align="center"><inline-formula><mml:math id="M124" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col10"/>
         <oasis:entry rowsep="1" namest="col11" nameend="col13" align="center"><inline-formula><mml:math id="M125" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col14"/>
         <oasis:entry rowsep="1" namest="col15" nameend="col17" align="center"><inline-formula><mml:math id="M126" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1">Hazard type</oasis:entry>
         <oasis:entry colname="col2">Unit</oasis:entry>
         <oasis:entry colname="col3">Det.</oasis:entry>
         <oasis:entry colname="col4">TPD</oasis:entry>
         <oasis:entry colname="col5">BPD</oasis:entry>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7">Det.</oasis:entry>
         <oasis:entry colname="col8">TPD</oasis:entry>
         <oasis:entry colname="col9">BPD</oasis:entry>
         <oasis:entry colname="col10"/>
         <oasis:entry colname="col11">Det.</oasis:entry>
         <oasis:entry colname="col12">TPD</oasis:entry>
         <oasis:entry colname="col13">BPD</oasis:entry>
         <oasis:entry colname="col14"/>
         <oasis:entry colname="col15">Det.</oasis:entry>
         <oasis:entry colname="col16">TPD</oasis:entry>
         <oasis:entry colname="col17">BPD</oasis:entry>
       </oasis:row>
     </oasis:thead>
     <oasis:tbody>
       <oasis:row>
         <oasis:entry colname="col1">Geological hazards</oasis:entry>
         <oasis:entry colname="col2">EUR (thousands per year)</oasis:entry>
         <oasis:entry colname="col3">5.4</oasis:entry>
         <oasis:entry colname="col4">10.5</oasis:entry>
         <oasis:entry colname="col5">7.8</oasis:entry>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7">0.47</oasis:entry>
         <oasis:entry colname="col8">0.43</oasis:entry>
         <oasis:entry colname="col9">0.44</oasis:entry>
         <oasis:entry colname="col10"/>
         <oasis:entry colname="col11">0</oasis:entry>
         <oasis:entry colname="col12">0</oasis:entry>
         <oasis:entry colname="col13">0</oasis:entry>
         <oasis:entry colname="col14"/>
         <oasis:entry colname="col15">5.9</oasis:entry>
         <oasis:entry colname="col16">10.9</oasis:entry>
         <oasis:entry colname="col17">8.3</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">%</oasis:entry>
         <oasis:entry colname="col3">15.8</oasis:entry>
         <oasis:entry colname="col4">17.0</oasis:entry>
         <oasis:entry colname="col5">16.3</oasis:entry>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7">1.6</oasis:entry>
         <oasis:entry colname="col8">1.4</oasis:entry>
         <oasis:entry colname="col9">1.5</oasis:entry>
         <oasis:entry colname="col10"/>
         <oasis:entry colname="col11">0</oasis:entry>
         <oasis:entry colname="col12">0</oasis:entry>
         <oasis:entry colname="col13">0</oasis:entry>
         <oasis:entry colname="col14"/>
         <oasis:entry colname="col15">7.8</oasis:entry>
         <oasis:entry colname="col16">10.3</oasis:entry>
         <oasis:entry colname="col17">9.1</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1">Hydrological hazards</oasis:entry>
         <oasis:entry colname="col2">EUR (thousands per year)</oasis:entry>
         <oasis:entry colname="col3">26.1</oasis:entry>
         <oasis:entry colname="col4">42.3</oasis:entry>
         <oasis:entry colname="col5">34.5</oasis:entry>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7">12.3</oasis:entry>
         <oasis:entry colname="col8">13.9</oasis:entry>
         <oasis:entry colname="col9">13.1</oasis:entry>
         <oasis:entry colname="col10"/>
         <oasis:entry colname="col11">0</oasis:entry>
         <oasis:entry colname="col12">0</oasis:entry>
         <oasis:entry colname="col13">0</oasis:entry>
         <oasis:entry colname="col14"/>
         <oasis:entry colname="col15">38.4</oasis:entry>
         <oasis:entry colname="col16">56.2</oasis:entry>
         <oasis:entry colname="col17">47.6</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">%</oasis:entry>
         <oasis:entry colname="col3">76.5</oasis:entry>
         <oasis:entry colname="col4">68.3</oasis:entry>
         <oasis:entry colname="col5">71.9</oasis:entry>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7">41.6</oasis:entry>
         <oasis:entry colname="col8">45.6</oasis:entry>
         <oasis:entry colname="col9">43.5</oasis:entry>
         <oasis:entry colname="col10"/>
         <oasis:entry colname="col11">0</oasis:entry>
         <oasis:entry colname="col12">0</oasis:entry>
         <oasis:entry colname="col13">0</oasis:entry>
         <oasis:entry colname="col14"/>
         <oasis:entry colname="col15">50.5</oasis:entry>
         <oasis:entry colname="col16">53.2</oasis:entry>
         <oasis:entry colname="col17">52.4</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1">Avalanche hazards</oasis:entry>
         <oasis:entry colname="col2">EUR (thousands per year)</oasis:entry>
         <oasis:entry colname="col3">2.6</oasis:entry>
         <oasis:entry colname="col4">8.4</oasis:entry>
         <oasis:entry colname="col5">5.3</oasis:entry>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7">16.8</oasis:entry>
         <oasis:entry colname="col8">16.2</oasis:entry>
         <oasis:entry colname="col9">16.6</oasis:entry>
         <oasis:entry colname="col10"/>
         <oasis:entry colname="col11">12.4</oasis:entry>
         <oasis:entry colname="col12">13.1</oasis:entry>
         <oasis:entry colname="col13">12.7</oasis:entry>
         <oasis:entry colname="col14"/>
         <oasis:entry colname="col15">31.7</oasis:entry>
         <oasis:entry colname="col16">37.9</oasis:entry>
         <oasis:entry colname="col17">34.7</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">%</oasis:entry>
         <oasis:entry colname="col3">7.6</oasis:entry>
         <oasis:entry colname="col4">13.6</oasis:entry>
         <oasis:entry colname="col5">11.0</oasis:entry>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7">56.8</oasis:entry>
         <oasis:entry colname="col8">53.1</oasis:entry>
         <oasis:entry colname="col9">55.1</oasis:entry>
         <oasis:entry colname="col10"/>
         <oasis:entry colname="col11">100</oasis:entry>
         <oasis:entry colname="col12">100</oasis:entry>
         <oasis:entry colname="col13">100</oasis:entry>
         <oasis:entry colname="col14"/>
         <oasis:entry colname="col15">41.7</oasis:entry>
         <oasis:entry colname="col16">35.9</oasis:entry>
         <oasis:entry colname="col17">38.2</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1">Total</oasis:entry>
         <oasis:entry colname="col2">EUR (thousands per year)</oasis:entry>
         <oasis:entry colname="col3">34.1</oasis:entry>
         <oasis:entry colname="col4">61.9</oasis:entry>
         <oasis:entry colname="col5">48.0</oasis:entry>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7">29.6</oasis:entry>
         <oasis:entry colname="col8">30.5</oasis:entry>
         <oasis:entry colname="col9">30.1</oasis:entry>
         <oasis:entry colname="col10"/>
         <oasis:entry colname="col11">12.4</oasis:entry>
         <oasis:entry colname="col12">13.1</oasis:entry>
         <oasis:entry colname="col13">12.7</oasis:entry>
         <oasis:entry colname="col14"/>
         <oasis:entry colname="col15">76.0</oasis:entry>
         <oasis:entry colname="col16">105.6</oasis:entry>
         <oasis:entry colname="col17">90.9</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">%</oasis:entry>
         <oasis:entry colname="col3">44.9</oasis:entry>
         <oasis:entry colname="col4">58.6</oasis:entry>
         <oasis:entry colname="col5">52.8</oasis:entry>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7">38.9</oasis:entry>
         <oasis:entry colname="col8">28.9</oasis:entry>
         <oasis:entry colname="col9">33.1</oasis:entry>
         <oasis:entry colname="col10"/>
         <oasis:entry colname="col11">16.3</oasis:entry>
         <oasis:entry colname="col12">12.4</oasis:entry>
         <oasis:entry colname="col13">14.0</oasis:entry>
         <oasis:entry colname="col14"/>
         <oasis:entry colname="col15">100</oasis:entry>
         <oasis:entry colname="col16">100</oasis:entry>
         <oasis:entry colname="col17">100</oasis:entry>
       </oasis:row>
     </oasis:tbody>
   </oasis:tgroup><?xmltex \end{scaleboxenv}?></oasis:table></table-wrap>

      <p id="d1e2866">The results related to our case study (Table 3 and Fig. 4) show that due to
the shape and the mathematical definition of the distribution the TPD leads
to the highest variation in the monetary losses. The boxplots in Fig. 4
display the results from the probabilistic simulation for the three risk
categories (<inline-formula><mml:math id="M127" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, <inline-formula><mml:math id="M128" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> and <inline-formula><mml:math id="M129" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>) and for the total hazard-specific risk (<inline-formula><mml:math id="M130" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>) relating to the three hazard types (Fig. 3a–c) and for the total multi-hazard collective risk (Fig. 4d) with respect to the measures of the central tendency of the PDF. The boxplot diagrams are thereby plotted against the deterministic value to show its position. The wide range of the distribution in <inline-formula><mml:math id="M131" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> is markedly caused by <inline-formula><mml:math id="M132" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, which exhibits a broad bandwidth and a right-skewed distribution. Hence, unlike <inline-formula><mml:math id="M133" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> and <inline-formula><mml:math id="M134" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, the physical injuries expressed as the economic losses of persons (<inline-formula><mml:math id="M135" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>) are responsible for the highest divergence to the standard approach and show a considerable scatter. The main causes for the striking deviations can be associated with the relatively high monetary value of persons which was modelled as discrete point value in combination with the
fluctuations of the MDT and the variations of the hazard-specific lethality.
The monetized costs for a statistical human life equal EUR 3 million (Table A7) and are based on a statistical survey of the economic expenses for a road accident in Austria (BMVIT, 2014). Although we ascribe this value to a high degree of uncertainty the valuation of the expenses for a statistical human life was not attributed to a probability distribution due to the case-study-specific fixed governmental requirements in Austria. The discussion of
a monetarily evaluation of a human life is still ongoing across scientific
disciplines using different economic approaches (e.g. Hood, 2017). Furthermore, the lethality factors also correspond to the high variation of <inline-formula><mml:math id="M136" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> which are seen as very sensitive parameters. Therefore, we
encourage further research on hazard-specific lethality functions for road
risk management either based on comprehensive empirical datasets or on
representative hazard impact modelling. Due to the strong effect of <inline-formula><mml:math id="M137" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> on <inline-formula><mml:math id="M138" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> the results have to be carefully interpreted, as they are sensitive to the input variables. Therefore, the<?pagebreak page3145?> values in our case study especially the cost for human life cannot be directly transferred to other application without a detailed validation and verification of national regulations.</p>

      <?xmltex \floatpos{t}?><fig id="Ch1.F4" specific-use="star"><?xmltex \currentcnt{4}?><label>Figure 4</label><caption><p id="d1e3005">Probabilistic results for the three risk categories per
hazard type (<bold>a</bold> torrent processes, <bold>b</bold> snow avalanches and <bold>c</bold> rockfall) and for the total collective risk <bold>(d)</bold> based on the two distribution functions triangular or three-point distribution (TPD) and the beta-PERT distribution (BPD) with risk for persons <inline-formula><mml:math id="M139" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, asset risk <inline-formula><mml:math id="M140" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, disposability risk <inline-formula><mml:math id="M141" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> and total collective risk <inline-formula><mml:math id="M142" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> (in units of thousands of EUR per year).</p></caption>
        <?xmltex \igopts{width=426.791339pt}?><graphic xlink:href="https://nhess.copernicus.org/articles/20/3135/2020/nhess-20-3135-2020-f04.png"/>

      </fig>

      <p id="d1e3071">Apart from <inline-formula><mml:math id="M143" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> where the deterministic result is located below or near the 5th percentile of both PDFs, <inline-formula><mml:math id="M144" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> and <inline-formula><mml:math id="M145" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> are mostly within the interquartile range between the 25th quartile and the median compared to the standard approach (Fig. 4). In this context, <inline-formula><mml:math id="M146" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> for snow avalanche exceeds the median and is situated between the median and the 75th quartile. The effect can be traced back to the left-skewed distribution of the vulnerability factor <inline-formula><mml:math id="M147" display="inline"><mml:mrow><mml:msub><mml:mi>v</mml:mi><mml:mrow><mml:mi mathvariant="normal">B</mml:mi><mml:mo>,</mml:mo><mml:mi mathvariant="normal">A</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula> for medium avalanche hazard intensities regarding the object class structures (bridges and culverts) in Table A8. In general, due to the shape and the mathematical characteristics of the distribution, the BPD leads to a stronger compaction around the median than the TPD which can be well explained by the properties of the BPD which has, in comparison to the TPD, a larger weight around the most likely value <inline-formula><mml:math id="M148" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>.</p>

      <?xmltex \floatpos{t}?><fig id="Ch1.F5"><?xmltex \currentcnt{5}?><label>Figure 5</label><caption><p id="d1e3144">Probability density function (PDF) and cumulative distribution function (CDF) for a <bold>(a)</bold> triangular distribution and <bold>(b)</bold> beta-PERT distribution (in units of thousands of EUR per year).</p></caption>
        <?xmltex \igopts{width=236.157874pt}?><graphic xlink:href="https://nhess.copernicus.org/articles/20/3135/2020/nhess-20-3135-2020-f05.png"/>

      </fig>

      <p id="d1e3160">In Fig. 5, the PDF and the cumulative distribution function (CDF) are shown
for <inline-formula><mml:math id="M149" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> with the two probabilistic model results and the deterministic result. In both cases (TPD and BPD), the deterministic result is situated at the lower edge of the PDF near or under the 5th percentile. Thus, the deterministic result of our case study covers approximately less than 5 % of the potential bandwidth of the probability distribution. The TPD has a wide range, whereas the BPD is considerably flattened on the boundary of the amplitude. The results of the two distributions have in common that they are allocated right skewed. In contrast to the location of the median, the deterministic result is on the far-left side of both distributions and is exceeded by more than 95 % of the potential outcome.</p>
</sec>
<sec id="Ch1.S6" sec-type="conclusions">
  <label>6</label><title>Conclusion</title>
      <p id="d1e3182">The results based on our case study provide evidence that the monetary risk
calculated with a standard deterministic method following the conventional
guidelines is lower than applying a probabilistic approach. Thus, without
consideration of uncertainty of the input variables risk might be
underestimated using the operational standard risk assessment approach for
road infrastructure. The mathematical product of the frequency of occurrence
and the potential consequences with single values and, in a narrower sense,
the multiplication of the partial risk factors in the second part of the
risk equation may lead to a bias in the risk magnitude because the
multiplication of the ancillary calculations generates a theoretical value
ignoring the full scope of the total risk.</p>
      <p id="d1e3185">The far-left position of the deterministic value within the PDF of the
probabilistic result in our study can be traced back to fact that the
multiplication of two positive symmetrical distributions results in a
right-skewed distribution because the product of the small numbers at the
lower ends of the bandwidths results in much smaller numbers than the
product of the high numbers at the upper ends of the bandwidths. When
right-skewed distributions are used as an input and aggregated, the effect of
skewness shifts the deterministic value (represented by the most likely
value) to the left side of the resulting distribution. Even if conservative
risk values are used in a deterministic setup, a potential scatter (upper
and lower bounds) remains, which leads within a probabilistic calculation
through aggregation of the partial risk elements and sub-results to a
right-skewed distribution according to the skewness of input variables.
Since risk values of our study are in most cases asymmetric with primarily
positive skews, the deterministic result migrates during aggregation to the
left side of the PDF in Fig. 5. The deterministic risk value is usually
expressed either as a theoretical mean value or as the most likely value,
neglecting the potential<?pagebreak page3146?> distribution functions of the input data. Thus, the
compression of the input values to a single deterministic risk value with
total determination prevents an actual prognosis of reliability that would
have been achieved by specifying bandwidths (Sander, 2012). Furthermore, the
simple summation of the scenario related and the object-based risk to
receive the cumulative risk level instead of using probabilistic risk
aggregation leads to an underestimation of the final risk. Hence, the full
spectrum of risk cannot be represented with deterministic risk assessment,
which may further lead to biased decisions on risk mitigation.</p>
      <p id="d1e3188">The value-at-risk (VaR) approach by considering a reliable percentile of the
non-exceedance probability e.g. <inline-formula><mml:math id="M150" display="inline"><mml:mrow><mml:msub><mml:mi>P</mml:mi><mml:mn mathvariant="normal">95</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula> as shown in Fig. 3 – depending on the desired coverage of the risk potential from society, authorities or
organizations – might be an appropriate concept to tackle this challenge.
In this context, a higher VaR value implies a higher safety level for the
system under investigation. The final results of risk assessments are
subject to uncertainties mainly due to insufficient data basis of input
variables, which can be addressed using a PDF to represent uncertainties
involved. For further decisions on the realization of mitigation measures a
high VaR value such as <inline-formula><mml:math id="M151" display="inline"><mml:mrow><mml:msub><mml:mi>P</mml:mi><mml:mn mathvariant="normal">95</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula> covers these uncertainties with a defined
shortfall probability and thus supports decision-makers with more
information about road risk. In turn, as a further practical improvement this
benchmark can be compared to the same grade of safety for the costs of
mitigation measures, since cost assessments for defence structures are also
subject to considerable uncertainties. Thus, an optimal risk-based design of
defence structures might encompass a balance between the same VaR level both
of a probabilistic risk and a probabilistic cost assessment utilizing a cost–benefit analysis (CBA). However, within a probabilistic approach the scale
of deviation is dependent on the choice of distribution for modelling the
bandwidth of the variables, and the results are sensitive to the defined
spectrum of input information stated in Tables A6–A9. These variables are
case study specific and cannot be directly transferred to other road risk
assessments without careful validation. However, probabilistic risk
assessment (PRA) enables a transparent representation of potential losses
due to the explicit consideration of the entire potential bandwidth of the
variables contributing to risk. Since comparable results can be achieved
based on predefined values (Bründl et al., 2009), we still recommend the
consideration of the deterministic value as a comparative value to the
probabilistic method.</p>
      <p id="d1e3213">Road risk assessment is usually afflicted with data scarcity; thus, risk
operators and practitioners are often dependent on expert appraisals, which
are subject to uncertainties. In order to improve data quality, upper and
lower values and the expected value can be easily estimated for fitting a
simple distribution of the input variables. Even though empirical values
such as statistical data are available, a certain degree of uncertainty
remains. Therefore, simple distribution<?pagebreak page3147?> functions such as TPD or BPD can
adjust the shape of the distribution more conveniently than complex
probability distributions, since the required additional parameters to
adjust a complex distribution are simple not available. Hence, for a
prognostic prediction, risk modelling with complex distributions in contrast
to simple techniques cannot be justified if there is a lack of empirical
data.</p>
      <p id="d1e3217"><?xmltex \hack{\newpage}?>A limitation of our study is that the performance of the probabilistic
approach cannot be verified and validated with empirical data, but the
results show that the explicit inclusion of epistemic uncertainty leads to a
bias in risk magnitude. The probabilistic approach allows for the quantification of
uncertainty and thus enables decision-makers to better assess the quality
and validity of the results from road risk assessments. This can facilitate
the improvement of road safety guidelines (for example by implementing a VaR
concept) and thus is of particular importance for authorities responsible
for operational road safety, for design engineers and for policymakers due
to a general increase of information for optimal decision-making under
budget constraints. Furthermore, the paper addresses the second part of the
risk concept in terms of the consequence analysis. The results of the hazard
analysis serve thereby as a constant input using the physical modelling of
the hazard processes without the consideration of probabilistic methods.
Thus, the probability of occurrence of the hazard processes was
mathematically processed as a point value within the probabilistic design,
since the hazard analyses (with deterministic design events to assess the
hazard intensities as a function of the return interval) was part of prior
technical studies. Further considerations of a probabilistic modelling of
the frequency of the events were outside of the study design and might be
addressed in subsequent studies. Therefore, we expect a considerable source
of epistemic uncertainty within the hazard analysis which emphasizes the
necessity for the additional inclusion of probability-based hazard analyses
in a holistic multi-hazard risk environment. Even though the presented
methodology in this study focuses on a road segment exposed to a
multi-hazard environment on a local scale, the approach can easily be
transferred to other risk-oriented purposes.</p><?xmltex \hack{\clearpage}?>
</sec>

      
      </body>
    <back><app-group>

<?pagebreak page3148?><app id="App1.Ch1.S1">
  <?xmltex \currentcnt{A}?><label>Appendix A</label><title>Risk equations according to ASTRA (2012) guidelines</title>
<sec id="App1.Ch1.S1.SS1">
  <label>A1</label><?xmltex \opttitle{Risk for persons~$R_{\mathrm{P}}$}?><title>Risk for persons <inline-formula><mml:math id="M152" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></title>
<sec id="App1.Ch1.S1.SS1.SSS1">
  <label>A1.1</label><title>Direct impact of the hazard event – standard situation</title>
      <p id="d1e3258"><disp-formula id="App1.Ch1.S1.E3" content-type="numbered"><label>A1</label><mml:math id="M153" display="block"><mml:mtable rowspacing="0.2ex" columnspacing="1em" class="split" displaystyle="true" columnalign="right left"><mml:mtr><mml:mtd><mml:mrow><mml:msub><mml:mi>r</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">DI</mml:mi><mml:mo>)</mml:mo><mml:mi mathvariant="normal">NS</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:mtd><mml:mtd><mml:mrow><mml:mo>=</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mi>j</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:mfenced close=")" open="("><mml:mrow><mml:mn mathvariant="normal">1</mml:mn><mml:mo>-</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">Rb</mml:mi></mml:msub></mml:mrow></mml:mfenced><mml:mo>×</mml:mo><mml:mfenced close=")" open="("><mml:mrow><mml:mn mathvariant="normal">1</mml:mn><mml:mo>-</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">RbE</mml:mi></mml:msub></mml:mrow></mml:mfenced><mml:mo>×</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">N</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:mtd></mml:mtr><mml:mtr><mml:mtd/><mml:mtd><mml:mrow><mml:mo>×</mml:mo><mml:mi mathvariant="italic">λ</mml:mi><mml:mo>×</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mrow><mml:mi mathvariant="normal">So</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub><mml:mo>×</mml:mo><mml:msub><mml:mi>f</mml:mi><mml:mi mathvariant="normal">L</mml:mi></mml:msub></mml:mrow></mml:mtd></mml:mtr></mml:mtable></mml:math></disp-formula></p><?xmltex \hack{\clearpage}?><?xmltex \floatpos{h!}?><table-wrap id="App1.Ch1.S1.T4"><?xmltex \hack{\hsize\textwidth}?><?xmltex \currentcnt{A1}?><label>Table A1</label><caption><p id="d1e3364">Risk variables and their derivation for the calculation
of <inline-formula><mml:math id="M154" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>: direct impact – standard situation. <inline-formula><mml:math id="M155" display="inline"><mml:msup><mml:mi/><mml:mn mathvariant="normal">1</mml:mn></mml:msup></mml:math></inline-formula> The reduction
factor considers that not all hazard areas get simultaneously released by
the same triggering event. <inline-formula><mml:math id="M156" display="inline"><mml:msup><mml:mi/><mml:mn mathvariant="normal">2</mml:mn></mml:msup></mml:math></inline-formula> The number of hazard areas for the
three hazard types was calculated as discrete values based on field surveys
according to the release probability as a function of the event frequency
(avalanches: <inline-formula><mml:math id="M157" display="inline"><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mrow><mml:mi mathvariant="normal">A</mml:mi><mml:mn mathvariant="normal">10</mml:mn></mml:mrow></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">6</mml:mn></mml:mrow></mml:math></inline-formula>, <inline-formula><mml:math id="M158" display="inline"><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mrow><mml:mi mathvariant="normal">A</mml:mi><mml:mn mathvariant="normal">30</mml:mn></mml:mrow></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">7</mml:mn></mml:mrow></mml:math></inline-formula>; torrent
processes: <inline-formula><mml:math id="M159" display="inline"><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mrow><mml:mi>T</mml:mi><mml:mn mathvariant="normal">10</mml:mn></mml:mrow></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">7</mml:mn></mml:mrow></mml:math></inline-formula>, <inline-formula><mml:math id="M160" display="inline"><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mrow><mml:mi>T</mml:mi><mml:mn mathvariant="normal">30</mml:mn></mml:mrow></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">8</mml:mn></mml:mrow></mml:math></inline-formula>; rockfall: <inline-formula><mml:math id="M161" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">RbE</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">0</mml:mn></mml:mrow></mml:math></inline-formula>, not relevant). <inline-formula><mml:math id="M162" display="inline"><mml:msup><mml:mi/><mml:mn mathvariant="normal">3</mml:mn></mml:msup></mml:math></inline-formula> The length of the affected street segment is a discrete (single) value according to the results of the hazard analyses.</p></caption><oasis:table frame="topbot"><oasis:tgroup cols="3">
     <oasis:colspec colnum="1" colname="col1" align="left"/>
     <oasis:colspec colnum="2" colname="col2" align="left"/>
     <oasis:colspec colnum="3" colname="col3" align="left"/>
     <oasis:thead>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1">Variable</oasis:entry>
         <oasis:entry colname="col2">Description</oasis:entry>
         <oasis:entry colname="col3">Derivation</oasis:entry>
       </oasis:row>
     </oasis:thead>
     <oasis:tbody>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M163" display="inline"><mml:mrow><mml:msub><mml:mi>r</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">DI</mml:mi><mml:mo>)</mml:mo><mml:mi mathvariant="normal">NS</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Risk of persons in scenario <inline-formula><mml:math id="M164" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula> (normal</oasis:entry>
         <oasis:entry colname="col3"/>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">situation)</oasis:entry>
         <oasis:entry colname="col3"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M165" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi>j</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Probability of occurrence of an event</oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M166" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi>j</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:msub><mml:mi>f</mml:mi><mml:mi>j</mml:mi></mml:msub><mml:mo>-</mml:mo><mml:msub><mml:mi>f</mml:mi><mml:mrow><mml:mi>j</mml:mi><mml:mo>+</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula>; <inline-formula><mml:math id="M167" display="inline"><mml:mrow><mml:msub><mml:mi>f</mml:mi><mml:mi>j</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mstyle displaystyle="false"><mml:mfrac style="text"><mml:mn mathvariant="normal">1</mml:mn><mml:mrow><mml:msub><mml:mi>T</mml:mi><mml:mi>j</mml:mi></mml:msub></mml:mrow></mml:mfrac></mml:mstyle></mml:mrow></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">(frequency of a scenario <inline-formula><mml:math id="M168" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula>)</oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M169" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi>j</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>: probability of occurrence of scenario <inline-formula><mml:math id="M170" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M171" display="inline"><mml:mrow><mml:msub><mml:mi>f</mml:mi><mml:mi>j</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>: frequency of occurrence</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M172" display="inline"><mml:mrow><mml:msub><mml:mi>T</mml:mi><mml:mi>j</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>: return period of scenario <inline-formula><mml:math id="M173" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M174" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">Rb</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Probability of precautionary road</oasis:entry>
         <oasis:entry colname="col3"/>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">blockage</oasis:entry>
         <oasis:entry colname="col3"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M175" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">RbE</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Probability of a road blockage due to an</oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M176" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mrow><mml:mi>R</mml:mi><mml:mi>b</mml:mi><mml:mi>E</mml:mi></mml:mrow></mml:msub><mml:mo>=</mml:mo><mml:mi mathvariant="italic">α</mml:mi><mml:mo>×</mml:mo><mml:mfenced open="(" close=")"><mml:mrow><mml:mn mathvariant="normal">1</mml:mn><mml:mo>-</mml:mo><mml:mstyle displaystyle="false"><mml:mfrac style="text"><mml:mn mathvariant="normal">1</mml:mn><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mi mathvariant="normal">H</mml:mi></mml:msub></mml:mrow></mml:mfrac></mml:mstyle></mml:mrow></mml:mfenced></mml:mrow></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">event (road closure due to a previous</oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M177" display="inline"><mml:mi mathvariant="italic">α</mml:mi></mml:math></inline-formula>: reduction factor<inline-formula><mml:math id="M178" display="inline"><mml:msup><mml:mi/><mml:mn mathvariant="normal">1</mml:mn></mml:msup></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">event of the same hazard type along the</oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M179" display="inline"><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mi mathvariant="normal">H</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>: number of hazard areas with the same hazard</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">road)</oasis:entry>
         <oasis:entry colname="col3">process and triggering mechanism<inline-formula><mml:math id="M180" display="inline"><mml:msup><mml:mi/><mml:mn mathvariant="normal">2</mml:mn></mml:msup></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M181" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">N</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Probability of the standard (normal)</oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M182" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">N</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mn mathvariant="normal">1</mml:mn><mml:mo>-</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">situation</oasis:entry>
         <oasis:entry colname="col3"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M183" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Probability of a traffic jam (congestion)</oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M184" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mfenced close=")" open="("><mml:mstyle displaystyle="false"><mml:mfrac style="text"><mml:mi>n</mml:mi><mml:mn mathvariant="normal">365</mml:mn></mml:mfrac></mml:mstyle></mml:mfenced><mml:mo>×</mml:mo><mml:mfenced close=")" open="("><mml:mstyle displaystyle="false"><mml:mfrac style="text"><mml:mi>D</mml:mi><mml:mn mathvariant="normal">24</mml:mn></mml:mfrac></mml:mstyle></mml:mfenced></mml:mrow></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M185" display="inline"><mml:mi>n</mml:mi></mml:math></inline-formula>: number of traffic jams per year</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M186" display="inline"><mml:mi>D</mml:mi></mml:math></inline-formula>: average duration of a traffic jam in hours (h)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M187" display="inline"><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">p</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Number of affected persons</oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M188" display="inline"><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">V</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:mi mathvariant="italic">β</mml:mi></mml:mrow></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M189" display="inline"><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">VN</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mstyle displaystyle="false"><mml:mfrac style="text"><mml:mrow><mml:mi>M</mml:mi><mml:mi>D</mml:mi><mml:mi>T</mml:mi></mml:mrow><mml:mrow><mml:mi>v</mml:mi><mml:mo>×</mml:mo><mml:mn mathvariant="normal">24</mml:mn><mml:mspace linebreak="nobreak" width="0.125em"/><mml:mn mathvariant="normal">000</mml:mn></mml:mrow></mml:mfrac></mml:mstyle><mml:mo>×</mml:mo><mml:mi>l</mml:mi></mml:mrow></mml:math></inline-formula>: number of vehicles in the</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3">standard situation</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M190" display="inline"><mml:mrow><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">VJ</mml:mi></mml:msub><mml:mo>=</mml:mo><mml:mstyle displaystyle="false"><mml:mfrac style="text"><mml:mrow><mml:mfenced close=")" open="("><mml:mrow><mml:msub><mml:mi mathvariant="italic">ρ</mml:mi><mml:mi mathvariant="normal">max</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:mi>l</mml:mi></mml:mrow></mml:mfenced></mml:mrow><mml:mn mathvariant="normal">1000</mml:mn></mml:mfrac></mml:mstyle></mml:mrow></mml:math></inline-formula>: number of vehicles in the case of a</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3">traffic jam</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3">MDT: mean daily traffic</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M191" display="inline"><mml:mi>v</mml:mi></mml:math></inline-formula>: signalized velocity for cars in kilometres per hour (km h<inline-formula><mml:math id="M192" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula>)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M193" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>: length of the street segment in meters (m)<inline-formula><mml:math id="M194" display="inline"><mml:msup><mml:mi/><mml:mn mathvariant="normal">3</mml:mn></mml:msup></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M195" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">ρ</mml:mi><mml:mi mathvariant="normal">max</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>: maximum traffic density per lane and</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3">kilometre in the case of a traffic jam</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M196" display="inline"><mml:mi mathvariant="italic">β</mml:mi></mml:math></inline-formula>: mean degree of passengers</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M197" display="inline"><mml:mi mathvariant="italic">λ</mml:mi></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Lethality factor</oasis:entry>
         <oasis:entry colname="col3">Hazard-process- and intensity-related variable</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3">(<inline-formula><mml:math id="M198" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">λ</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, <inline-formula><mml:math id="M199" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">λ</mml:mi><mml:mi mathvariant="normal">F</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>, <inline-formula><mml:math id="M200" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">λ</mml:mi><mml:mi mathvariant="normal">R</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> and <inline-formula><mml:math id="M201" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">λ</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> in Table A7)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M202" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mrow><mml:mi mathvariant="normal">So</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Spatial occurrence probability of the</oasis:entry>
         <oasis:entry colname="col3">For rockfall processes <inline-formula><mml:math id="M203" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mrow><mml:mi mathvariant="normal">So</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub><mml:mo>=</mml:mo><mml:mi mathvariant="normal">ET</mml:mi><mml:mo>×</mml:mo><mml:mstyle displaystyle="false"><mml:mfrac style="text"><mml:mi>d</mml:mi><mml:mrow><mml:msub><mml:mi>w</mml:mi><mml:mi mathvariant="normal">HD</mml:mi></mml:msub></mml:mrow></mml:mfrac></mml:mstyle></mml:mrow></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">process in the scenario <inline-formula><mml:math id="M204" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula> as proportion of</oasis:entry>
         <oasis:entry colname="col3">ET: event type</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">the mean width or area of the process</oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M205" display="inline"><mml:mi>d</mml:mi></mml:math></inline-formula>: mean diameter of the block in metres (m)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">domain in scenario <inline-formula><mml:math id="M206" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula> to the maximum</oasis:entry>
         <oasis:entry colname="col3"><inline-formula><mml:math id="M207" display="inline"><mml:mrow><mml:msub><mml:mi>w</mml:mi><mml:mi mathvariant="normal">HD</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> <inline-formula><mml:math id="M208" display="inline"><mml:mo>=</mml:mo></mml:math></inline-formula> width or amplitude of the hazard domain in</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">width or area of the potential hazard</oasis:entry>
         <oasis:entry colname="col3">scenario <inline-formula><mml:math id="M209" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">domain</oasis:entry>
         <oasis:entry colname="col3"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M210" display="inline"><mml:mrow><mml:msub><mml:mi>f</mml:mi><mml:mi mathvariant="normal">L</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Factor to differentiate the affected lane</oasis:entry>
         <oasis:entry colname="col3">0.5: one lane affected</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3">1: whole road (both lanes) affected</oasis:entry>
       </oasis:row>
     </oasis:tbody>
   </oasis:tgroup></oasis:table></table-wrap>

<?xmltex \hack{\clearpage}?>
</sec>
<?pagebreak page3150?><sec id="App1.Ch1.S1.SS1.SSS2">
  <label>A1.2</label><title>Direct impact of the hazard event – special situation due to a traffic jam</title>
      <p id="d1e4529"><disp-formula id="App1.Ch1.S1.E4" content-type="numbered"><label>A2</label><mml:math id="M211" display="block"><mml:mtable columnspacing="1em" class="split" rowspacing="0.2ex" displaystyle="true" columnalign="right left"><mml:mtr><mml:mtd><mml:mrow><mml:msub><mml:mi>r</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">DI</mml:mi><mml:mo>)</mml:mo><mml:mi mathvariant="normal">SS</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:mtd><mml:mtd><mml:mrow><mml:mo>=</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mi>j</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:mfenced close=")" open="("><mml:mrow><mml:mn mathvariant="normal">1</mml:mn><mml:mo>-</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">Rb</mml:mi></mml:msub></mml:mrow></mml:mfenced><mml:mo>×</mml:mo><mml:mfenced open="(" close=")"><mml:mrow><mml:mn mathvariant="normal">1</mml:mn><mml:mo>-</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">RbE</mml:mi></mml:msub></mml:mrow></mml:mfenced><mml:mo>×</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:mtd></mml:mtr><mml:mtr><mml:mtd/><mml:mtd><mml:mrow><mml:mo>×</mml:mo><mml:mi mathvariant="italic">λ</mml:mi><mml:mo>×</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mrow><mml:mi mathvariant="normal">So</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub><mml:mo>×</mml:mo><mml:msub><mml:mi>f</mml:mi><mml:mi mathvariant="normal">L</mml:mi></mml:msub></mml:mrow></mml:mtd></mml:mtr></mml:mtable></mml:math></disp-formula></p>

<?xmltex \floatpos{h!}?><table-wrap id="App1.Ch1.S1.T5"><?xmltex \hack{\hsize\textwidth}?><?xmltex \currentcnt{A2}?><label>Table A2</label><caption><p id="d1e4635">Risk of persons in scenario <inline-formula><mml:math id="M212" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula> for the calculation of <inline-formula><mml:math id="M213" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>: direct impact – traffic jam. The calculation of the variables is according to Table A1.</p></caption><oasis:table frame="topbot"><oasis:tgroup cols="2">
     <oasis:colspec colnum="1" colname="col1" align="left"/>
     <oasis:colspec colnum="2" colname="col2" align="center"/>
     <oasis:thead>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1">Variable</oasis:entry>
         <oasis:entry colname="col2">Description</oasis:entry>
       </oasis:row>
     </oasis:thead>
     <oasis:tbody>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M214" display="inline"><mml:mrow><mml:msub><mml:mi>r</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">DI</mml:mi><mml:mo>)</mml:mo><mml:mi mathvariant="normal">SS</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Risk of persons in scenario <inline-formula><mml:math id="M215" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula> in the case of a traffic jam (special situation)</oasis:entry>
       </oasis:row>
     </oasis:tbody>
   </oasis:tgroup></oasis:table></table-wrap>

<?xmltex \hack{\clearpage}?>
</sec>
<?pagebreak page3151?><sec id="App1.Ch1.S1.SS1.SSS3">
  <label>A1.3</label><title>Indirect effect – rear-end collision</title>
      <p id="d1e4726"><disp-formula id="App1.Ch1.S1.E5" content-type="numbered"><label>A3</label><mml:math id="M216" display="block"><mml:mtable rowspacing="0.2ex" class="split" columnspacing="1em" displaystyle="true" columnalign="right left"><mml:mtr><mml:mtd><mml:mrow><mml:msub><mml:mi>r</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">RC</mml:mi><mml:mo>)</mml:mo><mml:mi mathvariant="normal">NS</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:mtd><mml:mtd><mml:mrow><mml:mo>=</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mi>j</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:mfenced close=")" open="("><mml:mrow><mml:mn mathvariant="normal">1</mml:mn><mml:mo>-</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">Rb</mml:mi></mml:msub></mml:mrow></mml:mfenced><mml:mo>×</mml:mo><mml:mfenced open="(" close=")"><mml:mrow><mml:mn mathvariant="normal">1</mml:mn><mml:mo>-</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">RbE</mml:mi></mml:msub></mml:mrow></mml:mfenced><mml:mo>×</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">Rc</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:msub><mml:mi>f</mml:mi><mml:mi mathvariant="normal">L</mml:mi></mml:msub></mml:mrow></mml:mtd></mml:mtr><mml:mtr><mml:mtd/><mml:mtd><mml:mrow><mml:mo>×</mml:mo><mml:mfenced close=")" open="("><mml:mrow><mml:mn mathvariant="normal">1</mml:mn><mml:mo>-</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:mfenced><mml:mo>×</mml:mo><mml:msub><mml:mi>N</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:msub><mml:mi mathvariant="italic">λ</mml:mi><mml:mi mathvariant="normal">Rc</mml:mi></mml:msub></mml:mrow></mml:mtd></mml:mtr></mml:mtable></mml:math></disp-formula></p>

<?xmltex \floatpos{h!}?><table-wrap id="App1.Ch1.S1.T6"><?xmltex \hack{\hsize\textwidth}?><?xmltex \currentcnt{A3}?><label>Table A3</label><caption><p id="d1e4836">Risk variables and their description for the calculation of <inline-formula><mml:math id="M217" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>: rear-end collision. The calculation of the residual variables is according to Table A1. <inline-formula><mml:math id="M218" display="inline"><mml:msup><mml:mi/><mml:mo>*</mml:mo></mml:msup></mml:math></inline-formula> A rear-end collision is only
valid in the case of a standard situation (no traffic jam). The scenario is not
relevant for low-intensity hazard events with deposition heights <inline-formula><mml:math id="M219" display="inline"><mml:mo>&lt;</mml:mo></mml:math></inline-formula> 0.15 m.</p></caption><oasis:table frame="topbot"><oasis:tgroup cols="2">
     <oasis:colspec colnum="1" colname="col1" align="left"/>
     <oasis:colspec colnum="2" colname="col2" align="left"/>
     <oasis:thead>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1">Variable</oasis:entry>
         <oasis:entry colname="col2">Description</oasis:entry>
       </oasis:row>
     </oasis:thead>
     <oasis:tbody>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M220" display="inline"><mml:mrow><mml:msub><mml:mi>r</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">RC</mml:mi><mml:mo>)</mml:mo><mml:mi mathvariant="normal">NS</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Risk of persons in scenario <inline-formula><mml:math id="M221" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula> for a rear-end collision in the normal situation<inline-formula><mml:math id="M222" display="inline"><mml:msup><mml:mi/><mml:mo>*</mml:mo></mml:msup></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M223" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">Rc</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Probability of rear-end collision</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M224" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">λ</mml:mi><mml:mi mathvariant="normal">Rc</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Probability of fatality in the case of a rear-end collision</oasis:entry>
       </oasis:row>
     </oasis:tbody>
   </oasis:tgroup></oasis:table></table-wrap>

<?xmltex \hack{\clearpage}?>
</sec>
</sec>
<?pagebreak page3152?><sec id="App1.Ch1.S1.SS2">
  <label>A2</label><?xmltex \opttitle{Property risk~$R_{\mathrm{A}}$}?><title>Property risk <inline-formula><mml:math id="M225" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></title>
      <p id="d1e4992"><disp-formula id="App1.Ch1.S1.E6" content-type="numbered"><label>A4</label><mml:math id="M226" display="block"><mml:mrow><mml:msub><mml:mi>r</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">DI</mml:mi><mml:mo>)</mml:mo><mml:mi>i</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub><mml:mo>=</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mi>j</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:mi>l</mml:mi><mml:mo>×</mml:mo><mml:msub><mml:mi>A</mml:mi><mml:mi>i</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:msub><mml:mi>v</mml:mi><mml:mrow><mml:mi>i</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub><mml:mo>×</mml:mo><mml:msub><mml:mi>p</mml:mi><mml:mrow><mml:mi mathvariant="normal">So</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub><mml:mo>×</mml:mo><mml:msub><mml:mi>f</mml:mi><mml:mi mathvariant="normal">L</mml:mi></mml:msub></mml:mrow></mml:math></disp-formula></p>

<?xmltex \floatpos{h!}?><table-wrap id="App1.Ch1.S1.T7"><?xmltex \hack{\hsize\textwidth}?><?xmltex \currentcnt{A4}?><label>Table A4</label><caption><p id="d1e5069">Risk variables and their description for the calculation of <inline-formula><mml:math id="M227" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>: direct impact. The calculation of the residual variables is according to Table A1.</p></caption><oasis:table frame="topbot"><oasis:tgroup cols="2">
     <oasis:colspec colnum="1" colname="col1" align="left"/>
     <oasis:colspec colnum="2" colname="col2" align="left"/>
     <oasis:thead>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1">Variable</oasis:entry>
         <oasis:entry colname="col2">Description</oasis:entry>
       </oasis:row>
     </oasis:thead>
     <oasis:tbody>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M228" display="inline"><mml:mrow><mml:msub><mml:mi>r</mml:mi><mml:mrow><mml:mo>(</mml:mo><mml:mi mathvariant="normal">DI</mml:mi><mml:mo>)</mml:mo><mml:mi>i</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Risk of object <inline-formula><mml:math id="M229" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula> in scenario <inline-formula><mml:math id="M230" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula> in terms of a direct impact of the hazard</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M231" display="inline"><mml:mrow><mml:msub><mml:mi>A</mml:mi><mml:mi>i</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Asset value of object <inline-formula><mml:math id="M232" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M233" display="inline"><mml:mrow><mml:msub><mml:mi>v</mml:mi><mml:mrow><mml:mi>i</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Hazard-specific vulnerability of object <inline-formula><mml:math id="M234" display="inline"><mml:mi>i</mml:mi></mml:math></inline-formula> in scenario <inline-formula><mml:math id="M235" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula> (in Table A8)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M236" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Length of the affected road segment</oasis:entry>
       </oasis:row>
     </oasis:tbody>
   </oasis:tgroup></oasis:table></table-wrap>

<?xmltex \hack{\clearpage}?>
</sec>
<?pagebreak page3153?><sec id="App1.Ch1.S1.SS3">
  <label>A3</label><?xmltex \opttitle{Risk due to non-operational availability~$R_{\mathrm{D}}$}?><title>Risk due to non-operational availability <inline-formula><mml:math id="M237" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></title>
      <p id="d1e5246"><disp-formula id="App1.Ch1.S1.E7" content-type="numbered"><label>A5</label><mml:math id="M238" display="block"><mml:mrow><mml:msub><mml:mi>r</mml:mi><mml:mrow><mml:mi mathvariant="normal">Rb</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub><mml:mo>=</mml:mo><mml:mfenced close=")" open="("><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi>j</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:msub><mml:mi>f</mml:mi><mml:mi mathvariant="normal">Rb</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:mstyle displaystyle="true"><mml:mfrac style="display"><mml:mn mathvariant="normal">1</mml:mn><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mi mathvariant="normal">H</mml:mi></mml:msub></mml:mrow></mml:mfrac></mml:mstyle></mml:mrow></mml:mfenced><mml:mo>×</mml:mo><mml:msub><mml:mi>D</mml:mi><mml:mi mathvariant="normal">Rb</mml:mi></mml:msub><mml:mo>×</mml:mo><mml:msub><mml:mi>C</mml:mi><mml:mi mathvariant="normal">Rb</mml:mi></mml:msub></mml:mrow></mml:math></disp-formula></p>

<?xmltex \floatpos{h!}?><table-wrap id="App1.Ch1.S1.T8"><?xmltex \hack{\hsize\textwidth}?><?xmltex \currentcnt{A5}?><label>Table A5</label><caption><p id="d1e5309">Risk variables and their description for the calculation
of <inline-formula><mml:math id="M239" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>. The calculation of the residual variables is according to
Table A1.</p></caption><oasis:table frame="topbot"><oasis:tgroup cols="2">
     <oasis:colspec colnum="1" colname="col1" align="left"/>
     <oasis:colspec colnum="2" colname="col2" align="left"/>
     <oasis:thead>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1">Variable</oasis:entry>
         <oasis:entry colname="col2">Description</oasis:entry>
       </oasis:row>
     </oasis:thead>
     <oasis:tbody>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M240" display="inline"><mml:mrow><mml:msub><mml:mi>r</mml:mi><mml:mrow><mml:mi mathvariant="normal">Rb</mml:mi><mml:mo>,</mml:mo><mml:mi>j</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Risk of a roadblock in scenario <inline-formula><mml:math id="M241" display="inline"><mml:mi>j</mml:mi></mml:math></inline-formula></oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M242" display="inline"><mml:mrow><mml:msub><mml:mi>f</mml:mi><mml:mi mathvariant="normal">Rb</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Frequency of road blockage</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M243" display="inline"><mml:mrow><mml:msub><mml:mi>D</mml:mi><mml:mi mathvariant="normal">Rb</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Duration of road blockage depending on the hazard type in days (d)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M244" display="inline"><mml:mrow><mml:msub><mml:mi>C</mml:mi><mml:mi mathvariant="normal">Rb</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Costs of a road blockage in EUR</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M245" display="inline"><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mi mathvariant="normal">H</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Number of hazard areas which are responsible for road closure</oasis:entry>
       </oasis:row>
     </oasis:tbody>
   </oasis:tgroup></oasis:table></table-wrap>

<?xmltex \hack{\clearpage}?>
<?pagebreak page3154?><sec id="App1.Ch1.S1.SS3.SSSx1" specific-use="unnumbered">
  <title>Risk variables</title>
</sec>
</sec>
<sec id="App1.Ch1.S1.SS4">
  <label>A4</label><title>Probability of loss – exposure</title>

<?xmltex \floatpos{h!}?><table-wrap id="App1.Ch1.S1.T9"><?xmltex \hack{\hsize\textwidth}?><?xmltex \currentcnt{A6}?><label>Table A6</label><caption><p id="d1e5469">Bandwidth (credible intervals with <inline-formula><mml:math id="M246" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula> – lower bound, <inline-formula><mml:math id="M247" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula> –
most likely value and <inline-formula><mml:math id="M248" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula> – upper bound) of the variables within the
probabilistic risk analysis for calculating exposure situations. Units: h for hours, <inline-formula><mml:math id="M249" display="inline"><mml:mi>n</mml:mi></mml:math></inline-formula> for numbers and yr for years. ASFINAG: Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft; in consultation with: icw. <inline-formula><mml:math id="M250" display="inline"><mml:msup><mml:mi/><mml:mo>*</mml:mo></mml:msup></mml:math></inline-formula> Event types 1, 5 and 10 equate to single-stone, multiple-stone and small-scale rockslide, respectively.</p></caption><oasis:table frame="topbot"><oasis:tgroup cols="8">
     <oasis:colspec colnum="1" colname="col1" align="left"/>
     <oasis:colspec colnum="2" colname="col2" align="left"/>
     <oasis:colspec colnum="3" colname="col3" align="left"/>
     <oasis:colspec colnum="4" colname="col4" align="left"/>
     <oasis:colspec colnum="5" colname="col5" align="right"/>
     <oasis:colspec colnum="6" colname="col6" align="right"/>
     <oasis:colspec colnum="7" colname="col7" align="right"/>
     <oasis:colspec colnum="8" colname="col8" align="left"/>
     <oasis:thead>
       <oasis:row>
         <oasis:entry colname="col1">Variable</oasis:entry>
         <oasis:entry colname="col2">Description</oasis:entry>
         <oasis:entry colname="col3">Specification</oasis:entry>
         <oasis:entry colname="col4">Unit</oasis:entry>
         <oasis:entry colname="col5"><inline-formula><mml:math id="M251" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula> –</oasis:entry>
         <oasis:entry colname="col6"><inline-formula><mml:math id="M252" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula> –</oasis:entry>
         <oasis:entry colname="col7"><inline-formula><mml:math id="M253" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula> –</oasis:entry>
         <oasis:entry colname="col8">Source</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">lower</oasis:entry>
         <oasis:entry colname="col6">most likely</oasis:entry>
         <oasis:entry colname="col7">upper</oasis:entry>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">bound</oasis:entry>
         <oasis:entry colname="col6">value</oasis:entry>
         <oasis:entry colname="col7">bound</oasis:entry>
         <oasis:entry colname="col8"/>
       </oasis:row>
     </oasis:thead>
     <oasis:tbody>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M254" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">Rb</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Probability of</oasis:entry>
         <oasis:entry colname="col3">Not probable</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0</oasis:entry>
         <oasis:entry colname="col7">0</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M255" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012); <inline-formula><mml:math id="M256" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M257" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">a roadblock</oasis:entry>
         <oasis:entry colname="col3">Unlikely</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.05</oasis:entry>
         <oasis:entry colname="col6">0.1</oasis:entry>
         <oasis:entry colname="col7">0.5</oasis:entry>
         <oasis:entry colname="col8">estimates considering</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3">Probable</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.1</oasis:entry>
         <oasis:entry colname="col6">0.5</oasis:entry>
         <oasis:entry colname="col7">0.9</oasis:entry>
         <oasis:entry colname="col8">ASTRA class limits</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3">Most likely</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.5</oasis:entry>
         <oasis:entry colname="col6">0.9</oasis:entry>
         <oasis:entry colname="col7">0.95</oasis:entry>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M258" display="inline"><mml:mi mathvariant="italic">α</mml:mi></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Reduction</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0.5</oasis:entry>
         <oasis:entry colname="col6">0.75</oasis:entry>
         <oasis:entry colname="col7">1</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M259" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012); <inline-formula><mml:math id="M260" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M261" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">factor for</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">expert judgements</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"><inline-formula><mml:math id="M262" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">RbE</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M263" display="inline"><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mrow><mml:mi mathvariant="normal">B</mml:mi><mml:mn mathvariant="normal">99</mml:mn></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Number of</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4"><inline-formula><mml:math id="M264" display="inline"><mml:mi>n</mml:mi></mml:math></inline-formula> yr<inline-formula><mml:math id="M265" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">1</oasis:entry>
         <oasis:entry colname="col7">2</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M266" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M267" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M268" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: expert judgements</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">traffic jams</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">icw. surveyor of highways</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">per year</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">(federal state of Salzburg)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M269" display="inline"><mml:mi>D</mml:mi></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Duration of a</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4">h</oasis:entry>
         <oasis:entry colname="col5">0.083</oasis:entry>
         <oasis:entry colname="col6">0.5</oasis:entry>
         <oasis:entry colname="col7">2.0</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M270" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M271" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M272" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: expert judgements</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">traffic jam</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">icw. surveyor of highways</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">(federal state of Salzburg)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M273" display="inline"><mml:mrow><mml:msub><mml:mi>f</mml:mi><mml:mrow><mml:mi mathvariant="normal">A</mml:mi><mml:mn mathvariant="normal">10</mml:mn></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Frequency of</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4"><inline-formula><mml:math id="M274" display="inline"><mml:mi>n</mml:mi></mml:math></inline-formula> yr<inline-formula><mml:math id="M275" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col5">5</oasis:entry>
         <oasis:entry colname="col6">22</oasis:entry>
         <oasis:entry colname="col7">30</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M276" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M277" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M278" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: statistical</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">occurrence</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">evaluation traffic jam</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">of a special</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">database ASFINAG for the</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">situation A10</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">year 2015 (min, mean and</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">max value)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M279" display="inline"><mml:mrow><mml:msub><mml:mi>D</mml:mi><mml:mrow><mml:mi mathvariant="normal">A</mml:mi><mml:mn mathvariant="normal">10</mml:mn></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Duration of a</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4">h</oasis:entry>
         <oasis:entry colname="col5">0.5</oasis:entry>
         <oasis:entry colname="col6">2.65</oasis:entry>
         <oasis:entry colname="col7">5.0</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M280" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M281" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M282" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: statistical</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">special</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">evaluation traffic jam</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">situation A10</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">database ASFINAG for the</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">year 2015 (min, mean</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">and max value)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M283" display="inline"><mml:mrow><mml:msub><mml:mi>n</mml:mi><mml:mi mathvariant="normal">SS</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Number of</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4"><inline-formula><mml:math id="M284" display="inline"><mml:mi>n</mml:mi></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">4</oasis:entry>
         <oasis:entry colname="col7">11</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M285" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M286" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M287" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: statistical</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">traffic jams in</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">evaluation of traffic jam</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">special</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">database ASFINAG for the</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">case of a</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">year 2015 with traffic jam</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">situation A10</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">events <inline-formula><mml:math id="M288" display="inline"><mml:mo>&gt;</mml:mo></mml:math></inline-formula> 0.5 h</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M289" display="inline"><mml:mrow><mml:msub><mml:mi>D</mml:mi><mml:mrow><mml:mi mathvariant="normal">A</mml:mi><mml:mn mathvariant="normal">10</mml:mn></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Duration of a</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4">h</oasis:entry>
         <oasis:entry colname="col5">0.083</oasis:entry>
         <oasis:entry colname="col6">1</oasis:entry>
         <oasis:entry colname="col7">2</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M290" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M291" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M292" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: statistical</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">traffic jam</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">evaluation of traffic jam</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">special</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">database ASFINAG for the</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">situation A10</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">year 2015</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M293" display="inline"><mml:mrow><mml:msub><mml:mi>p</mml:mi><mml:mi mathvariant="normal">Rc</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Probability of</oasis:entry>
         <oasis:entry colname="col3">Improbable</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.05</oasis:entry>
         <oasis:entry colname="col7">0.15</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M294" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012); <inline-formula><mml:math id="M295" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M296" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">a rear-end</oasis:entry>
         <oasis:entry colname="col3">Probable</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.05</oasis:entry>
         <oasis:entry colname="col6">0.15</oasis:entry>
         <oasis:entry colname="col7">0.25</oasis:entry>
         <oasis:entry colname="col8">estimates considering</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">collision</oasis:entry>
         <oasis:entry colname="col3">Frequent</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.15</oasis:entry>
         <oasis:entry colname="col6">0.25</oasis:entry>
         <oasis:entry colname="col7">0.35</oasis:entry>
         <oasis:entry colname="col8">ASTRA class limits</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1">ET</oasis:entry>
         <oasis:entry colname="col2">Event type of</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">1</oasis:entry>
         <oasis:entry colname="col6">5</oasis:entry>
         <oasis:entry colname="col7">5</oasis:entry>
         <oasis:entry colname="col8">ASTRA (2012) icw.</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">rockfall<inline-formula><mml:math id="M297" display="inline"><mml:msup><mml:mi/><mml:mo>*</mml:mo></mml:msup></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">geological expert</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">judgement</oasis:entry>
       </oasis:row>
     </oasis:tbody>
   </oasis:tgroup></oasis:table></table-wrap>

<?xmltex \hack{\clearpage}?>
</sec>
<?pagebreak page3155?><sec id="App1.Ch1.S1.SS5">
  <label>A5</label><?xmltex \opttitle{Degree of damage -- risk for persons~$R_{\mathrm{P}}$}?><title>Degree of damage – risk for persons <inline-formula><mml:math id="M298" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></title>

<?xmltex \floatpos{h!}?><table-wrap id="App1.Ch1.S1.T10"><?xmltex \hack{\hsize\textwidth}?><?xmltex \currentcnt{A7}?><label>Table A7</label><caption><p id="d1e6896">Bandwidth (credible intervals with <inline-formula><mml:math id="M299" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula> – lower bound, <inline-formula><mml:math id="M300" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula> – most
likely value and <inline-formula><mml:math id="M301" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula> – upper bound) of the variables within the probabilistic risk analysis for calculating <inline-formula><mml:math id="M302" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>. Units: h for hours and <inline-formula><mml:math id="M303" display="inline"><mml:mi>n</mml:mi></mml:math></inline-formula> for numbers. <inline-formula><mml:math id="M304" display="inline"><mml:msup><mml:mi/><mml:mo>*</mml:mo></mml:msup></mml:math></inline-formula> The monetary value of a person was used as single (point) value, as this value is recommended by the Austrian government.</p></caption><oasis:table frame="topbot"><?xmltex \begin{scaleboxenv}{.91}[.91]?><oasis:tgroup cols="8">
     <oasis:colspec colnum="1" colname="col1" align="left"/>
     <oasis:colspec colnum="2" colname="col2" align="left"/>
     <oasis:colspec colnum="3" colname="col3" align="left"/>
     <oasis:colspec colnum="4" colname="col4" align="left"/>
     <oasis:colspec colnum="5" colname="col5" align="right"/>
     <oasis:colspec colnum="6" colname="col6" align="right"/>
     <oasis:colspec colnum="7" colname="col7" align="right"/>
     <oasis:colspec colnum="8" colname="col8" align="left"/>
     <oasis:thead>
       <oasis:row>
         <oasis:entry colname="col1">Variable</oasis:entry>
         <oasis:entry colname="col2">Description</oasis:entry>
         <oasis:entry colname="col3">Specification</oasis:entry>
         <oasis:entry colname="col4">Unit</oasis:entry>
         <oasis:entry colname="col5"><inline-formula><mml:math id="M305" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula> –</oasis:entry>
         <oasis:entry colname="col6"><inline-formula><mml:math id="M306" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula> –</oasis:entry>
         <oasis:entry colname="col7"><inline-formula><mml:math id="M307" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula> –</oasis:entry>
         <oasis:entry colname="col8">Source</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">lower</oasis:entry>
         <oasis:entry colname="col6">most likely</oasis:entry>
         <oasis:entry colname="col7">upper</oasis:entry>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">bound</oasis:entry>
         <oasis:entry colname="col6">value</oasis:entry>
         <oasis:entry colname="col7">bound</oasis:entry>
         <oasis:entry colname="col8"/>
       </oasis:row>
     </oasis:thead>
     <oasis:tbody>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M308" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">λ</mml:mi><mml:mi mathvariant="normal">Rc</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Probability of</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.0066</oasis:entry>
         <oasis:entry colname="col7">0.05</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M309" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012); <inline-formula><mml:math id="M310" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M311" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">fatality in the</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">expert judgements icw.</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">case of a rear-</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">surveyor of highways</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">end collision</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">(federal state of Salzburg)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M312" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">λ</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Lethality for</oasis:entry>
         <oasis:entry colname="col3">Low intensity</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0</oasis:entry>
         <oasis:entry colname="col7">0</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M313" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012) and</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">debris flow</oasis:entry>
         <oasis:entry colname="col3">Medium intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.5005</oasis:entry>
         <oasis:entry colname="col7">0.7995</oasis:entry>
         <oasis:entry colname="col8">BAFU (2013); <inline-formula><mml:math id="M314" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M315" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3">Strong intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.5005</oasis:entry>
         <oasis:entry colname="col6">0.7995</oasis:entry>
         <oasis:entry colname="col7">1</oasis:entry>
         <oasis:entry colname="col8">Estimates considering class</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">limits</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M316" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">λ</mml:mi><mml:mi mathvariant="normal">F</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Lethality for</oasis:entry>
         <oasis:entry colname="col3">Low intensity</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0</oasis:entry>
         <oasis:entry colname="col7">0</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M317" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012) and</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">dynamic</oasis:entry>
         <oasis:entry colname="col3">Medium intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.0025</oasis:entry>
         <oasis:entry colname="col7">0.108</oasis:entry>
         <oasis:entry colname="col8">BAFU (2013); <inline-formula><mml:math id="M318" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M319" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">flooding</oasis:entry>
         <oasis:entry colname="col3">Strong intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.025</oasis:entry>
         <oasis:entry colname="col6">0.108</oasis:entry>
         <oasis:entry colname="col7">0.20</oasis:entry>
         <oasis:entry colname="col8">estimates considering class</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">limits</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M320" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">λ</mml:mi><mml:mi mathvariant="normal">R</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Lethality for</oasis:entry>
         <oasis:entry colname="col3">Low intensity</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.1</oasis:entry>
         <oasis:entry colname="col7">0.8</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M321" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012) and</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">rockfall</oasis:entry>
         <oasis:entry colname="col3">Medium intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.1</oasis:entry>
         <oasis:entry colname="col6">0.8</oasis:entry>
         <oasis:entry colname="col7">1</oasis:entry>
         <oasis:entry colname="col8">BAFU (2013) <inline-formula><mml:math id="M322" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M323" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3">Strong intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.8</oasis:entry>
         <oasis:entry colname="col6">1</oasis:entry>
         <oasis:entry colname="col7">1</oasis:entry>
         <oasis:entry colname="col8">estimates considering class</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">limits</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M324" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">λ</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Lethality for</oasis:entry>
         <oasis:entry colname="col3">Low intensity</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.00025</oasis:entry>
         <oasis:entry colname="col7">0.1</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M325" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012) and</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">avalanche</oasis:entry>
         <oasis:entry colname="col3">Medium intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.00025</oasis:entry>
         <oasis:entry colname="col6">0.1</oasis:entry>
         <oasis:entry colname="col7">0.2</oasis:entry>
         <oasis:entry colname="col8">BAFU (2013);</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3">Strong intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.1</oasis:entry>
         <oasis:entry colname="col6">0.2</oasis:entry>
         <oasis:entry colname="col7">1</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M326" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M327" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: estimates considering class</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">limits</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1">MDT<inline-formula><mml:math id="M328" display="inline"><mml:msub><mml:mi/><mml:mrow><mml:mi mathvariant="normal">B</mml:mi><mml:mn mathvariant="normal">99</mml:mn></mml:mrow></mml:msub></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Average daily</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4"><inline-formula><mml:math id="M329" display="inline"><mml:mi>n</mml:mi></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col5">3.000</oasis:entry>
         <oasis:entry colname="col6">3.600</oasis:entry>
         <oasis:entry colname="col7">7.000</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M330" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M331" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M332" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: traffic counting for</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">traffic B99</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">the year 2016 (min, mean</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">and max value) (federal state</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">of Salzburg)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1">MDT<inline-formula><mml:math id="M333" display="inline"><mml:msub><mml:mi/><mml:mrow><mml:mi mathvariant="normal">A</mml:mi><mml:mn mathvariant="normal">10</mml:mn></mml:mrow></mml:msub></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Average daily</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4"><inline-formula><mml:math id="M334" display="inline"><mml:mi>n</mml:mi></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col5">10.000</oasis:entry>
         <oasis:entry colname="col6">19.638</oasis:entry>
         <oasis:entry colname="col7">62.000</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M335" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M336" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M337" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: permanent</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">traffic A10</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">automatic traffic counting</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">ASFINAG for the year</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">2016 (min, mean and max</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">value)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M338" display="inline"><mml:mi>v</mml:mi></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Signalized</oasis:entry>
         <oasis:entry colname="col3">Free land zone</oasis:entry>
         <oasis:entry colname="col4">km h<inline-formula><mml:math id="M339" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col5">80</oasis:entry>
         <oasis:entry colname="col6">100</oasis:entry>
         <oasis:entry colname="col7">120</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M340" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: signalized travel speed;</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">velocity for</oasis:entry>
         <oasis:entry colname="col3">Municipality zone</oasis:entry>
         <oasis:entry colname="col4">km h<inline-formula><mml:math id="M341" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col5">45</oasis:entry>
         <oasis:entry colname="col6">50</oasis:entry>
         <oasis:entry colname="col7">60</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M342" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M343" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: expert judgements</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">cars</oasis:entry>
         <oasis:entry colname="col3">Acceleration, deceleration</oasis:entry>
         <oasis:entry colname="col4">km h<inline-formula><mml:math id="M344" display="inline"><mml:msup><mml:mi/><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:msup></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col5">70</oasis:entry>
         <oasis:entry colname="col6">80</oasis:entry>
         <oasis:entry colname="col7">110</oasis:entry>
         <oasis:entry colname="col8">icw. surveyor of highway</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">(federal state of Salzburg)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M345" display="inline"><mml:mrow><mml:msub><mml:mi mathvariant="italic">ρ</mml:mi><mml:mi mathvariant="normal">max</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Maximum</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4">n</oasis:entry>
         <oasis:entry colname="col5">120</oasis:entry>
         <oasis:entry colname="col6">140</oasis:entry>
         <oasis:entry colname="col7">145</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M346" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012); <inline-formula><mml:math id="M347" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M348" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">traffic density</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">expert judgements icw.</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">per lane and</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">surveyor of highway</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">kilometre in</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">(federal state of Salzburg)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">the case of a</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">traffic jam</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M349" display="inline"><mml:mi mathvariant="italic">β</mml:mi></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Mean degree</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4"><inline-formula><mml:math id="M350" display="inline"><mml:mi>n</mml:mi></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col5">1</oasis:entry>
         <oasis:entry colname="col6">1.76</oasis:entry>
         <oasis:entry colname="col7">5</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M351" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012); <inline-formula><mml:math id="M352" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M353" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">of passengers</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">estimates considering one</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">person (driver) and</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">five persons in a car</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M354" display="inline"><mml:mrow><mml:msub><mml:mi>C</mml:mi><mml:mi mathvariant="normal">P</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Value (cost)</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4">EUR</oasis:entry>
         <oasis:entry namest="col5" nameend="col7" align="center">3 016 194<inline-formula><mml:math id="M355" display="inline"><mml:msup><mml:mi/><mml:mo>*</mml:mo></mml:msup></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col8">BMVIT (2014) for the</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">of a person</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">period 2014–2016</oasis:entry>
       </oasis:row>
     </oasis:tbody>
   </oasis:tgroup><?xmltex \end{scaleboxenv}?></oasis:table></table-wrap>

<?xmltex \hack{\clearpage}?>
</sec>
<?pagebreak page3156?><sec id="App1.Ch1.S1.SS6">
  <label>A6</label><?xmltex \opttitle{Extent of damage -- risk for material assets $R_{\mathrm{A}}$}?><title>Extent of damage – risk for material assets <inline-formula><mml:math id="M356" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></title>

<?xmltex \floatpos{h!}?><table-wrap id="App1.Ch1.S1.T11"><?xmltex \hack{\hsize\textwidth}?><?xmltex \currentcnt{A8}?><label>Table A8</label><caption><p id="d1e8524">Bandwidth (credible intervals with <inline-formula><mml:math id="M357" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula> – lower bound, <inline-formula><mml:math id="M358" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula> – most
likely value and <inline-formula><mml:math id="M359" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula> – upper bound) of the variables within the probabilistic risk analysis for calculating <inline-formula><mml:math id="M360" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">A</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>. <inline-formula><mml:math id="M361" display="inline"><mml:msup><mml:mi/><mml:mo>*</mml:mo></mml:msup></mml:math></inline-formula> Base value according to the federal state of Salzburg: <inline-formula><mml:math id="M362" display="inline"><mml:mrow><mml:mi>l</mml:mi><mml:mo>=</mml:mo><mml:mo>-</mml:mo><mml:mn mathvariant="normal">20</mml:mn></mml:mrow></mml:math></inline-formula> %, <inline-formula><mml:math id="M363" display="inline"><mml:mrow><mml:mi>u</mml:mi><mml:mo>=</mml:mo><mml:mo>+</mml:mo><mml:mn mathvariant="normal">10</mml:mn></mml:mrow></mml:math></inline-formula> % (right-skewed distribution). DN: nominal diameter.</p></caption><oasis:table frame="topbot"><?xmltex \begin{scaleboxenv}{.89}[.89]?><oasis:tgroup cols="8">
     <oasis:colspec colnum="1" colname="col1" align="left"/>
     <oasis:colspec colnum="2" colname="col2" align="left"/>
     <oasis:colspec colnum="3" colname="col3" align="left"/>
     <oasis:colspec colnum="4" colname="col4" align="left"/>
     <oasis:colspec colnum="5" colname="col5" align="right"/>
     <oasis:colspec colnum="6" colname="col6" align="right"/>
     <oasis:colspec colnum="7" colname="col7" align="right"/>
     <oasis:colspec colnum="8" colname="col8" align="left"/>
     <oasis:thead>
       <oasis:row>
         <oasis:entry colname="col1">Variable</oasis:entry>
         <oasis:entry colname="col2">Description</oasis:entry>
         <oasis:entry colname="col3">Specification</oasis:entry>
         <oasis:entry colname="col4">Unit</oasis:entry>
         <oasis:entry colname="col5"><inline-formula><mml:math id="M364" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula> –</oasis:entry>
         <oasis:entry colname="col6"><inline-formula><mml:math id="M365" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula> –</oasis:entry>
         <oasis:entry colname="col7"><inline-formula><mml:math id="M366" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula> –</oasis:entry>
         <oasis:entry colname="col8">Source</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">lower</oasis:entry>
         <oasis:entry colname="col6">most likely</oasis:entry>
         <oasis:entry colname="col7">upper</oasis:entry>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">bound</oasis:entry>
         <oasis:entry colname="col6">value</oasis:entry>
         <oasis:entry colname="col7">bound</oasis:entry>
         <oasis:entry colname="col8"/>
       </oasis:row>
     </oasis:thead>
     <oasis:tbody>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M367" display="inline"><mml:mrow><mml:msub><mml:mi>A</mml:mi><mml:mi mathvariant="normal">R</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Asset value –</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4">EUR per metre</oasis:entry>
         <oasis:entry colname="col5">800</oasis:entry>
         <oasis:entry colname="col6">850</oasis:entry>
         <oasis:entry colname="col7">1000</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M368" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M369" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M370" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: statistical data</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">construction</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">from federal state of</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">costs road</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">Salzburg (min, mean and max</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">value)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M371" display="inline"><mml:mrow><mml:msub><mml:mi>A</mml:mi><mml:mi mathvariant="normal">B</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Asset value –</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4">EUR per square metre</oasis:entry>
         <oasis:entry colname="col5">1350</oasis:entry>
         <oasis:entry colname="col6">2200</oasis:entry>
         <oasis:entry colname="col7">2400</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M372" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M373" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M374" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: statistical data</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">construction</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">from federal state of</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">costs bridges</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">Salzburg (min, mean and max</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">(span width</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">value)</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">8–10 m)</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M375" display="inline"><mml:mrow><mml:msub><mml:mi>A</mml:mi><mml:mi mathvariant="normal">C</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Asset value –</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4">EUR (in thousands)</oasis:entry>
         <oasis:entry colname="col5">52</oasis:entry>
         <oasis:entry colname="col6">65</oasis:entry>
         <oasis:entry colname="col7">71.5<inline-formula><mml:math id="M376" display="inline"><mml:msup><mml:mi/><mml:mo>*</mml:mo></mml:msup></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M377" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: statistical data from</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">construction</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">federal state of Salzburg</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">costs pipe</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M378" display="inline"><mml:mrow><mml:mi>l</mml:mi><mml:mo>=</mml:mo><mml:mo>-</mml:mo><mml:mn mathvariant="normal">20</mml:mn></mml:mrow></mml:math></inline-formula> %; <inline-formula><mml:math id="M379" display="inline"><mml:mrow><mml:mi>u</mml:mi><mml:mo>=</mml:mo><mml:mo>+</mml:mo><mml:mn mathvariant="normal">10</mml:mn></mml:mrow></mml:math></inline-formula> %</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">culverts</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">(right-skewed distribution)</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">DN 500–1200</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M380" display="inline"><mml:mrow><mml:msub><mml:mi>v</mml:mi><mml:mrow><mml:mi mathvariant="normal">R</mml:mi><mml:mo>,</mml:mo><mml:mi mathvariant="normal">F</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Vulnerability</oasis:entry>
         <oasis:entry colname="col3">Low intensity</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.05</oasis:entry>
         <oasis:entry colname="col7">0.1</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M381" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012) and</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">road dynamic</oasis:entry>
         <oasis:entry colname="col3">Medium intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.05</oasis:entry>
         <oasis:entry colname="col6">0.1</oasis:entry>
         <oasis:entry colname="col7">0.45</oasis:entry>
         <oasis:entry colname="col8">BAFU (2013); <inline-formula><mml:math id="M382" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M383" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">flooding</oasis:entry>
         <oasis:entry colname="col3">Strong intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.1</oasis:entry>
         <oasis:entry colname="col6">0.45</oasis:entry>
         <oasis:entry colname="col7">0.80</oasis:entry>
         <oasis:entry colname="col8">estimates considering class</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">limits</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M384" display="inline"><mml:mrow><mml:msub><mml:mi>v</mml:mi><mml:mrow><mml:mi mathvariant="normal">B</mml:mi><mml:mo>,</mml:mo><mml:mi mathvariant="normal">F</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Vulnerability</oasis:entry>
         <oasis:entry colname="col3">Low intensity</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.025</oasis:entry>
         <oasis:entry colname="col7">0.05</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M385" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012) and</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">structures</oasis:entry>
         <oasis:entry colname="col3">Medium intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.025</oasis:entry>
         <oasis:entry colname="col6">0.05</oasis:entry>
         <oasis:entry colname="col7">0.65</oasis:entry>
         <oasis:entry colname="col8">BAFU (2013); <inline-formula><mml:math id="M386" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M387" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">(bridges)</oasis:entry>
         <oasis:entry colname="col3">Strong intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.05</oasis:entry>
         <oasis:entry colname="col6">0.65</oasis:entry>
         <oasis:entry colname="col7">1</oasis:entry>
         <oasis:entry colname="col8">estimates considering class</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">dynamic</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">limits</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M388" display="inline"><mml:mrow><mml:msub><mml:mi>v</mml:mi><mml:mrow><mml:mi mathvariant="normal">R</mml:mi><mml:mo>,</mml:mo><mml:mi mathvariant="normal">D</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Vulnerability</oasis:entry>
         <oasis:entry colname="col3">Low intensity</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.05</oasis:entry>
         <oasis:entry colname="col7">0.35</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M389" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012) and</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">road debris</oasis:entry>
         <oasis:entry colname="col3">Medium intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.05</oasis:entry>
         <oasis:entry colname="col6">0.35</oasis:entry>
         <oasis:entry colname="col7">0.65</oasis:entry>
         <oasis:entry colname="col8">BAFU (2013); <inline-formula><mml:math id="M390" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M391" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">flow</oasis:entry>
         <oasis:entry colname="col3">Strong intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.35</oasis:entry>
         <oasis:entry colname="col6">0.65</oasis:entry>
         <oasis:entry colname="col7">1</oasis:entry>
         <oasis:entry colname="col8">estimates considering class</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">limits</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M392" display="inline"><mml:mrow><mml:msub><mml:mi>v</mml:mi><mml:mrow><mml:mi mathvariant="normal">B</mml:mi><mml:mo>,</mml:mo><mml:mi mathvariant="normal">D</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Vulnerability</oasis:entry>
         <oasis:entry colname="col3">Low intensity</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.025</oasis:entry>
         <oasis:entry colname="col7">0.25</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M393" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012) and</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">structures</oasis:entry>
         <oasis:entry colname="col3">Medium intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.025</oasis:entry>
         <oasis:entry colname="col6">0.25</oasis:entry>
         <oasis:entry colname="col7">0.95</oasis:entry>
         <oasis:entry colname="col8">BAFU (2013); <inline-formula><mml:math id="M394" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M395" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">(bridges,</oasis:entry>
         <oasis:entry colname="col3">Strong intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.25</oasis:entry>
         <oasis:entry colname="col6">0.95</oasis:entry>
         <oasis:entry colname="col7">1</oasis:entry>
         <oasis:entry colname="col8">estimates considering class</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">culvert) debris</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">limits</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">flow</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M396" display="inline"><mml:mrow><mml:msub><mml:mi>v</mml:mi><mml:mrow><mml:mi mathvariant="normal">R</mml:mi><mml:mo>,</mml:mo><mml:mi mathvariant="normal">A</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Vulnerability</oasis:entry>
         <oasis:entry colname="col3">Low intensity</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.005</oasis:entry>
         <oasis:entry colname="col7">0.1</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M397" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012) and</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">road</oasis:entry>
         <oasis:entry colname="col3">Medium intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.005</oasis:entry>
         <oasis:entry colname="col6">0.1</oasis:entry>
         <oasis:entry colname="col7">0.2</oasis:entry>
         <oasis:entry colname="col8">BAFU (2013); <inline-formula><mml:math id="M398" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M399" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">avalanche</oasis:entry>
         <oasis:entry colname="col3">Strong intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.1</oasis:entry>
         <oasis:entry colname="col6">0.2</oasis:entry>
         <oasis:entry colname="col7">0.30</oasis:entry>
         <oasis:entry colname="col8">estimates considering class</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">limits</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M400" display="inline"><mml:mrow><mml:msub><mml:mi>v</mml:mi><mml:mrow><mml:mi mathvariant="normal">B</mml:mi><mml:mo>,</mml:mo><mml:mi mathvariant="normal">A</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Vulnerability</oasis:entry>
         <oasis:entry colname="col3">Low intensity</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.005</oasis:entry>
         <oasis:entry colname="col7">0.7</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M401" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012) and</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">structures</oasis:entry>
         <oasis:entry colname="col3">Medium intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.005</oasis:entry>
         <oasis:entry colname="col6">0.7</oasis:entry>
         <oasis:entry colname="col7">1</oasis:entry>
         <oasis:entry colname="col8">BAFU (2013); <inline-formula><mml:math id="M402" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M403" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">(bridges,</oasis:entry>
         <oasis:entry colname="col3">Strong intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.7</oasis:entry>
         <oasis:entry colname="col6">1</oasis:entry>
         <oasis:entry colname="col7">1</oasis:entry>
         <oasis:entry colname="col8">estimates considering class</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">culvert)</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">limits</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">avalanche</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M404" display="inline"><mml:mrow><mml:msub><mml:mi>v</mml:mi><mml:mrow><mml:mi mathvariant="normal">R</mml:mi><mml:mo>,</mml:mo><mml:mi mathvariant="normal">R</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Vulnerability</oasis:entry>
         <oasis:entry colname="col3">Low intensity</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.1</oasis:entry>
         <oasis:entry colname="col7">0.5</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M405" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012) and</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">road</oasis:entry>
         <oasis:entry colname="col3">Medium intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.1</oasis:entry>
         <oasis:entry colname="col6">0.5</oasis:entry>
         <oasis:entry colname="col7">1</oasis:entry>
         <oasis:entry colname="col8">BAFU (2013) <inline-formula><mml:math id="M406" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M407" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">rockfall</oasis:entry>
         <oasis:entry colname="col3">Strong intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.5</oasis:entry>
         <oasis:entry colname="col6">1</oasis:entry>
         <oasis:entry colname="col7">1</oasis:entry>
         <oasis:entry colname="col8">estimates considering class</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">limits</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M408" display="inline"><mml:mrow><mml:msub><mml:mi>v</mml:mi><mml:mrow><mml:mi mathvariant="normal">B</mml:mi><mml:mo>,</mml:mo><mml:mi mathvariant="normal">R</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Vulnerability</oasis:entry>
         <oasis:entry colname="col3">Low intensity</oasis:entry>
         <oasis:entry colname="col4">–</oasis:entry>
         <oasis:entry colname="col5">0</oasis:entry>
         <oasis:entry colname="col6">0.1</oasis:entry>
         <oasis:entry colname="col7">0.5</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M409" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: ASTRA (2012) and</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">structures</oasis:entry>
         <oasis:entry colname="col3">Medium intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.1</oasis:entry>
         <oasis:entry colname="col6">0.5</oasis:entry>
         <oasis:entry colname="col7">1</oasis:entry>
         <oasis:entry colname="col8">BAFU (2013) <inline-formula><mml:math id="M410" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M411" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>:</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">(bridges,</oasis:entry>
         <oasis:entry colname="col3">Strong intensity</oasis:entry>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">0.5</oasis:entry>
         <oasis:entry colname="col6">1</oasis:entry>
         <oasis:entry colname="col7">1</oasis:entry>
         <oasis:entry colname="col8">estimates considering class</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">culvert)</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">limits</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">rockfall</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8"/>
       </oasis:row>
     </oasis:tbody>
   </oasis:tgroup><?xmltex \end{scaleboxenv}?></oasis:table></table-wrap>

<?xmltex \hack{\clearpage}?>
</sec>
<?pagebreak page3157?><sec id="App1.Ch1.S1.SS7">
  <label>A7</label><?xmltex \opttitle{Degree of damage -- risk for operational availability $R_{\mathrm{D}}$}?><title>Degree of damage – risk for operational availability <inline-formula><mml:math id="M412" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></title>

<?xmltex \floatpos{h!}?><table-wrap id="App1.Ch1.S1.T12"><?xmltex \hack{\hsize\textwidth}?><?xmltex \currentcnt{A9}?><label>Table A9</label><caption><p id="d1e10328">Bandwidth (credible intervals with <inline-formula><mml:math id="M413" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula> –  lower bound, <inline-formula><mml:math id="M414" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula> – most
likely value and <inline-formula><mml:math id="M415" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula> – upper bound) of the variables within the probabilistic risk analysis for calculating <inline-formula><mml:math id="M416" display="inline"><mml:mrow><mml:msub><mml:mi>R</mml:mi><mml:mi mathvariant="normal">D</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula>. Units: d for days, <inline-formula><mml:math id="M417" display="inline"><mml:mi>n</mml:mi></mml:math></inline-formula> for numbers and yr for years.</p></caption><oasis:table frame="topbot"><oasis:tgroup cols="8">
     <oasis:colspec colnum="1" colname="col1" align="left"/>
     <oasis:colspec colnum="2" colname="col2" align="left"/>
     <oasis:colspec colnum="3" colname="col3" align="center"/>
     <oasis:colspec colnum="4" colname="col4" align="left"/>
     <oasis:colspec colnum="5" colname="col5" align="right"/>
     <oasis:colspec colnum="6" colname="col6" align="right"/>
     <oasis:colspec colnum="7" colname="col7" align="right"/>
     <oasis:colspec colnum="8" colname="col8" align="left"/>
     <oasis:thead>
       <oasis:row>
         <oasis:entry colname="col1">Variable</oasis:entry>
         <oasis:entry colname="col2">Description</oasis:entry>
         <oasis:entry colname="col3">Specification</oasis:entry>
         <oasis:entry colname="col4">Unit</oasis:entry>
         <oasis:entry colname="col5"><inline-formula><mml:math id="M418" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula> –</oasis:entry>
         <oasis:entry colname="col6"><inline-formula><mml:math id="M419" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula> –</oasis:entry>
         <oasis:entry colname="col7"><inline-formula><mml:math id="M420" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula> –</oasis:entry>
         <oasis:entry colname="col8">Source</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">lower</oasis:entry>
         <oasis:entry colname="col6">most likely</oasis:entry>
         <oasis:entry colname="col7">upper</oasis:entry>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5">bound</oasis:entry>
         <oasis:entry colname="col6">value</oasis:entry>
         <oasis:entry colname="col7">bound</oasis:entry>
         <oasis:entry colname="col8"/>
       </oasis:row>
     </oasis:thead>
     <oasis:tbody>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M421" display="inline"><mml:mrow><mml:msub><mml:mi>f</mml:mi><mml:mi mathvariant="normal">Rb</mml:mi></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Frequency of</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4"><inline-formula><mml:math id="M422" display="inline"><mml:mi>n</mml:mi></mml:math></inline-formula> yr<inline-formula><mml:math id="M423" display="inline"><mml:mrow><mml:mo>-</mml:mo><mml:mn mathvariant="normal">1</mml:mn></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col5">1</oasis:entry>
         <oasis:entry colname="col6">2</oasis:entry>
         <oasis:entry colname="col7">4</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M424" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M425" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M426" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: ASTRA (2012)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">road blockage</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">icw. expert judgements</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">(local avalanche</oasis:entry>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">commission)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M427" display="inline"><mml:mrow><mml:msub><mml:mi>D</mml:mi><mml:mrow><mml:mi mathvariant="normal">Rb</mml:mi><mml:mo>,</mml:mo><mml:mi mathvariant="normal">A</mml:mi><mml:mn mathvariant="normal">10</mml:mn></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Duration of a</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4">d</oasis:entry>
         <oasis:entry colname="col5">0.33</oasis:entry>
         <oasis:entry colname="col6">1</oasis:entry>
         <oasis:entry colname="col7">2</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M428" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M429" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M430" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: ASTRA (2012)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">precautionary</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">icw. expert judgements</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">roadblock for</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">(local avalanche</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">avalanche</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">commission)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">with return</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">interval <inline-formula><mml:math id="M431" display="inline"><mml:mrow><mml:msub><mml:mi>T</mml:mi><mml:mn mathvariant="normal">10</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M432" display="inline"><mml:mrow><mml:msub><mml:mi>D</mml:mi><mml:mrow><mml:mi mathvariant="normal">Rb</mml:mi><mml:mo>,</mml:mo><mml:mi mathvariant="normal">A</mml:mi><mml:mn mathvariant="normal">30</mml:mn></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Duration of a</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4">d</oasis:entry>
         <oasis:entry colname="col5">1</oasis:entry>
         <oasis:entry colname="col6">2</oasis:entry>
         <oasis:entry colname="col7">3</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M433" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M434" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M435" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: ASTRA (2012)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">precautionary</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">icw. expert judgements</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">roadblock for</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">(local avalanche</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">avalanches</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">commission)</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">with return</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row rowsep="1">
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">interval <inline-formula><mml:math id="M436" display="inline"><mml:mrow><mml:msub><mml:mi>T</mml:mi><mml:mn mathvariant="normal">30</mml:mn></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8"/>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"><inline-formula><mml:math id="M437" display="inline"><mml:mrow><mml:msub><mml:mi>C</mml:mi><mml:mrow><mml:mi mathvariant="normal">Rb</mml:mi><mml:mo>,</mml:mo><mml:mi mathvariant="normal">W</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula></oasis:entry>
         <oasis:entry colname="col2">Expenses of a</oasis:entry>
         <oasis:entry colname="col3">–</oasis:entry>
         <oasis:entry colname="col4">EUR (in millions)</oasis:entry>
         <oasis:entry colname="col5">1.245</oasis:entry>
         <oasis:entry colname="col6">1.557</oasis:entry>
         <oasis:entry colname="col7">1.868</oasis:entry>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M438" display="inline"><mml:mi>m</mml:mi></mml:math></inline-formula>: BMNT (2015) CBA</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">roadblock</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">with statistical data of</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">during winter</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">guest-night per hotel</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2">season</oasis:entry>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">category from the local</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">tourism agency based on</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8">the year 2015.</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M439" display="inline"><mml:mi>l</mml:mi></mml:math></inline-formula>, <inline-formula><mml:math id="M440" display="inline"><mml:mi>u</mml:mi></mml:math></inline-formula>: range of fluctuation</oasis:entry>
       </oasis:row>
       <oasis:row>
         <oasis:entry colname="col1"/>
         <oasis:entry colname="col2"/>
         <oasis:entry colname="col3"/>
         <oasis:entry colname="col4"/>
         <oasis:entry colname="col5"/>
         <oasis:entry colname="col6"/>
         <oasis:entry colname="col7"/>
         <oasis:entry colname="col8"><inline-formula><mml:math id="M441" display="inline"><mml:mrow><mml:mo>±</mml:mo><mml:mn mathvariant="normal">20</mml:mn></mml:mrow></mml:math></inline-formula> %</oasis:entry>
       </oasis:row>
     </oasis:tbody>
   </oasis:tgroup></oasis:table></table-wrap>

<?xmltex \hack{\clearpage}?>
</sec>
</app>
  </app-group><notes notes-type="dataavailability"><title>Data availability</title>

      <p id="d1e11221">All risk-related data are publicly available (see references throughout the paper as well as in the Appendix).</p>
  </notes><notes notes-type="authorcontribution"><title>Author contributions</title>

      <p id="d1e11227">SO initiated the research; was responsible for data collection, literature research, the preparation of the paper and the visualization of the results; and performed the risk simulations with additional contributions by PS. PS contributed to additional information on probabilistic risk calculation. SF compiled the background on risk assessment and helped to
shape the research, analysis and the paper. All authors discussed the
results and contributed to the final paper.</p>
  </notes><notes notes-type="competinginterests"><title>Competing interests</title>

      <p id="d1e11233">Sven Fuchs is member of the Editorial Board of Natural Hazards and Earth System Sciences.</p>
  </notes><ack><title>Acknowledgements</title><p id="d1e11239">This work was supported by the government of the federal state of Salzburg, Austria, especially from the Geological Survey under supervision of Ludwig Fegerl and Gerald Valentin. The geological hazard analysis was conducted by Geoconsult ZT GmbH by Andreas Schober on behalf of the government of the federal state of Salzburg, which provided the hazard data for the risk analysis.</p></ack><notes notes-type="financialsupport"><title>Financial support</title>

      <p id="d1e11244">Open-access funding was provided by the BOKU Vienna (University of Natural Resources and Life Sciences, Vienna) Open Access Publishing Fund.</p>
  </notes><notes notes-type="reviewstatement"><title>Review statement</title>

      <p id="d1e11250">This paper was edited by Thomas Glade and reviewed by two anonymous referees.</p>
  </notes><ref-list>
    <title>References</title>

      <ref id="bib1.bib1"><label>1</label><?label 1?><mixed-citation>Apel, H., Thieken, A. H., Merz, B., and Blöschl, G.: Flood risk assessment and associated uncertainty, Nat. Hazards Earth Syst. Sci., 4, 295–308, <ext-link xlink:href="https://doi.org/10.5194/nhess-4-295-2004" ext-link-type="DOI">10.5194/nhess-4-295-2004</ext-link>, 2004.</mixed-citation></ref>
      <ref id="bib1.bib2"><label>2</label><?label 1?><mixed-citation>
ASTRA: Naturgefahren auf Nationalstraßen: Risikokonzept, Methodik
für eine risikobasierende Beurteilung, Prävention und
Bewältigung von gravitativen Naturgefahren auf Nationalstraßen V2.10, Bundesamt für Straßen (ASTRA), Bern, Switzerland, 98 pp., 2012.</mixed-citation></ref>
      <ref id="bib1.bib3"><label>3</label><?label 1?><mixed-citation>
Austrian Standards International: Protection works for torrent control – Terms and their definitions as well as classification, ONR 24800:2009 02 15, Austrian Standards International, Vienna, 2009.</mixed-citation></ref>
      <ref id="bib1.bib4"><label>4</label><?label 1?><mixed-citation>
Austrian Standards International: Permanent technical avalanche protection
– Terms, definition, static and dynamic load assumptions, ONR 24805:2010 06 01, Austrian Standards International, Vienna, 2010.</mixed-citation></ref>
      <ref id="bib1.bib5"><label>5</label><?label 1?><mixed-citation>
Austrian Standards International: Technical protection against rockfall –
Terms and definitions, effects of actions, design, monitoring and
maintenance, ONR 24810:2017 02 15, Austrian Standards International, Vienna, 2017.</mixed-citation></ref>
      <ref id="bib1.bib6"><label>6</label><?label 1?><mixed-citation>
BAFU – Bundesamt für Umwelt BAFU: Objektparameterliste EconoMe 2.2, Bern, 2013.</mixed-citation></ref>
      <ref id="bib1.bib7"><label>7</label><?label 1?><mixed-citation>Bell, R. and Glade, T.: Quantitative risk analysis for landslides – Examples from Bíldudalur, NW-Iceland, Nat. Hazards Earth Syst. Sci., 4, 117–131, <ext-link xlink:href="https://doi.org/10.5194/nhess-4-117-2004" ext-link-type="DOI">10.5194/nhess-4-117-2004</ext-link>, 2004.</mixed-citation></ref>
      <ref id="bib1.bib8"><label>8</label><?label 1?><mixed-citation>Benn, J. L.: Landslide events on the West Coast, South Island, 1867–2002,
New Zeal. Geogr., 61, 3–13, <ext-link xlink:href="https://doi.org/10.1111/j.1745-7939.2005.00001.x" ext-link-type="DOI">10.1111/j.1745-7939.2005.00001.x</ext-link>, 2005.</mixed-citation></ref>
      <ref id="bib1.bib9"><label>9</label><?label 1?><mixed-citation>BMLFUW: Richtlinie für Gefahrenzonenplanung, available at: <uri>https://www.bmlrt.gv.at/forst/wildbachlawinenverbauung/richtliniensammlung/GZP.html</uri> (last access: 23 November 2020), 2011.</mixed-citation></ref>
      <ref id="bib1.bib10"><label>10</label><?label 1?><mixed-citation>BMNT: Richtlinien für die Wirtschaftlichkeitsuntersuchung und
Priorisierung von Maßnahmen der Wildbach- und Lawinenverbauung
(Kosten-Nutzen-Untersuchung), available at:
<uri>https://www.bmnt.gv.at/forst/wildbach-lawinenverbauung/richtliniensammlung/Richtlinien.html</uri>
(last access: 1 June 2016), 2015.</mixed-citation></ref>
      <ref id="bib1.bib11"><label>11</label><?label 1?><mixed-citation>BMVIT: Durchschnittliche Unfallkosten Preisstand 2011, Bundesministerium
für Verkehr, Innovation und Technologie BMVIT, available at:
<uri>https://www.bmvit.gv.at/verkehr/strasse/sicherheit/strassenverkehrsunfaelle/ukr2012.html</uri>
(last access: 1 June 2016), 2014.</mixed-citation></ref>
      <ref id="bib1.bib12"><label>12</label><?label 1?><mixed-citation>
Bründl, M. (Ed.): Risikokonzept für Naturgefahren-Leitfaden,
Nationale Plattform für Naturgefahren (PLANAT), Bern, Switzerland, 422 pp., 2009.</mixed-citation></ref>
      <ref id="bib1.bib13"><label>13</label><?label 1?><mixed-citation>Bründl, M., Romang, H. E., Bischof, N., and Rheinberger, C. M.: The risk concept and its application in natural hazard risk management in Switzerland, Nat. Hazards Earth Syst. Sci., 9, 801–813, <ext-link xlink:href="https://doi.org/10.5194/nhess-9-801-2009" ext-link-type="DOI">10.5194/nhess-9-801-2009</ext-link>, 2009.</mixed-citation></ref>
      <ref id="bib1.bib14"><label>14</label><?label 1?><mixed-citation>
Bründl, M., Bartelt, P., Schweizer, J., Keiler, M., and Glade, T.: Review
and future challenges in snow avalanche risk analysis, in: Geomorphological Hazards and Disaster Prevention, edited by: Alcántara-Ayala, I. and Goudie, A. S., Cambridge University Press, Cambridge, UK, 49–61, 2010.</mixed-citation></ref>
      <ref id="bib1.bib15"><label>15</label><?label 1?><mixed-citation>Bründl, M., Ettlin, L., Burkard, A., Oggier, N., Dolf, F., and Gutwein,
P.: EconoMe – Wirksamkeit und Wirtschaftlichkeit von Schutzmaßnahmen
gegen Naturgefahren, Formelsammlung, available at: <uri>https://econome.ch/eco_work/doc/Formelsammlung_EconoMe_4-0_2016_D.pdf</uri> (last access: 23 November 2020), 2015.</mixed-citation></ref>
      <ref id="bib1.bib16"><label>16</label><?label 1?><mixed-citation>Bunce, C., Cruden, D., and Morgenstern, N.: Assessment of the hazard from rock fall on a highway, Can. Geotech. J., 34, 344–356, <ext-link xlink:href="https://doi.org/10.1139/t97-009" ext-link-type="DOI">10.1139/t97-009</ext-link>, 1997.</mixed-citation></ref>
      <ref id="bib1.bib17"><label>17</label><?label 1?><mixed-citation>Ciurean, R. L., Hussin, H., van Westen, C. J., Jaboyedoff, M., Nicolet, P.,
Chen, L., Frigerio, S., and Glade, T.: Multi-scale debris flow vulnerability
assessment and direct loss estimation of buildings in the Eastern Italian
Alps, Nat. Hazards, 85, 929–957, <ext-link xlink:href="https://doi.org/10.1007/s11069-016-2612-6" ext-link-type="DOI">10.1007/s11069-016-2612-6</ext-link>, 2017.</mixed-citation></ref>
      <ref id="bib1.bib18"><label>18</label><?label 1?><mixed-citation>Cottin, C. and Döhler, S.: Risikoanalyse. Modellierung, Beurteilung und
Management von Risiken mit Praxisbeispielen, Springer Spektrum, Wiesbaden, Germany, <ext-link xlink:href="https://doi.org/10.1007/978-3-658-00830-7" ext-link-type="DOI">10.1007/978-3-658-00830-7</ext-link>, 2013.</mixed-citation></ref>
      <ref id="bib1.bib19"><label>19</label><?label 1?><mixed-citation>Dai, E. C., Lee, C. F., and Ngai, Y. Y.: Landslide risk assessment and management: an overview, Eng. Geol., 64, 65–87,
<ext-link xlink:href="https://doi.org/10.1016/S0013-7952(01)00093-X" ext-link-type="DOI">10.1016/S0013-7952(01)00093-X</ext-link>, 2002.</mixed-citation></ref>
      <?pagebreak page3159?><ref id="bib1.bib20"><label>20</label><?label 1?><mixed-citation>Dorren, L. K. A.: Rockyfor3D (V5.1) Transparent description of the complete
3D rockfall model, available at: <uri>https://www.ecorisq.com</uri> (last access: 1 June 2016), 2012.</mixed-citation></ref>
      <ref id="bib1.bib21"><label>21</label><?label 1?><mixed-citation>Fell, R., Corominas, J., Bonnard, C., Cascini, L., Leroi, E., and Savage, W.:
Guidelines for landslide susceptibility, hazard and risk zoning for land-use
planning, Eng. Geol., 102, 85–98, <ext-link xlink:href="https://doi.org/10.1016/j.enggeo.2008.03.022" ext-link-type="DOI">10.1016/j.enggeo.2008.03.022</ext-link>, 2008a.</mixed-citation></ref>
      <ref id="bib1.bib22"><label>22</label><?label 1?><mixed-citation>Fell, R., Corominas, J., Bonnard, C., Cascini, L., Leroi, E., and Savage, W.:
Guidelines for landslide susceptibility, hazard and risk zoning for land-use
planning – Commentary, Eng. Geol., 102, 99–111, <ext-link xlink:href="https://doi.org/10.1016/j.enggeo.2008.03.014" ext-link-type="DOI">10.1016/j.enggeo.2008.03.014</ext-link>, 2008b.</mixed-citation></ref>
      <ref id="bib1.bib23"><label>23</label><?label 1?><mixed-citation>Ferlisi, S., Cascini, L., Corominas, J., and Matano, F.: Rockfall risk
assessment to persons travelling in vehicles along a road: the case study of
the Amalfi coastal road (southern Italy), Nat. Hazards, 62, 691–721,
<ext-link xlink:href="https://doi.org/10.1111/nzg.12170" ext-link-type="DOI">10.1111/nzg.12170</ext-link>, 2012.</mixed-citation></ref>
      <ref id="bib1.bib24"><label>24</label><?label 1?><mixed-citation>
Flow-2D Software: Flow-2D Reference Manual, Flow-2D Software Inc., Nutrioso, 2017.</mixed-citation></ref>
      <ref id="bib1.bib25"><label>25</label><?label 1?><mixed-citation>Fuchs, S.: Susceptibility versus resilience to mountain hazards in Austria – paradigms of vulnerability revisited, Nat. Hazards Earth Syst. Sci., 9, 337–352, <ext-link xlink:href="https://doi.org/10.5194/nhess-9-337-2009" ext-link-type="DOI">10.5194/nhess-9-337-2009</ext-link>, 2009.</mixed-citation></ref>
      <ref id="bib1.bib26"><label>26</label><?label 1?><mixed-citation>Fuchs, S., Heiss, K., and Hübl, J.: Towards an empirical vulnerability function for use in debris flow risk assessment, Nat. Hazards Earth Syst. Sci., 7, 495–506, <ext-link xlink:href="https://doi.org/10.5194/nhess-7-495-2007" ext-link-type="DOI">10.5194/nhess-7-495-2007</ext-link>, 2007.</mixed-citation></ref>
      <ref id="bib1.bib27"><label>27</label><?label 1?><mixed-citation>Fuchs, S., Keiler, M., Sokratov, S., and Shnyparkov, A.: Spatiotemporal
dynamics: the need for an innovative approach in mountain hazard risk
management, Nat. Hazards, 68, 1217–1241,
<ext-link xlink:href="https://doi.org/10.1007/s11069-012-0508-7" ext-link-type="DOI">10.1007/s11069-012-0508-7</ext-link>, 2013.</mixed-citation></ref>
      <ref id="bib1.bib28"><label>28</label><?label 1?><mixed-citation>Fuchs, S., Keiler, M., and Zischg, A.: A spatiotemporal multi-hazard exposure assessment based on property data, Nat. Hazards Earth Syst. Sci., 15, 2127–2142, <ext-link xlink:href="https://doi.org/10.5194/nhess-15-2127-2015" ext-link-type="DOI">10.5194/nhess-15-2127-2015</ext-link>, 2015.</mixed-citation></ref>
      <ref id="bib1.bib29"><label>29</label><?label 1?><mixed-citation>Fuchs, S., Röthlisberger, V., Thaler, T., Zischg, A., and Keiler, M.:
Natural hazard management from a coevolutionary perspective: Exposure and
policy response in the European Alps, Ann. Am. Assoc. Geogr., 107, 382–392, <ext-link xlink:href="https://doi.org/10.1080/24694452.2016.1235494" ext-link-type="DOI">10.1080/24694452.2016.1235494</ext-link>, 2017.</mixed-citation></ref>
      <ref id="bib1.bib30"><label>30</label><?label 1?><mixed-citation>Fuchs, S., Keiler, M., Ortlepp, R., Schinke, R., and Papathoma-Köhle, M.:
Recent advances in vulnerability assessment for the built environment
exposed to torrential hazards: Challenges and the way forward, J. Hydrol.,
575, 587–595, <ext-link xlink:href="https://doi.org/10.1016/j.jhydrol.2019.05.067" ext-link-type="DOI">10.1016/j.jhydrol.2019.05.067</ext-link>, 2019.</mixed-citation></ref>
      <ref id="bib1.bib31"><label>31</label><?label 1?><mixed-citation>
Geoconsult ZT GmbH: Gefahrenanalyse B99, Technischer Bericht Sturzprozesse,
Salzburg, 2016.</mixed-citation></ref>
      <ref id="bib1.bib32"><label>32</label><?label 1?><mixed-citation>Grêt-Regamey, A. and Straub, D.: Spatially explicit avalanche risk assessment linking Bayesian networks to a GIS, Nat. Hazards Earth Syst. Sci., 6, 911–926, <ext-link xlink:href="https://doi.org/10.5194/nhess-6-911-2006" ext-link-type="DOI">10.5194/nhess-6-911-2006</ext-link>, 2006.</mixed-citation></ref>
      <ref id="bib1.bib33"><label>33</label><?label 1?><mixed-citation>Guikema, S., McLay, L., and Lambert, J. H.: Infrastructure Systems, Risk
Analysis, and Resilience – Research Gaps and Opportunities, Risk Anal., 35, 560–561, <ext-link xlink:href="https://doi.org/10.1111/risa.12416" ext-link-type="DOI">10.1111/risa.12416</ext-link>, 2015.</mixed-citation></ref>
      <ref id="bib1.bib34"><label>34</label><?label 1?><mixed-citation>Hendrikx, J. and Owens, I.: Modified avalanche risk equations to account for
waiting traffic on avalanche prone roads, Cold Reg. Sci. Technol., 51,
214–218, <ext-link xlink:href="https://doi.org/10.1016/j.coldregions.2007.04.011" ext-link-type="DOI">10.1016/j.coldregions.2007.04.011</ext-link>, 2008.</mixed-citation></ref>
      <ref id="bib1.bib35"><label>35</label><?label 1?><mixed-citation>Hood, K.: The science of value: Economic expertise and the valuation of human
life in US federal regulatory agencies, Soc. Stud. Sci., 47, 441–465,
<ext-link xlink:href="https://doi.org/10.1177/0306312717693465" ext-link-type="DOI">10.1177/0306312717693465</ext-link>, 2017.</mixed-citation></ref>
      <ref id="bib1.bib36"><label>36</label><?label 1?><mixed-citation>Hungr, O. and Beckie, R.: Assessment of the hazard from rock fall on a highway: Discussion, Can. Geotech. J., 35, 409, <ext-link xlink:href="https://doi.org/10.1139/t98-002" ext-link-type="DOI">10.1139/t98-002</ext-link>, 1998.</mixed-citation></ref>
      <ref id="bib1.bib37"><label>37</label><?label 1?><mixed-citation>
International Organization for Standardization: Risk management –
Principles and guidelines on implementation, ISO 31000, Geneva, 2009.</mixed-citation></ref>
      <ref id="bib1.bib38"><label>38</label><?label 1?><mixed-citation>
IUGS Committee on Risk Assessment: Quantitative risk assessment for slopes
and landslides – The state of the art, in: Proceedings of the International Workshop of Landslide Risk Assessment, Honolulu, USA, 3–12, 1997.</mixed-citation></ref>
      <ref id="bib1.bib39"><label>39</label><?label 1?><mixed-citation>Kappes, M. S., Keiler, M., von Elverfeldt, K., and Glade, T.: Challenges of
analyzing multi-hazard risk: a review, Nat. Hazards, 64, 1925–1958,
<ext-link xlink:href="https://doi.org/10.1007/s11069-012-0294-2" ext-link-type="DOI">10.1007/s11069-012-0294-2</ext-link>, 2012a.</mixed-citation></ref>
      <ref id="bib1.bib40"><label>40</label><?label 1?><mixed-citation>Kappes, M. S., Gruber, K., Frigerio, S., Bell, R., Keiler, M., and Glade, T.: The MultiRISK platform: The technical concept and application of a
regional-scale multihazard exposure analysis tool, Geomorphology, 151/152,
139–155, <ext-link xlink:href="https://doi.org/10.1016/j.geomorph.2012.01.024" ext-link-type="DOI">10.1016/j.geomorph.2012.01.024</ext-link>, 2012b.</mixed-citation></ref>
      <ref id="bib1.bib41"><label>41</label><?label 1?><mixed-citation>Kirchsteiger, C.: On the use of probabilistic and deterministic methods in
risk analysis, J. Loss Prevent. Proc., 12, 399–419, <ext-link xlink:href="https://doi.org/10.1016/S0950-4230(99)00012-1" ext-link-type="DOI">10.1016/S0950-4230(99)00012-1</ext-link>, 1999.</mixed-citation></ref>
      <ref id="bib1.bib42"><label>42</label><?label 1?><mixed-citation>Kristensen, K., Harbitz, C., and Harbitz, A.: Road traffic and avalanches –
methods for risk evaluation and risk management, Surv. Geophys., 24, 603–616, <ext-link xlink:href="https://doi.org/10.1023/B:GEOP.0000006085.10702.cf" ext-link-type="DOI">10.1023/B:GEOP.0000006085.10702.cf</ext-link>, 2003.</mixed-citation></ref>
      <ref id="bib1.bib43"><label>43</label><?label 1?><mixed-citation>Lechowska, E.: What determines flood risk perception? A review of factors of
flood risk perception and relations between its basic elements, Nat. Hazards, 94, 1341–1366, <ext-link xlink:href="https://doi.org/10.1007/s11069-018-3480-z" ext-link-type="DOI">10.1007/s11069-018-3480-z</ext-link>, 2018.</mixed-citation></ref>
      <ref id="bib1.bib44"><label>44</label><?label 1?><mixed-citation>Margreth, S., Stoffel, L., and Wilhelm, C.: Winter opening of high alpine pass roads – analysis and case studies from the Swiss Alps, Cold Reg. Sci. Technol., 37, 467–482, <ext-link xlink:href="https://doi.org/10.1016/S0165-232X(03)00085-5" ext-link-type="DOI">10.1016/S0165-232X(03)00085-5</ext-link>, 2003.</mixed-citation></ref>
      <ref id="bib1.bib45"><label>45</label><?label 1?><mixed-citation>Markantonis, V., Meyer, V., and Schwarze, R.: Review Article “Valuating the intangible effects of natural hazards – review and analysis of the costing methods”, Nat. Hazards Earth Syst. Sci., 12, 1633–1640, <ext-link xlink:href="https://doi.org/10.5194/nhess-12-1633-2012" ext-link-type="DOI">10.5194/nhess-12-1633-2012</ext-link>, 2012.</mixed-citation></ref>
      <ref id="bib1.bib46"><label>46</label><?label 1?><mixed-citation>Merz, B. and Thieken, A. H.: Separating natural and epistemic uncertainty in
flood frequency analysis, J. Hydrol., 309, 114–132,
<ext-link xlink:href="https://doi.org/10.1016/j.jhydrol.2004.11.015" ext-link-type="DOI">10.1016/j.jhydrol.2004.11.015</ext-link>, 2005.</mixed-citation></ref>
      <ref id="bib1.bib47"><label>47</label><?label 1?><mixed-citation>Merz, B. and Thieken, A. H.: Flood risk curves and associated uncertainty
bounds, Nat. Hazards, 51, 437–458, <ext-link xlink:href="https://doi.org/10.1007/s11069-009-9452-6" ext-link-type="DOI">10.1007/s11069-009-9452-6</ext-link>, 2009.</mixed-citation></ref>
      <ref id="bib1.bib48"><label>48</label><?label 1?><mixed-citation>Merz, B., Kreibich, H., Thieken, A., and Schmidtke, R.: Estimation uncertainty of direct monetary flood damage to buildings, Nat. Hazards Earth Syst. Sci., 4, 153–163, <ext-link xlink:href="https://doi.org/10.5194/nhess-4-153-2004" ext-link-type="DOI">10.5194/nhess-4-153-2004</ext-link>, 2004.</mixed-citation></ref>
      <ref id="bib1.bib49"><label>49</label><?label 1?><mixed-citation>Merz, B., Elmer, F., and Thieken, A. H.: Significance of “high probability/low damage” versus “low probability/high damage” flood events, Nat. Hazards Earth Syst. Sci., 9, 1033–1046, <ext-link xlink:href="https://doi.org/10.5194/nhess-9-1033-2009" ext-link-type="DOI">10.5194/nhess-9-1033-2009</ext-link>, 2009.</mixed-citation></ref>
      <ref id="bib1.bib50"><label>50</label><?label 1?><mixed-citation>Merz, B., Kreibich, H., Schwarze, R., and Thieken, A.: Review article “Assessment of economic flood damage”, Nat. Hazards Earth Syst. Sci., 10, 1697–1724, <ext-link xlink:href="https://doi.org/10.5194/nhess-10-1697-2010" ext-link-type="DOI">10.5194/nhess-10-1697-2010</ext-link>, 2010.</mixed-citation></ref>
      <ref id="bib1.bib51"><label>51</label><?label 1?><mixed-citation>Meyer, V., Becker, N., Markantonis, V., Schwarze, R., van den Bergh, J. C. J. M., Bouwer, L. M., Bubeck, P., Ciavola, P.<?pagebreak page3160?>, Genovese, E., Green, C., Hallegatte, S., Kreibich, H., Lequeux, Q., Logar, I., Papyrakis, E., Pfurtscheller, C., Poussin, J., Przyluski, V., Thieken, A. H., and Viavattene, C.: Review article: Assessing the costs of natural hazards – state of the art and knowledge gaps, Nat. Hazards Earth Syst. Sci., 13, 1351–1373, <ext-link xlink:href="https://doi.org/10.5194/nhess-13-1351-2013" ext-link-type="DOI">10.5194/nhess-13-1351-2013</ext-link>, 2013.</mixed-citation></ref>
      <ref id="bib1.bib52"><label>52</label><?label 1?><mixed-citation>Michoud, C., Derron, M.-H., Horton, P., Jaboyedoff, M., Baillifard, F.-J., Loye, A., Nicolet, P., Pedrazzini, A., and Queyrel, A.: Rockfall hazard and risk assessments along roads at a regional scale: example in Swiss Alps, Nat. Hazards Earth Syst. Sci., 12, 615–629, <ext-link xlink:href="https://doi.org/10.5194/nhess-12-615-2012" ext-link-type="DOI">10.5194/nhess-12-615-2012</ext-link>, 2012.</mixed-citation></ref>
      <ref id="bib1.bib53"><label>53</label><?label 1?><mixed-citation>
Oberndorfer, S.: Technischer Bericht – Gefahrenanalyse Wildbach – Lawinengefahren B99 Katschberg Straße, Radstadt – Obertauern – Mauterndorf, km24,70–km62,60, Ziviltechnikerkanzlei Oberndorfer, Leogang, 2016.</mixed-citation></ref>
      <ref id="bib1.bib54"><label>54</label><?label 1?><mixed-citation>
Oberndorfer, S., Fuchs, S., Rickenmann, D., and Andrecs, P.:
Vulnerabilitätsanalyse und monetäre Schadensbewertung von
Wildbachereignissen in Österreich, Bundesforschung- und Ausbildungszentrum für Wald, Naturgefahren und Landschaft, Vienna, Austria, 5 pp., 2007.</mixed-citation></ref>
      <ref id="bib1.bib55"><label>55</label><?label 1?><mixed-citation>Papathoma-Köhle, M., Kappes, M., Keiler, M., and Glade, T.: Physical
vulnerability assessment for alpine hazards: state of the art and future
needs, Nat. Hazards, 58, 645–680, <ext-link xlink:href="https://doi.org/10.1007/s11069-010-9632-4" ext-link-type="DOI">10.1007/s11069-010-9632-4</ext-link>, 2011.</mixed-citation></ref>
      <ref id="bib1.bib56"><label>56</label><?label 1?><mixed-citation>Papathoma-Köhle, M., Gems, B., Sturm, M., and Fuchs, S.: Matrices, curves
and indicators: A review of approaches to assess physical vulnerability to
debris flow, Earth-Sci. Rev., 171, 272–288,
<ext-link xlink:href="https://doi.org/10.1016/j.earscirev.2017.06.007" ext-link-type="DOI">10.1016/j.earscirev.2017.06.007</ext-link>, 2017.</mixed-citation></ref>
      <ref id="bib1.bib57"><label>57</label><?label 1?><mixed-citation>
Republik Österreich: Forstgesetz 1975, BGBl 440/1975, Republik
Österreich, Vienna, 1975.</mixed-citation></ref>
      <ref id="bib1.bib58"><label>58</label><?label 1?><mixed-citation>
Republik Österreich: Verordnung des Bundesministeriums für Land- und
Forstwirtschaft vom 30. Juli 1976 über die Gefahrenzonenpläne, BGBl 436/1975, Republik Österreich, Vienna, 1976.</mixed-citation></ref>
      <ref id="bib1.bib59"><label>59</label><?label 1?><mixed-citation>Rheinberger, C. M., Bründl, M., and Rhyner, J.: Dealing with the white death: Avalanche risk management for traffic routes, Risk Anal., 29, 76–94,
<ext-link xlink:href="https://doi.org/10.1111/j.1539-6924.2008.01127.x" ext-link-type="DOI">10.1111/j.1539-6924.2008.01127.x</ext-link>, 2009.</mixed-citation></ref>
      <ref id="bib1.bib60"><label>60</label><?label 1?><mixed-citation>
RiskConsult GmbH: RIAAT Risk Administration and Analysis Tools, Manual,
Version 28-F01, Innsbruck, 2015.</mixed-citation></ref>
      <ref id="bib1.bib61"><label>61</label><?label 1?><mixed-citation>
Roberds, W.: Estimating temporal and spatial variability and vulnerability,
in:  Landslide risk management, edited by: Hungr, O., Fell, R., Couture, R., and Eberhardt, E., Taylor and Francis Group, London, UK, 129–157, 2005.</mixed-citation></ref>
      <ref id="bib1.bib62"><label>62</label><?label 1?><mixed-citation>
Sampl, P.: SamosAT – Beschreibung der Modelltheorie und Numerik, AVL List GmbH, Graz, 2007.</mixed-citation></ref>
      <ref id="bib1.bib63"><label>63</label><?label 1?><mixed-citation>
Sander, P.: Probabilistische Risiko-Analyse für Bauprojekte. Entwicklung
eines branchenorientierten softwaregestützten Risiko-Analyse-Systems,
Innsbruck University Press, Innsbruck, Austria, 2012.</mixed-citation></ref>
      <ref id="bib1.bib64"><label>64</label><?label 1?><mixed-citation>Sander, P., Reilly, J. J., and Moergeli, A.: Quantitative Risk Analysis –
Fallacy of the Single Number, in: ITA World Tunnel Congress 2015, Dubrovnik, Croatia, 2015.
 </mixed-citation></ref><?xmltex \hack{\newpage}?>
      <ref id="bib1.bib65"><label>65</label><?label 1?><mixed-citation>
Schaerer, P.: The avalanche-hazard index, Ann. Glaciol., 13, 241–247, 1989.</mixed-citation></ref>
      <ref id="bib1.bib66"><label>66</label><?label 1?><mixed-citation>Schaub, Y. and Bründl, M: Zur Sensitivität der Risikoberechnung und
Maßnahmenbewertung von Naturgefahren, Schweizerische Zeitschrift für
Forstwesen, 161, 27–35, <ext-link xlink:href="https://doi.org/10.3188/szf.2010.0027" ext-link-type="DOI">10.3188/szf.2010.0027</ext-link>, 2010.</mixed-citation></ref>
      <ref id="bib1.bib67"><label>67</label><?label 1?><mixed-citation>Schlögl, M., Richter, G., Avian, M., Thaler, T., Heiss, G., Lenz, G., and Fuchs, S.: On the nexus between landslide susceptibility and transport infrastructure – an agent-based approach, Nat. Hazards Earth Syst. Sci., 19, 201–219, <ext-link xlink:href="https://doi.org/10.5194/nhess-19-201-2019" ext-link-type="DOI">10.5194/nhess-19-201-2019</ext-link>, 2019.</mixed-citation></ref>
      <ref id="bib1.bib68"><label>68</label><?label 1?><mixed-citation>
Špačková, O., Rimböck, A., and Straub, D.: Risk management in
Bavarian Alpine torrents: a framework for flood risk quantification
accounting for subscenarios, in: Proc. of the IAEG Congress 2014, IAEG XII
congress, Torino, Italy, 2014.</mixed-citation></ref>
      <ref id="bib1.bib69"><label>69</label><?label 1?><mixed-citation>
Špačková, O.: RAT Risk Analysis Tool. Risk assessment and cost
benefit analysis of risk mitigation strategies – Methodology, Technical University of Munich, Engineering Risk Analysis Group, Munich, Germany,  2016.</mixed-citation></ref>
      <ref id="bib1.bib70"><label>70</label><?label 1?><mixed-citation>
Tecklenburg, T.: Risikomanagement bei der Akquisition von Großprojekten
in der Bauwirtschaft, PhD thesis, Schüling Verlag, Münster, Germany, 2003.</mixed-citation></ref>
      <ref id="bib1.bib71"><label>71</label><?label 1?><mixed-citation>
UNDRO: Natural disasters and vulnerability analysis, Department of
Humanitarian Affairs/United Nations Disaster Relief Office, Geneva, 1979.</mixed-citation></ref>
      <ref id="bib1.bib72"><label>72</label><?label 1?><mixed-citation>
UNISDR: Living with risk: A global review of disaster reduction initiatives,
United Nations Publication, Geneva, 2004.</mixed-citation></ref>
      <ref id="bib1.bib73"><label>73</label><?label 1?><mixed-citation>Unterrader, S., Almond, P., and Fuchs, S.: Rockfall in the Port Hills of
Christchurch: Seismic and non-seismic fatality risk on roads, New Zeal.
Geogr., 74, 3–14, <ext-link xlink:href="https://doi.org/10.1111/nzg.12170" ext-link-type="DOI">10.1111/nzg.12170</ext-link>, 2018.</mixed-citation></ref>
      <ref id="bib1.bib74"><label>74</label><?label 1?><mixed-citation>
Varnes, D.: Landslide hazard zonation: a review of principles and practice,
UNESCO, Paris, 1984.</mixed-citation></ref>
      <ref id="bib1.bib75"><label>75</label><?label 1?><mixed-citation>Wachinger, G., Renn, O., Begg, C., and Kuhlicke, C.: The risk perception
paradox – implications for governance and communication of natural hazards,
Risk Anal., 33, 1049–1065, <ext-link xlink:href="https://doi.org/10.1111/j.1539-6924.2012.01942.x" ext-link-type="DOI">10.1111/j.1539-6924.2012.01942.x</ext-link>,
2013.</mixed-citation></ref>
      <ref id="bib1.bib76"><label>76</label><?label 1?><mixed-citation>Wastl, M., Stötter, J., and Kleindienst, H.: Avalanche risk assessment for mountain roads: a case study from Iceland, Nat. Hazards, 56, 465–480,
<ext-link xlink:href="https://doi.org/10.1007/s11069-010-9703-6" ext-link-type="DOI">10.1007/s11069-010-9703-6</ext-link>, 2011.</mixed-citation></ref>
      <ref id="bib1.bib77"><label>77</label><?label 1?><mixed-citation>Winter, B., Schneeberger, K., Huttenlau, M., and Stötter, J.: Sources of
uncertainty in a probabilistic flood risk model, Nat. Hazards, 91, 431–446,
<ext-link xlink:href="https://doi.org/10.1007/s11069-017-3135-5" ext-link-type="DOI">10.1007/s11069-017-3135-5</ext-link>, 2018.</mixed-citation></ref>
      <ref id="bib1.bib78"><label>78</label><?label 1?><mixed-citation>Zischg, A., Fuchs, S., Keiler, M., and Meißl, G.: Modelling the system behaviour of wet snow avalanches using an expert system approach for risk management on high alpine traffic roads, Nat. Hazards Earth Syst. Sci., 5, 821–832, <ext-link xlink:href="https://doi.org/10.5194/nhess-5-821-2005" ext-link-type="DOI">10.5194/nhess-5-821-2005</ext-link>, 2005.</mixed-citation></ref>

  </ref-list></back>
    <!--<article-title-html>Multi-hazard risk assessment for roads: probabilistic  versus deterministic approaches</article-title-html>
<abstract-html><p>Mountain hazard risk analysis for transport infrastructure is regularly based on deterministic approaches. Standard risk assessment approaches for roads need a variety of variables and data for risk computation, however without considering potential uncertainty in the input data. Consequently, input data needed for risk assessment are normally processed as discrete mean values without scatter or as an individual deterministic value from expert judgement if no statistical data are available. To overcome this gap, we used a probabilistic approach to analyse the effect of input data uncertainty on the results, taking a mountain road in the Eastern European Alps as a case study. The uncertainty of the input data are expressed with potential bandwidths using two different distribution functions. The risk assessment included risk for persons, property risk and risk for non-operational availability exposed to a multi-hazard environment
(torrent processes, snow avalanches and rockfall). The study focuses on the
epistemic uncertainty of the risk terms (exposure situations, vulnerability
factors and monetary values), ignoring potential sources of variation in the
hazard analysis. As a result, reliable quantiles of the calculated probability density distributions attributed to the aggregated road risk due to the impact of multiple mountain hazards were compared to the
deterministic outcome from the standard guidelines on road safety. The
results based on our case study demonstrate that with common deterministic
approaches risk might be underestimated in comparison to a probabilistic
risk modelling setup, mainly due to epistemic uncertainties of the input
data. The study provides added value to further develop standardized road
safety guidelines and may therefore be of particular importance for road
authorities and political decision-makers.</p></abstract-html>
<ref-html id="bib1.bib1"><label>1</label><mixed-citation>
Apel, H., Thieken, A. H., Merz, B., and Blöschl, G.: Flood risk assessment and associated uncertainty, Nat. Hazards Earth Syst. Sci., 4, 295–308, <a href="https://doi.org/10.5194/nhess-4-295-2004" target="_blank">https://doi.org/10.5194/nhess-4-295-2004</a>, 2004.
</mixed-citation></ref-html>
<ref-html id="bib1.bib2"><label>2</label><mixed-citation>
ASTRA: Naturgefahren auf Nationalstraßen: Risikokonzept, Methodik
für eine risikobasierende Beurteilung, Prävention und
Bewältigung von gravitativen Naturgefahren auf Nationalstraßen V2.10, Bundesamt für Straßen (ASTRA), Bern, Switzerland, 98&thinsp;pp., 2012.
</mixed-citation></ref-html>
<ref-html id="bib1.bib3"><label>3</label><mixed-citation>
Austrian Standards International: Protection works for torrent control – Terms and their definitions as well as classification, ONR 24800:2009 02 15, Austrian Standards International, Vienna, 2009.
</mixed-citation></ref-html>
<ref-html id="bib1.bib4"><label>4</label><mixed-citation>
Austrian Standards International: Permanent technical avalanche protection
– Terms, definition, static and dynamic load assumptions, ONR 24805:2010 06 01, Austrian Standards International, Vienna, 2010.
</mixed-citation></ref-html>
<ref-html id="bib1.bib5"><label>5</label><mixed-citation>
Austrian Standards International: Technical protection against rockfall –
Terms and definitions, effects of actions, design, monitoring and
maintenance, ONR 24810:2017 02 15, Austrian Standards International, Vienna, 2017.
</mixed-citation></ref-html>
<ref-html id="bib1.bib6"><label>6</label><mixed-citation>
BAFU – Bundesamt für Umwelt BAFU: Objektparameterliste EconoMe 2.2, Bern, 2013.
</mixed-citation></ref-html>
<ref-html id="bib1.bib7"><label>7</label><mixed-citation>
Bell, R. and Glade, T.: Quantitative risk analysis for landslides – Examples from Bíldudalur, NW-Iceland, Nat. Hazards Earth Syst. Sci., 4, 117–131, <a href="https://doi.org/10.5194/nhess-4-117-2004" target="_blank">https://doi.org/10.5194/nhess-4-117-2004</a>, 2004.
</mixed-citation></ref-html>
<ref-html id="bib1.bib8"><label>8</label><mixed-citation>
Benn, J. L.: Landslide events on the West Coast, South Island, 1867–2002,
New Zeal. Geogr., 61, 3–13, <a href="https://doi.org/10.1111/j.1745-7939.2005.00001.x" target="_blank">https://doi.org/10.1111/j.1745-7939.2005.00001.x</a>, 2005.
</mixed-citation></ref-html>
<ref-html id="bib1.bib9"><label>9</label><mixed-citation>
BMLFUW: Richtlinie für Gefahrenzonenplanung, available at: <a href="https://www.bmlrt.gv.at/forst/wildbachlawinenverbauung/&#xA;richtliniensammlung/GZP.html" target="_blank"/> (last access: 23 November 2020), 2011.
</mixed-citation></ref-html>
<ref-html id="bib1.bib10"><label>10</label><mixed-citation>
BMNT: Richtlinien für die Wirtschaftlichkeitsuntersuchung und
Priorisierung von Maßnahmen der Wildbach- und Lawinenverbauung
(Kosten-Nutzen-Untersuchung), available at:
<a href="https://www.bmnt.gv.at/forst/wildbach-lawinenverbauung/richtliniensammlung/Richtlinien.html" target="_blank"/>
(last access: 1 June 2016), 2015.
</mixed-citation></ref-html>
<ref-html id="bib1.bib11"><label>11</label><mixed-citation>
BMVIT: Durchschnittliche Unfallkosten Preisstand 2011, Bundesministerium
für Verkehr, Innovation und Technologie BMVIT, available at:
<a href="https://www.bmvit.gv.at/verkehr/strasse/sicherheit/strassenverkehrsunfaelle/ukr2012.html" target="_blank"/>
(last access: 1 June 2016), 2014.
</mixed-citation></ref-html>
<ref-html id="bib1.bib12"><label>12</label><mixed-citation>
Bründl, M. (Ed.): Risikokonzept für Naturgefahren-Leitfaden,
Nationale Plattform für Naturgefahren (PLANAT), Bern, Switzerland, 422&thinsp;pp., 2009.
</mixed-citation></ref-html>
<ref-html id="bib1.bib13"><label>13</label><mixed-citation>
Bründl, M., Romang, H. E., Bischof, N., and Rheinberger, C. M.: The risk concept and its application in natural hazard risk management in Switzerland, Nat. Hazards Earth Syst. Sci., 9, 801–813, <a href="https://doi.org/10.5194/nhess-9-801-2009" target="_blank">https://doi.org/10.5194/nhess-9-801-2009</a>, 2009.
</mixed-citation></ref-html>
<ref-html id="bib1.bib14"><label>14</label><mixed-citation>
Bründl, M., Bartelt, P., Schweizer, J., Keiler, M., and Glade, T.: Review
and future challenges in snow avalanche risk analysis, in: Geomorphological Hazards and Disaster Prevention, edited by: Alcántara-Ayala, I. and Goudie, A. S., Cambridge University Press, Cambridge, UK, 49–61, 2010.
</mixed-citation></ref-html>
<ref-html id="bib1.bib15"><label>15</label><mixed-citation>
Bründl, M., Ettlin, L., Burkard, A., Oggier, N., Dolf, F., and Gutwein,
P.: EconoMe – Wirksamkeit und Wirtschaftlichkeit von Schutzmaßnahmen
gegen Naturgefahren, Formelsammlung, available at: <a href="https://econome.ch/eco_work/doc/Formelsammlung_EconoMe_4-0_2016_D.pdf" target="_blank"/> (last access: 23 November 2020), 2015.
</mixed-citation></ref-html>
<ref-html id="bib1.bib16"><label>16</label><mixed-citation>
Bunce, C., Cruden, D., and Morgenstern, N.: Assessment of the hazard from rock fall on a highway, Can. Geotech. J., 34, 344–356, <a href="https://doi.org/10.1139/t97-009" target="_blank">https://doi.org/10.1139/t97-009</a>, 1997.
</mixed-citation></ref-html>
<ref-html id="bib1.bib17"><label>17</label><mixed-citation>
Ciurean, R. L., Hussin, H., van Westen, C. J., Jaboyedoff, M., Nicolet, P.,
Chen, L., Frigerio, S., and Glade, T.: Multi-scale debris flow vulnerability
assessment and direct loss estimation of buildings in the Eastern Italian
Alps, Nat. Hazards, 85, 929–957, <a href="https://doi.org/10.1007/s11069-016-2612-6" target="_blank">https://doi.org/10.1007/s11069-016-2612-6</a>, 2017.
</mixed-citation></ref-html>
<ref-html id="bib1.bib18"><label>18</label><mixed-citation>
Cottin, C. and Döhler, S.: Risikoanalyse. Modellierung, Beurteilung und
Management von Risiken mit Praxisbeispielen, Springer Spektrum, Wiesbaden, Germany, <a href="https://doi.org/10.1007/978-3-658-00830-7" target="_blank">https://doi.org/10.1007/978-3-658-00830-7</a>, 2013.
</mixed-citation></ref-html>
<ref-html id="bib1.bib19"><label>19</label><mixed-citation>
Dai, E. C., Lee, C. F., and Ngai, Y. Y.: Landslide risk assessment and management: an overview, Eng. Geol., 64, 65–87,
<a href="https://doi.org/10.1016/S0013-7952(01)00093-X" target="_blank">https://doi.org/10.1016/S0013-7952(01)00093-X</a>, 2002.
</mixed-citation></ref-html>
<ref-html id="bib1.bib20"><label>20</label><mixed-citation>
Dorren, L. K. A.: Rockyfor3D (V5.1) Transparent description of the complete
3D rockfall model, available at: <a href="https://www.ecorisq.com" target="_blank"/> (last access: 1 June 2016), 2012.
</mixed-citation></ref-html>
<ref-html id="bib1.bib21"><label>21</label><mixed-citation>
Fell, R., Corominas, J., Bonnard, C., Cascini, L., Leroi, E., and Savage, W.:
Guidelines for landslide susceptibility, hazard and risk zoning for land-use
planning, Eng. Geol., 102, 85–98, <a href="https://doi.org/10.1016/j.enggeo.2008.03.022" target="_blank">https://doi.org/10.1016/j.enggeo.2008.03.022</a>, 2008a.
</mixed-citation></ref-html>
<ref-html id="bib1.bib22"><label>22</label><mixed-citation>
Fell, R., Corominas, J., Bonnard, C., Cascini, L., Leroi, E., and Savage, W.:
Guidelines for landslide susceptibility, hazard and risk zoning for land-use
planning – Commentary, Eng. Geol., 102, 99–111, <a href="https://doi.org/10.1016/j.enggeo.2008.03.014" target="_blank">https://doi.org/10.1016/j.enggeo.2008.03.014</a>, 2008b.
</mixed-citation></ref-html>
<ref-html id="bib1.bib23"><label>23</label><mixed-citation>
Ferlisi, S., Cascini, L., Corominas, J., and Matano, F.: Rockfall risk
assessment to persons travelling in vehicles along a road: the case study of
the Amalfi coastal road (southern Italy), Nat. Hazards, 62, 691–721,
<a href="https://doi.org/10.1111/nzg.12170" target="_blank">https://doi.org/10.1111/nzg.12170</a>, 2012.
</mixed-citation></ref-html>
<ref-html id="bib1.bib24"><label>24</label><mixed-citation>
Flow-2D Software: Flow-2D Reference Manual, Flow-2D Software Inc., Nutrioso, 2017.
</mixed-citation></ref-html>
<ref-html id="bib1.bib25"><label>25</label><mixed-citation>
Fuchs, S.: Susceptibility versus resilience to mountain hazards in Austria – paradigms of vulnerability revisited, Nat. Hazards Earth Syst. Sci., 9, 337–352, <a href="https://doi.org/10.5194/nhess-9-337-2009" target="_blank">https://doi.org/10.5194/nhess-9-337-2009</a>, 2009.
</mixed-citation></ref-html>
<ref-html id="bib1.bib26"><label>26</label><mixed-citation>
Fuchs, S., Heiss, K., and Hübl, J.: Towards an empirical vulnerability function for use in debris flow risk assessment, Nat. Hazards Earth Syst. Sci., 7, 495–506, <a href="https://doi.org/10.5194/nhess-7-495-2007" target="_blank">https://doi.org/10.5194/nhess-7-495-2007</a>, 2007.
</mixed-citation></ref-html>
<ref-html id="bib1.bib27"><label>27</label><mixed-citation>
Fuchs, S., Keiler, M., Sokratov, S., and Shnyparkov, A.: Spatiotemporal
dynamics: the need for an innovative approach in mountain hazard risk
management, Nat. Hazards, 68, 1217–1241,
<a href="https://doi.org/10.1007/s11069-012-0508-7" target="_blank">https://doi.org/10.1007/s11069-012-0508-7</a>, 2013.
</mixed-citation></ref-html>
<ref-html id="bib1.bib28"><label>28</label><mixed-citation>
Fuchs, S., Keiler, M., and Zischg, A.: A spatiotemporal multi-hazard exposure assessment based on property data, Nat. Hazards Earth Syst. Sci., 15, 2127–2142, <a href="https://doi.org/10.5194/nhess-15-2127-2015" target="_blank">https://doi.org/10.5194/nhess-15-2127-2015</a>, 2015.
</mixed-citation></ref-html>
<ref-html id="bib1.bib29"><label>29</label><mixed-citation>
Fuchs, S., Röthlisberger, V., Thaler, T., Zischg, A., and Keiler, M.:
Natural hazard management from a coevolutionary perspective: Exposure and
policy response in the European Alps, Ann. Am. Assoc. Geogr., 107, 382–392, <a href="https://doi.org/10.1080/24694452.2016.1235494" target="_blank">https://doi.org/10.1080/24694452.2016.1235494</a>, 2017.
</mixed-citation></ref-html>
<ref-html id="bib1.bib30"><label>30</label><mixed-citation>
Fuchs, S., Keiler, M., Ortlepp, R., Schinke, R., and Papathoma-Köhle, M.:
Recent advances in vulnerability assessment for the built environment
exposed to torrential hazards: Challenges and the way forward, J. Hydrol.,
575, 587–595, <a href="https://doi.org/10.1016/j.jhydrol.2019.05.067" target="_blank">https://doi.org/10.1016/j.jhydrol.2019.05.067</a>, 2019.
</mixed-citation></ref-html>
<ref-html id="bib1.bib31"><label>31</label><mixed-citation>
Geoconsult ZT GmbH: Gefahrenanalyse B99, Technischer Bericht Sturzprozesse,
Salzburg, 2016.
</mixed-citation></ref-html>
<ref-html id="bib1.bib32"><label>32</label><mixed-citation>
Grêt-Regamey, A. and Straub, D.: Spatially explicit avalanche risk assessment linking Bayesian networks to a GIS, Nat. Hazards Earth Syst. Sci., 6, 911–926, <a href="https://doi.org/10.5194/nhess-6-911-2006" target="_blank">https://doi.org/10.5194/nhess-6-911-2006</a>, 2006.
</mixed-citation></ref-html>
<ref-html id="bib1.bib33"><label>33</label><mixed-citation>
Guikema, S., McLay, L., and Lambert, J. H.: Infrastructure Systems, Risk
Analysis, and Resilience – Research Gaps and Opportunities, Risk Anal., 35, 560–561, <a href="https://doi.org/10.1111/risa.12416" target="_blank">https://doi.org/10.1111/risa.12416</a>, 2015.
</mixed-citation></ref-html>
<ref-html id="bib1.bib34"><label>34</label><mixed-citation>
Hendrikx, J. and Owens, I.: Modified avalanche risk equations to account for
waiting traffic on avalanche prone roads, Cold Reg. Sci. Technol., 51,
214–218, <a href="https://doi.org/10.1016/j.coldregions.2007.04.011" target="_blank">https://doi.org/10.1016/j.coldregions.2007.04.011</a>, 2008.
</mixed-citation></ref-html>
<ref-html id="bib1.bib35"><label>35</label><mixed-citation>
Hood, K.: The science of value: Economic expertise and the valuation of human
life in US federal regulatory agencies, Soc. Stud. Sci., 47, 441–465,
<a href="https://doi.org/10.1177/0306312717693465" target="_blank">https://doi.org/10.1177/0306312717693465</a>, 2017.
</mixed-citation></ref-html>
<ref-html id="bib1.bib36"><label>36</label><mixed-citation>
Hungr, O. and Beckie, R.: Assessment of the hazard from rock fall on a highway: Discussion, Can. Geotech. J., 35, 409, <a href="https://doi.org/10.1139/t98-002" target="_blank">https://doi.org/10.1139/t98-002</a>, 1998.
</mixed-citation></ref-html>
<ref-html id="bib1.bib37"><label>37</label><mixed-citation>
International Organization for Standardization: Risk management –
Principles and guidelines on implementation, ISO 31000, Geneva, 2009.
</mixed-citation></ref-html>
<ref-html id="bib1.bib38"><label>38</label><mixed-citation>
IUGS Committee on Risk Assessment: Quantitative risk assessment for slopes
and landslides – The state of the art, in: Proceedings of the International Workshop of Landslide Risk Assessment, Honolulu, USA, 3–12, 1997.
</mixed-citation></ref-html>
<ref-html id="bib1.bib39"><label>39</label><mixed-citation>
Kappes, M. S., Keiler, M., von Elverfeldt, K., and Glade, T.: Challenges of
analyzing multi-hazard risk: a review, Nat. Hazards, 64, 1925–1958,
<a href="https://doi.org/10.1007/s11069-012-0294-2" target="_blank">https://doi.org/10.1007/s11069-012-0294-2</a>, 2012a.
</mixed-citation></ref-html>
<ref-html id="bib1.bib40"><label>40</label><mixed-citation>
Kappes, M. S., Gruber, K., Frigerio, S., Bell, R., Keiler, M., and Glade, T.: The MultiRISK platform: The technical concept and application of a
regional-scale multihazard exposure analysis tool, Geomorphology, 151/152,
139–155, <a href="https://doi.org/10.1016/j.geomorph.2012.01.024" target="_blank">https://doi.org/10.1016/j.geomorph.2012.01.024</a>, 2012b.
</mixed-citation></ref-html>
<ref-html id="bib1.bib41"><label>41</label><mixed-citation>
Kirchsteiger, C.: On the use of probabilistic and deterministic methods in
risk analysis, J. Loss Prevent. Proc., 12, 399–419, <a href="https://doi.org/10.1016/S0950-4230(99)00012-1" target="_blank">https://doi.org/10.1016/S0950-4230(99)00012-1</a>, 1999.
</mixed-citation></ref-html>
<ref-html id="bib1.bib42"><label>42</label><mixed-citation>
Kristensen, K., Harbitz, C., and Harbitz, A.: Road traffic and avalanches –
methods for risk evaluation and risk management, Surv. Geophys., 24, 603–616, <a href="https://doi.org/10.1023/B:GEOP.0000006085.10702.cf" target="_blank">https://doi.org/10.1023/B:GEOP.0000006085.10702.cf</a>, 2003.
</mixed-citation></ref-html>
<ref-html id="bib1.bib43"><label>43</label><mixed-citation>
Lechowska, E.: What determines flood risk perception? A review of factors of
flood risk perception and relations between its basic elements, Nat. Hazards, 94, 1341–1366, <a href="https://doi.org/10.1007/s11069-018-3480-z" target="_blank">https://doi.org/10.1007/s11069-018-3480-z</a>, 2018.
</mixed-citation></ref-html>
<ref-html id="bib1.bib44"><label>44</label><mixed-citation>
Margreth, S., Stoffel, L., and Wilhelm, C.: Winter opening of high alpine pass roads – analysis and case studies from the Swiss Alps, Cold Reg. Sci. Technol., 37, 467–482, <a href="https://doi.org/10.1016/S0165-232X(03)00085-5" target="_blank">https://doi.org/10.1016/S0165-232X(03)00085-5</a>, 2003.
</mixed-citation></ref-html>
<ref-html id="bib1.bib45"><label>45</label><mixed-citation>
Markantonis, V., Meyer, V., and Schwarze, R.: Review Article “Valuating the intangible effects of natural hazards – review and analysis of the costing methods”, Nat. Hazards Earth Syst. Sci., 12, 1633–1640, <a href="https://doi.org/10.5194/nhess-12-1633-2012" target="_blank">https://doi.org/10.5194/nhess-12-1633-2012</a>, 2012.
</mixed-citation></ref-html>
<ref-html id="bib1.bib46"><label>46</label><mixed-citation>
Merz, B. and Thieken, A. H.: Separating natural and epistemic uncertainty in
flood frequency analysis, J. Hydrol., 309, 114–132,
<a href="https://doi.org/10.1016/j.jhydrol.2004.11.015" target="_blank">https://doi.org/10.1016/j.jhydrol.2004.11.015</a>, 2005.
</mixed-citation></ref-html>
<ref-html id="bib1.bib47"><label>47</label><mixed-citation>
Merz, B. and Thieken, A. H.: Flood risk curves and associated uncertainty
bounds, Nat. Hazards, 51, 437–458, <a href="https://doi.org/10.1007/s11069-009-9452-6" target="_blank">https://doi.org/10.1007/s11069-009-9452-6</a>, 2009.
</mixed-citation></ref-html>
<ref-html id="bib1.bib48"><label>48</label><mixed-citation>
Merz, B., Kreibich, H., Thieken, A., and Schmidtke, R.: Estimation uncertainty of direct monetary flood damage to buildings, Nat. Hazards Earth Syst. Sci., 4, 153–163, <a href="https://doi.org/10.5194/nhess-4-153-2004" target="_blank">https://doi.org/10.5194/nhess-4-153-2004</a>, 2004.
</mixed-citation></ref-html>
<ref-html id="bib1.bib49"><label>49</label><mixed-citation>
Merz, B., Elmer, F., and Thieken, A. H.: Significance of “high probability/low damage” versus “low probability/high damage” flood events, Nat. Hazards Earth Syst. Sci., 9, 1033–1046, <a href="https://doi.org/10.5194/nhess-9-1033-2009" target="_blank">https://doi.org/10.5194/nhess-9-1033-2009</a>, 2009.
</mixed-citation></ref-html>
<ref-html id="bib1.bib50"><label>50</label><mixed-citation>
Merz, B., Kreibich, H., Schwarze, R., and Thieken, A.: Review article “Assessment of economic flood damage”, Nat. Hazards Earth Syst. Sci., 10, 1697–1724, <a href="https://doi.org/10.5194/nhess-10-1697-2010" target="_blank">https://doi.org/10.5194/nhess-10-1697-2010</a>, 2010.
</mixed-citation></ref-html>
<ref-html id="bib1.bib51"><label>51</label><mixed-citation>
Meyer, V., Becker, N., Markantonis, V., Schwarze, R., van den Bergh, J. C. J. M., Bouwer, L. M., Bubeck, P., Ciavola, P., Genovese, E., Green, C., Hallegatte, S., Kreibich, H., Lequeux, Q., Logar, I., Papyrakis, E., Pfurtscheller, C., Poussin, J., Przyluski, V., Thieken, A. H., and Viavattene, C.: Review article: Assessing the costs of natural hazards – state of the art and knowledge gaps, Nat. Hazards Earth Syst. Sci., 13, 1351–1373, <a href="https://doi.org/10.5194/nhess-13-1351-2013" target="_blank">https://doi.org/10.5194/nhess-13-1351-2013</a>, 2013.
</mixed-citation></ref-html>
<ref-html id="bib1.bib52"><label>52</label><mixed-citation>
Michoud, C., Derron, M.-H., Horton, P., Jaboyedoff, M., Baillifard, F.-J., Loye, A., Nicolet, P., Pedrazzini, A., and Queyrel, A.: Rockfall hazard and risk assessments along roads at a regional scale: example in Swiss Alps, Nat. Hazards Earth Syst. Sci., 12, 615–629, <a href="https://doi.org/10.5194/nhess-12-615-2012" target="_blank">https://doi.org/10.5194/nhess-12-615-2012</a>, 2012.
</mixed-citation></ref-html>
<ref-html id="bib1.bib53"><label>53</label><mixed-citation>
Oberndorfer, S.: Technischer Bericht – Gefahrenanalyse Wildbach – Lawinengefahren B99 Katschberg Straße, Radstadt – Obertauern – Mauterndorf, km24,70–km62,60, Ziviltechnikerkanzlei Oberndorfer, Leogang, 2016.
</mixed-citation></ref-html>
<ref-html id="bib1.bib54"><label>54</label><mixed-citation>
Oberndorfer, S., Fuchs, S., Rickenmann, D., and Andrecs, P.:
Vulnerabilitätsanalyse und monetäre Schadensbewertung von
Wildbachereignissen in Österreich, Bundesforschung- und Ausbildungszentrum für Wald, Naturgefahren und Landschaft, Vienna, Austria, 5&thinsp;pp., 2007.
</mixed-citation></ref-html>
<ref-html id="bib1.bib55"><label>55</label><mixed-citation>
Papathoma-Köhle, M., Kappes, M., Keiler, M., and Glade, T.: Physical
vulnerability assessment for alpine hazards: state of the art and future
needs, Nat. Hazards, 58, 645–680, <a href="https://doi.org/10.1007/s11069-010-9632-4" target="_blank">https://doi.org/10.1007/s11069-010-9632-4</a>, 2011.
</mixed-citation></ref-html>
<ref-html id="bib1.bib56"><label>56</label><mixed-citation>
Papathoma-Köhle, M., Gems, B., Sturm, M., and Fuchs, S.: Matrices, curves
and indicators: A review of approaches to assess physical vulnerability to
debris flow, Earth-Sci. Rev., 171, 272–288,
<a href="https://doi.org/10.1016/j.earscirev.2017.06.007" target="_blank">https://doi.org/10.1016/j.earscirev.2017.06.007</a>, 2017.
</mixed-citation></ref-html>
<ref-html id="bib1.bib57"><label>57</label><mixed-citation>
Republik Österreich: Forstgesetz 1975, BGBl 440/1975, Republik
Österreich, Vienna, 1975.
</mixed-citation></ref-html>
<ref-html id="bib1.bib58"><label>58</label><mixed-citation>
Republik Österreich: Verordnung des Bundesministeriums für Land- und
Forstwirtschaft vom 30. Juli 1976 über die Gefahrenzonenpläne, BGBl 436/1975, Republik Österreich, Vienna, 1976.
</mixed-citation></ref-html>
<ref-html id="bib1.bib59"><label>59</label><mixed-citation>
Rheinberger, C. M., Bründl, M., and Rhyner, J.: Dealing with the white death: Avalanche risk management for traffic routes, Risk Anal., 29, 76–94,
<a href="https://doi.org/10.1111/j.1539-6924.2008.01127.x" target="_blank">https://doi.org/10.1111/j.1539-6924.2008.01127.x</a>, 2009.
</mixed-citation></ref-html>
<ref-html id="bib1.bib60"><label>60</label><mixed-citation>
RiskConsult GmbH: RIAAT Risk Administration and Analysis Tools, Manual,
Version 28-F01, Innsbruck, 2015.
</mixed-citation></ref-html>
<ref-html id="bib1.bib61"><label>61</label><mixed-citation>
Roberds, W.: Estimating temporal and spatial variability and vulnerability,
in:  Landslide risk management, edited by: Hungr, O., Fell, R., Couture, R., and Eberhardt, E., Taylor and Francis Group, London, UK, 129–157, 2005.
</mixed-citation></ref-html>
<ref-html id="bib1.bib62"><label>62</label><mixed-citation>
Sampl, P.: SamosAT – Beschreibung der Modelltheorie und Numerik, AVL List GmbH, Graz, 2007.
</mixed-citation></ref-html>
<ref-html id="bib1.bib63"><label>63</label><mixed-citation>
Sander, P.: Probabilistische Risiko-Analyse für Bauprojekte. Entwicklung
eines branchenorientierten softwaregestützten Risiko-Analyse-Systems,
Innsbruck University Press, Innsbruck, Austria, 2012.
</mixed-citation></ref-html>
<ref-html id="bib1.bib64"><label>64</label><mixed-citation>
Sander, P., Reilly, J. J., and Moergeli, A.: Quantitative Risk Analysis –
Fallacy of the Single Number, in: ITA World Tunnel Congress 2015, Dubrovnik, Croatia, 2015.

</mixed-citation></ref-html>
<ref-html id="bib1.bib65"><label>65</label><mixed-citation>
Schaerer, P.: The avalanche-hazard index, Ann. Glaciol., 13, 241–247, 1989.
</mixed-citation></ref-html>
<ref-html id="bib1.bib66"><label>66</label><mixed-citation>
Schaub, Y. and Bründl, M: Zur Sensitivität der Risikoberechnung und
Maßnahmenbewertung von Naturgefahren, Schweizerische Zeitschrift für
Forstwesen, 161, 27–35, <a href="https://doi.org/10.3188/szf.2010.0027" target="_blank">https://doi.org/10.3188/szf.2010.0027</a>, 2010.
</mixed-citation></ref-html>
<ref-html id="bib1.bib67"><label>67</label><mixed-citation>
Schlögl, M., Richter, G., Avian, M., Thaler, T., Heiss, G., Lenz, G., and Fuchs, S.: On the nexus between landslide susceptibility and transport infrastructure – an agent-based approach, Nat. Hazards Earth Syst. Sci., 19, 201–219, <a href="https://doi.org/10.5194/nhess-19-201-2019" target="_blank">https://doi.org/10.5194/nhess-19-201-2019</a>, 2019.
</mixed-citation></ref-html>
<ref-html id="bib1.bib68"><label>68</label><mixed-citation>
Špačková, O., Rimböck, A., and Straub, D.: Risk management in
Bavarian Alpine torrents: a framework for flood risk quantification
accounting for subscenarios, in: Proc. of the IAEG Congress 2014, IAEG XII
congress, Torino, Italy, 2014.
</mixed-citation></ref-html>
<ref-html id="bib1.bib69"><label>69</label><mixed-citation>
Špačková, O.: RAT Risk Analysis Tool. Risk assessment and cost
benefit analysis of risk mitigation strategies – Methodology, Technical University of Munich, Engineering Risk Analysis Group, Munich, Germany,  2016.
</mixed-citation></ref-html>
<ref-html id="bib1.bib70"><label>70</label><mixed-citation>
Tecklenburg, T.: Risikomanagement bei der Akquisition von Großprojekten
in der Bauwirtschaft, PhD thesis, Schüling Verlag, Münster, Germany, 2003.
</mixed-citation></ref-html>
<ref-html id="bib1.bib71"><label>71</label><mixed-citation>
UNDRO: Natural disasters and vulnerability analysis, Department of
Humanitarian Affairs/United Nations Disaster Relief Office, Geneva, 1979.
</mixed-citation></ref-html>
<ref-html id="bib1.bib72"><label>72</label><mixed-citation>
UNISDR: Living with risk: A global review of disaster reduction initiatives,
United Nations Publication, Geneva, 2004.
</mixed-citation></ref-html>
<ref-html id="bib1.bib73"><label>73</label><mixed-citation>
Unterrader, S., Almond, P., and Fuchs, S.: Rockfall in the Port Hills of
Christchurch: Seismic and non-seismic fatality risk on roads, New Zeal.
Geogr., 74, 3–14, <a href="https://doi.org/10.1111/nzg.12170" target="_blank">https://doi.org/10.1111/nzg.12170</a>, 2018.
</mixed-citation></ref-html>
<ref-html id="bib1.bib74"><label>74</label><mixed-citation>
Varnes, D.: Landslide hazard zonation: a review of principles and practice,
UNESCO, Paris, 1984.
</mixed-citation></ref-html>
<ref-html id="bib1.bib75"><label>75</label><mixed-citation>
Wachinger, G., Renn, O., Begg, C., and Kuhlicke, C.: The risk perception
paradox – implications for governance and communication of natural hazards,
Risk Anal., 33, 1049–1065, <a href="https://doi.org/10.1111/j.1539-6924.2012.01942.x" target="_blank">https://doi.org/10.1111/j.1539-6924.2012.01942.x</a>,
2013.
</mixed-citation></ref-html>
<ref-html id="bib1.bib76"><label>76</label><mixed-citation>
Wastl, M., Stötter, J., and Kleindienst, H.: Avalanche risk assessment for mountain roads: a case study from Iceland, Nat. Hazards, 56, 465–480,
<a href="https://doi.org/10.1007/s11069-010-9703-6" target="_blank">https://doi.org/10.1007/s11069-010-9703-6</a>, 2011.
</mixed-citation></ref-html>
<ref-html id="bib1.bib77"><label>77</label><mixed-citation>
Winter, B., Schneeberger, K., Huttenlau, M., and Stötter, J.: Sources of
uncertainty in a probabilistic flood risk model, Nat. Hazards, 91, 431–446,
<a href="https://doi.org/10.1007/s11069-017-3135-5" target="_blank">https://doi.org/10.1007/s11069-017-3135-5</a>, 2018.
</mixed-citation></ref-html>
<ref-html id="bib1.bib78"><label>78</label><mixed-citation>
Zischg, A., Fuchs, S., Keiler, M., and Meißl, G.: Modelling the system behaviour of wet snow avalanches using an expert system approach for risk management on high alpine traffic roads, Nat. Hazards Earth Syst. Sci., 5, 821–832, <a href="https://doi.org/10.5194/nhess-5-821-2005" target="_blank">https://doi.org/10.5194/nhess-5-821-2005</a>, 2005.
</mixed-citation></ref-html>--></article>
